Empfohlen wird auf dem Titel der Einsatz eines vollflächigen Hintergrundbildes (Format: 25,4 x 19,05 cm): • Bild auf Master platzieren (JPG, RGB, 144dpi) • Bild in den Hintergrund legen Empfohlen wird auf dem Titel der Einsatz eines vollflächigen Hintergrundbildes (Format: 25,4 x 19,05 cm): • Bild auf Master platzieren (JPG, RGB, 144dpi) • Bild in den Hintergrund legen Copyright © Siemens AG 2007. All rights reserved Rotating and Electrical Equipment for LNG Plants, Transport and Terminals 2010 Romania Gas Forum 2010 Romania Gas Forum Optimizing Optimizing the the LNG LNG Value Value Chain Chain Copyright © Siemens AG 2010. All rights reserved Photo Courtesy of Enagás

2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Embed Size (px)

Citation preview

Page 1: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Empfohlen wird auf dem Titel der Einsatz eines vollflächigen Hintergrundbildes (Format: 25,4 x 19,05 cm):• Bild auf Master platzieren (JPG, RGB, 144dpi)• Bild in den Hintergrund legen

Empfohlen wird auf dem Titel der Einsatz eines vollflächigen Hintergrundbildes (Format: 25,4 x 19,05 cm):• Bild auf Master platzieren (JPG, RGB, 144dpi)• Bild in den Hintergrund legen Copyright © Siemens AG 2007. All rights reserved

Rotating and Electrical Equipment for LNG Plants, Transport and Terminals

2010 Romania Gas Forum2010 Romania Gas Forum

„„ OptimizingOptimizing thethe LNGLNG ValueValue ChainChain ““

Copyright © Siemens AG 2010. All rights reserved

Photo Courtesy of Enagás

Page 2: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 2 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

Rotating and Electrical Equipment for LNG Plants, Transport and Terminals

LNG Production

LNG Transport

LNG Terminals

Advanced Solutions ����

Drives for Main Refrigeration Loops ����

Compression ����

Field Instrumentation and Analytics ����

References ����

Automation ����

Power Generation ����

Power Transmission and Distribution ����

Power, Propulsion, Compression ����

Automation and Telecommunication ����

Power Transmission and Distribution ����

Boil-Off Gas Compression ����

Terminal Management and Automation ���� References ����

Instrumentation, Actuators ����

Infrastructure ����

Page 3: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 3 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Advanced Solutions

Next��OverviewPrevious

GT-LNG — Better Solutions ����

eLNG — The Future Concept ����

All-Electric Expertise from a Single Source ����

Mastering Performance of Large-Scale Machine Trains ����

Page 4: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 4 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production/Advanced SolutionsGT-LNG — Better Solutions

Next��OverviewPrevious

GT – LNG� Next-generation LNG plants: annual output of 6 to

8 million tons or more.Requiring upwards of 240 MW of total compressor power for the refrigeration.

� Requiring just four days of maintenance after 16,00 0 equivalent operating hours (EOH) and 16 days after 48,000 EOH.

� Can handle both low calorific fuel gas and gas with a high content of nitrogen.

� Proven track record of more than 220 installations in generator drive applications; typically more demanding than continuous-load LNG operation.

� For small-size refrigeration trains: SGT-600 and SG T-700 mechanical drives, rated ISO 25.5 MW and 30 M W respectively.

GT – LNG — Better Solutions� Renowned SGT6-2000E (ex V84.2, 110 MW (ISO) at 3,60 0

rpm) and SGT5-2000E (ex V94.2, 160 MW (ISO) at 3,00 0 rpm) as LNG mechanical drive gas turbines.

� Approx. 20% higher power rating than currently available products in their respective class.

Page 5: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 5 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production/Advanced SolutionseLNG — The Future Concept

Next��OverviewPrevious

eLNG — The Future Concept� Extensive experience with virtually all principal

components and systems for all-electric LNG plant schemes.

� Siemens variable speed drive systems (VSDS)

� Proven reliability over more than 30 years in a host of applications.

� Available in power ratings to drive today’s largest compressors.

� Improving plant availability by at least 15 days/year of over today’s gas turbines as main drives for LNG refrigerant compressors.

� Huge operational advantages and substantial improvement in plant economics.

Page 6: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 6 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production/Advanced SolutionsAll-Electric Expertise from a Single Source

Next��OverviewPrevious

All-Electric –Expertise from a Single Source� A single point of contact for compression solution,

electricity production, transmission and distribution, automation and control

� Reduction of interfaces, simplifying project management and communications.

� Reduction of lead, installation and commissioning times.

� Reduction of installed costs through standardized and modularized solutions.

� Improved overall plant operability and availability.

Page 7: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 7 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production/Advanced SolutionsPerformance of Large-Scale Machine Trains

Next��OverviewPrevious

Mastering Performance of Large-Scale Machine Trains� State-of-the-art test-bed facilities in Berlin and

Duisburg, Germany.

� Full load string-testing of compression solutions for tomorrow’s LNG plants.

� Load performance-test of complete VSDS packages.

� Functional testing of combined and superimposed control systems of eLNG “power-to-compression” packages.

� Ensuring uncompromising functionality and reliability of motor or turbine-driven compressor trains before shipping.

Page 8: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 8 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Drives for Main Refrigeration Loops

Next��OverviewPrevious

�Gas turbines of up to 160 MW (ISO)

�Electrical variable-speed drive systems (VSDS) of 75 to 90 MW as main drives

�Electrical variable speed drive systems (VSDS) from 10 to 40 MW as starter/helper motor, or modular starter/helper motor/generator packages for gas turbines. Water-air cooled or water-water cooled electrical systems for all known environments

Drives for Main Refrigeration Loops

Page 9: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 9 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Compression

Next��OverviewPrevious

�Propane compressors of up to 90 MW

�Mixed-refrigerant compressors of up to 90 MW, horizontally or vertically split, nozzles up or down, skid mounted with integrated or separate lube oil systems

End-Flash Gas Compression

�Compressors of up to 40 MW

Boil-Off Gas Compression

�Compressors of up to 15 MW, single and tandem casing

Compressors for Main Refrigeration Loops

Page 10: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 10 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Field Instrumentation and Analytics

Next��OverviewPrevious

�Pressure transmitters

�Temperature transmitters

�Flow meters

�Level measuring instruments

�Gas analysers

�Remote terminal units

�Level measurement in LNG storage tanks and for pump control

�Level switches for detection of minimum and maximum level in tanks

�Valve positioner for valve control

�Chromatograph for determination of gas composition and quality; measuring of calorific value

�Moisture and dew-point measurement in natural gas

Field Instrumentation and Analytics

Page 11: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 11 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Automation

Next��OverviewPrevious

Automation

� Integrated distributed control system (DCS) for VSDS and compressor automation, including associated instrumentation

�Advanced operations control solutions

� Integrated data visualization software enabling informed decisions regarding utilization of assets and their operating efficiency

�Energy management and control system (EMCS)

Page 12: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 12 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Power Generation

Next��OverviewPrevious

Power Generation

�Simple, combined and triple-cycle schemes with gas and steam turbines including generators and auxiliaries

�Heat recovery steam generators

�Water steam cycle solutions

�Electrical and controls for supplied equipment

�Cranes and heat, ventilation and air conditioning (HVAC) for turbine building

�Cooling water systems

Page 13: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 13 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Power Transmission and Distribution

Next��OverviewPrevious

�Simple, combined and triple-cycle schemes with gas and steam turbines including generators and auxiliaries

�Heat recovery steam generators

�Water steam cycle solutions

Power Transmission and Distribution

�Electrical and controls for supplied equipment

�Cranes and heat, ventilation and air conditioning (HVAC) for turbine building

�Cooling water systems

Page 14: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 14 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Reference: Oman LNG L.L.C. Co.

Siemens scope of supply:

� engineering, manufacturing and supply of four VSDS systems as a gas turbine starter/helper VSDS

� converter transformers

� containerized LCI frequency converters

� synchronous motors and auxiliaries; tandem-casing BOG compressor type STC-SH (12-6-A) + STC-SV (10-7-A), the world’s largest BOG single shaft compressor at time of order. All components were designed in accordance with Shell DEP specifications

Next��OverviewPrevious

This two-train LNG plant in Oman has been equipped with starter/helper drives for the gas turbines, achieving a 12.5% increase in production.

Page 15: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 15 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Reference: Shell, Brunei

Next��OverviewPrevious

In 2006, after 34 years of continuous operation in start/stop mode, two Siemens-made boil-off gas compressors at Shell’s Brunei LNG loading terminal were inspected for the first time. Bearings showed a mere shadow of wear, but were replaced as part of a preventive maintenance scheme. Delivered in 1972, these were the world’s very first BOG compressors with adjustable inlet guide vanes — a technology that has become standard for BOG compression applications.

Page 16: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 16 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Reference: Statoil, Hammerfest

Siemens scope of supply:

� The world's largest variable speed drive systems (VSDS) rated 65 MW at 3600 rpm for the pre-cooling and sub-cooling compressors

� vsds-driven compressor string for the methane mix train

� 32-MW VSDS for the liquefaction compressor� CO2 re-injection compressor� harmonic study� load commutated inverter (LCI) frequency converter

units, drive control and fault diagnosis systems� transformers� containerized harmonic filters� converter cooling systems and auxiliary equipment

Next��OverviewPrevious

Melkøya Island, off Hammerfest, Norway. The world’s first all-electric LNG plant. Designed for flawless operation at arctic temperatures and rapidly changing operating conditions.

Page 17: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 17 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production Reference: GASCO, Abu Dhabi

Next��OverviewPrevious

Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS) contracted Siemens for the modernization and expansion of the power supply and distribution system of the gas liquefaction plant on “Das Island”. The system is designed to improve security of supply and increase available power reserves. As part of the project the plant will have a new medium-voltage switching substation, a new power distribution system and an additional gas turbine with an output of 30 MW.

Page 18: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 18 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production More References 01

Next��OverviewPrevious

In 2005 Pertamina/ BP ordered two tandem casing trains for an LNG plant in Indonesia.

Siemens scope of supply:

� two trains with tandem-casing BOG compressors type STC-SH (10-6-A) + STC-SH (10-6-A)

� IGV control

� dry gas seals encapsulated in heated seal carrier

BP, Indonesia Nigeria LNG, Nigeria

Relying on Siemens’ experience in LNG applications, Nigeria LNG ordered rotating equipment for propane compression for their Bonny Island LNG project.

Siemens scope of supply:

� three compressor trains, each comprising one horizontally split single-shaft compressor STC-SH (10-6-A) and electric motor; delivered in 2000.

Page 19: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 19 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Production More References 02

Next��OverviewPrevious

Ras Laffan, Qatar, RasGas LNG plant.

Siemens scope of supply:

� project management

� power distribution system consisting of: 33 kV GIS and 6.6 kV AIS

� annunciation system and medium voltage bus ducts

� electrical Integrated Control System ELICS

� telecommunication system (FOTS via Open Transport Network (OTN))

� supervision and commissioning services

RasGas LNG, Qatar Nigeria LNG, Nigeria

The world’s largest end-flash gas (EFG) single-shaft compressor was manufactured for Nigeria LNG, NNPC.

Siemens scope of supply:

� five trains with tandem-casing EFG compressors type STC-SH (14-6-A) + STC-SV (14-8-B), 900 mm impeller diameter, IGV control and dry gas seals encapsulated in heated seal carrier.

Page 20: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 20 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TransportPower, Propulsion, Compression

Next��OverviewPrevious

Power Generation and Distribution System�COGES plants with dual-fuel gas

turbines of 15 MW

�MV generators�MV switchgear

�Propulsion transformers

�MV converters

�Electric propulsion motors�Drive control and safety systems

�Power management system

� Induction and synchronous motors (direct or gear-type) up to 20 MW

Boil-Off Gas

�Boil-off gas compressors and drives for re-liquefaction plants of up to 1.3 MW

Propulsion System

Page 21: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 21 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TransportAutomation and Telecommunication

Next��OverviewPrevious

�Automation platform for machinery and cargo based on a uniform hardandsoftware solution

Integrated Automation Systems (IAS)

Cargo Handling

�Cargo monitoring and transfer system with ship-to-shore communication

Sensors

�Field instrumentation and sensors for machinery and LNG cargo systems

Page 22: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 22 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TerminalsBoil-Off Gas Compression

Next��OverviewPrevious

Boil-Off Gas Compression

�Compressors from 1.5 to 4 MW

�E-motors from 3 to 8 MW

Page 23: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 23 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TerminalsTerminal Management and Automation

Next��OverviewPrevious

Terminal Management and Automation

�Automation and safety systems

�Automated loading process

�Tank gauging

�Distribution planning

�Product reconciliation and inventory management

�Business system integration

�Regasification process automation

�Station control (DCS)

� Jetty control (DCS)

�Emergency shut down (ESD)

�Fire and gas protection

�Berth and mooring control

�Ship-to-shore communication

Page 24: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 24 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TerminalsPower Transmission and Distribution

Next��OverviewPrevious

�Medium-voltage power supply

�Low voltage power supply

�Uninterruptible power supply

�Diesel generators

Power Transmission and Distribution

Page 25: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 25 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TerminalsInstrumentation, Actuators

Next��OverviewPrevious

�Process instrumentation

�Capacitance level measurement systems

�Radar level measurement systems

Instrumentation, Actuators

Page 26: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 26 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG TerminalsInfrastructure

Next��OverviewPrevious

�CCTV

� Intercom

�Telephone system (Voice over IP)

�Security and access control

�Tracking of maintenance staff

Infrastructure

Page 27: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 27 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Terminals Reference: National Grid Transco, UK

Next��OverviewPrevious

Isle of Grain, Kent, UK; LNG receiving terminal of National Grid Transco (NGT).

Siemens scope of supply:

� PCS 7

� Quadlog; emergency shutdown system (ESD)

� fire and gas detection system (F&G)

� LC500 cryogenic capacitance level measurement for cryogenic pump control

� engineering services

Page 28: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 28 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Terminals Reference: Algonquin Gas Transmission Co., USA

Next��OverviewPrevious

Providence, Rhode Island, USA; LNG re-gasification facility of Algonquin Gas Transmission Co.

Siemens scope of supply:

� project management

� system integration

� full station supervisory control

� station control panel

� LNG tank and pump area control panel

� gas send-out area control panel (metering)

� integration of other vendors skid control panels

� station HMI and full Ethernet network integration

� testing, start-up and commissioning

� documentation and training

Page 29: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 29 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Terminals More References 01

Next��OverviewPrevious

In 1997, Siemens delivered the world’s first single-shaft turbo-compressor for boil-off gas compression at an LNG receiving terminal. The 2 x 50% machines were designed for the DABHOL LNG receiving terminal in India.

Siemens scope of supply:

� two trains of STC-SH (06-7-A) single-casing compressors with dry gas seals and adjustable inlet guide vanes (IGV).

DABHOL LNG, India Shell/Total/Mitsui, Mexico

In 2003, Shell/Total/Mitsui ordered the worldwide first 1 x 100% single-shaft turbo-compressor for BOG recovery for the LNG receiving terminal Altamira. The compressor unit can cope with the large volume fluctuation via IGV control and automatic start-stop operation.

Siemens scope of supply:

� one single-casing STV-SV (06-6-A) BOG compressor with IGV control and dry gas seals encapsulated in heated seal carrier.

Page 30: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 30 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

LNG Terminals More References 02

Next��OverviewPrevious

SINES LNG receiving terminal, Portugal, operated by Transgas Atlantico.

Siemens scope of supply:

� LC500 cryogenic capacitance level measurement

� Sipart PS2 intelligent positioner

� SITRANS LR200 two-wire Radar level system

� instrumentation

� field devices

� cabling

� automation of valves

Transgas Atlantico, Portugal

Page 31: 2010 Romania Gas Forum - Petroleum · PDF fileRequiring just four days of maintenance after 16,000 equivalent operating hours ... (ex V94.2, 160 MW (ISO) ... Siemens scope of supply:

Page 31 June 2nd 2010Copyright © Siemens AG 2007. All rights reserved

Romania Gas Forum 2010

Advanced Solutions for LNG

Next��OverviewPrevious

Questions?

Peter J. Grobmüller

CEO Divizie Petrol si Gaze

Siemens srl.

[email protected]