52
MADE IN GERMANY BERGBAU | MINING

BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

M A D E I N G E R M A N Y

B E R G B A U | M I N I N G

Page 2: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

02

W E LT W E I T I M E I N S AT Z | I N U S E W O R L D W I D E

B E T E K H A R T M E TA L L - W E R K Z E U G E | B E T E K T U N G S T E N C A R B I D E T O O L S

S U R FA C E T E C H N O L O G I E S

U N D E R G R O U N D T E C H N O L O G I E S

StraßenfräsenRoad Milling

Surface MiningSurface Mining

StabilisierenStabilising

GrabenfräsenTrenching

SpezialtiefbauFoundation Drilling

BergbauMining

BaggeranbaufräsenHydraulic Milling Cutters

TunnelbauTunnelling

TungStudsTungStuds

HDDHDD

Brechen & MischenCrushing & Mixing

GleisbauRail Track Construction

E N V I R O N M E N TA L T E C H N O L O G I E S

AgrartechnikAgriculture

Forst und RecyclingForestry and Recycling

Grader ToolsGrader Tools

HartmetallTungsten Carbide

Page 3: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

03

F E S T V E R B U N D E N F Ü R H Ä RT E S T E B E L A S T U N G E N | F I R M LY B O N D E D F O R E X T R E M E D E M A N D S

H A R T M E TA L L U N D S TA H L | T U N G S T E N C A R B I D E A N D S T E E L

BETEK-Werkzeuge entstehen aus Hartmetall und Stahl: Hartmetall für die ver-schleißfeste Meißelspitze, Stahl für Meißelkopf und Werkzeugschaft. Um die bei-den Materialien dauerhaft zu verbinden, wurden bei BETEK eigene Verfahren und spezielle Lötanlagen entwickelt. Die Verlötung der beiden Materialien erfolgt mit Überwachung und Dokumentation der Fertigungsparameter. Zusätzlich wird die Lötung auf Scherfestigkeit geprüft.

Dieser Aufwand zahlt sich im harten Einsatz aus. Die Werkzeuge können dabei sehr heiß werden. Da Hartmetall und Stahl unterschiedliche Ausdehnungseigen-schaften bei Wärme haben, treten extreme Zugspannungen auf. Und hier kommt das Speziallot von BETEK ins Spiel, das Hartmetall mit Stahl verbindet. Es nimmt die Zugspannungen auf und hält diesen Stand – damit Helden der Baustelle keine Zeit durch Werkzeugbruch verlieren.

Steel and carbide are two materials with totally different expansion coefficients when subjected to heat. Nevertheless, it is of steel and tungsten carbide that our tools are made, with tungsten carbide for the wear-resistant tip, and steel for the tool shank. Since tools reach high temperatures during use, extreme tensile stresses are generated. These stresses are absorbed by a special brazing material that joins the tungsten carbide tip to the steel section.

We have developed our own methods and systems for this brazing process, which is carried out on fully automated machines with the process covered in an inert protective gas. Manufacturing parameters are fully monitored and documented to ensure consistent quality. Afterwards, brazing shear strengths are checked to ensure that our “Masters of the construction site” lose no time due to broken tools!

Page 4: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

04

K U N D E N S E RV I C E

C U S T O M E R S E RV I C E

· Wirtschaftliche Kunden-lösungen aufgrund flexibler Strukturen

· Individuelles, schnelles Ein gehen auf Kunden-anforderungen

· Cost-effective client solutions based on flexible structures

· Tailored, fast response to client requirements

E N T W I C K L U N G & K O N S T R U K T I O N

H A RT M E TA L L -F E RT I G U N G

P R O D U K T I O N S B E R E I C H L Ö T E N

D E V E L O P M E N T & D E S I G NT U N G S T E N C A R B I D E M A N U FA C T U R I N G

T H E S O L D E R I N G S I D E O F P R O D U C T I O N

· Zeitnahe Realisation von Mustern und Prototypen

· Konkurrenzfähige Preise durch enge Zusammen-arbeit mit allen Produktionsbereichen

· Speedy creation of samples and prototypes

· Competitive prices thanks to close collabo-ration with all areas of production

· Verwendung von Roh-stoffen hoher Reinheit für hohe Festigkeit

· Konstant hohe, poren-freie Hartmetallqualität durch eine exakte Prozessführung dank jahre langer Erfahrung und Know-how

· Raw materials of high purity used for great strength

· Consistently high, pore- free tungsten carbide quality produced through an exact process resulting from years of experience and know-how

Eigens und bis zur Perfektion entwickelte Produktions-anlagen und Fertigungs-prozesse von den Experten in der Verbindung von Hartmetall und Stahl

Production equipment and processes specially developed to the utmost degree of perfection by experts in combining tungsten carbide and steel

D I E E N T S T E H U N G | T H E G E N E S I S

B E T E K H I G H - T E C H - W E R K Z E U G E | T O O L S

Page 5: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

05

A U T O M AT I S I E R U N G Q U A L I T Ä T S S I C H E R U N G T R A I N I N G L O G I S T I K

A U T O M AT I O N Q U A L I T Y A S S U R A N C E T R A I N I N G L O G I S T I C S

Wettbewerbsfähigkeit auf dem Weltmarkt durch einen hohen Automati-sierungsgrad und flexible Fertigungsanlagen

Able to compete on the world market by virtue of a high degree of automation and flexible manufacturing plants

Permanente Qualitäts-prüfungen der gesamten Fertigungskette bis zur Baustelle nach DIN ISO 9001:2000 und DIN EN ISO 14001

Permanent checking of quality in accordance with DIN ISO 9001:2000 and DIN EN ISO 14001 along the entire production chain all the way to the construction site

Anwender-Schulungen im Hause BETEK oder direkt auf der Baustelle für langfristigen wirtschaftlichen Erfolg und Kundenzufrieden heit

User training sessions at Betek or on the construction site itself to ensure long-term economic success and client satisfaction

kurzfristige Reaktions-möglichkeiten durch· Einsatz modernster EDV

und optimale Logistik-Vernetzung

· Lagerhaltung von Standardprodukten

Able to react quickly thanks to: · The use of cutting edge

IT and optimum logistics links

· Standard products kept in store

D I E E N T S T E H U N G | T H E G E N E S I S

B E T E K H I G H - T E C H - W E R K Z E U G E | T O O L S

Page 6: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

06

W E R K Z E U G A U S WA H L | T O O L S E L E C T I O N

D A S W E R K Z E U G F Ü R I H R E A N W E N D U N G | T H E T O O L F O R Y O U R A P P L I C AT I O N

geringeMaschinenleistung

low machineproductivity

hohe Maschinenleistung

high machine productivity

FelsRock

weicher BodenSoft ground

Page 7: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

07

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 2 5 M M / 1 "

BTK140 BG25P-12.4368

BTK107 BG25P-74.436320 20

S I 1 8 4

12 / 0,46

21,7

/ 0,

85

68 /

2,68

133,

5 / 5

,26

25 / 0,98

43 / 1,69

22 / 0,85

20,5

/0,8

1

63/ 2

,48

25 / 0,98

43 / 1,69

128,

5/5

,06

BTK107-Dual BG25HP-74.4363 20

Ø 22 / 0,85

20,5

/ 0,8

1

63 /

2,48

43 / 1,69

25 / 0,98

128,

5 / 5

,06

BHR185 B132-101-B 5

25,5

/ 1,00

85/3

,35

23 / 0,91

132 / 5,20

71/2

,80

101

/ 3, 9

7

50°

Page 8: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

08

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 2 5 M M / 1 "

BTKX145BG25K-08.4463

BTKX129 BG25K-12.4470

BTKX107 BG25K-74.436320 20 20

8 / 0,3115

/ 0,

59

63 /

2,48

44 / 1,73

25 / 0,98

130

/ 5,1

2

70 /

2,7 6

137

/ 5,3

9

44 / 1,73

12 / 0,46

19 /

0,75

25 / 0,98

Ø 22 / 0,85

20,5

/ 0,

8 1

63 /

2,4 8

43 / 1,69

25 / 0,98

128,

5 / 5

,06

BTKX128SBG25K-09.4366 20

9,2 / 0,36

18,5

/ 0,

73

43 / 1,69Ø25 / 0,98

66 /

2,60

133

/ 5, 2

4

Page 9: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

09

BGF14 BG30P-11.5184F

BGF29 BG30P-15.5084

BGF38 BG30P-61.5084

BGF22BG30P-15.5087

BGF23BG30P-70.5085P

BGF26BG30P-74.5084

BGF21 BG30P-12.5084A

BGF27BG30P-70.5085

15 15

15

15

15 15

15

15

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "

Ø 16 / 0,63

18,5

/ 0,

73

84 /

3,31

50 / 1,97

S I 1 8 5

11 / 0,43

22/0

,87

84/3

,32

50,8 / 2,00

12 / 0,46

84 /

3,31

160

/ 6,3

0

29,9 / 1,18

50 / 1,97

1,7

/ 0, 8

52

87 /

3,43

24 /

0,94

15 / 0,58

50 / 1,97

17,4 / 0,69

26 /

1,02

85 /

3,35

50 / 1,97

17,4 / 0,6926

/ 1,

02

85 /

3,35

50 / 1,97

15 / 0,58

24 /

0,94

84 /

3,31

50 / 1,97

84 /

3,31

20,5

/ 0,

81

22 / 0,85

50 / 1,97

Page 10: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

10

BGK06 B47GK12LK77-K

BGK86 B47GK17.5LK77-KE

BGK38B47GK22-K

BGK100PBG30K-15.5080P

BGK90 BG30K-22.6077

BGK100BG30K-15.5080

15 10 10

15

10

15

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "8 2 M M / 3 , 2 " | S C H A F T | S H A N K

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "9 6 M M / 3 , 8 " | S C H A F T | S H A N K

48 / 1,89

77 /

3,03

19 /

0,75

12 / 0,46

52 / 2,05

64 /

2,52 34

/ 1,

34

22 / 0,87 17,4 / 0,69

28,5

/1,1

2

77/3

,03

60 / 2,36

22 / 0,87

34/1

,34

77/3

,03

30 / 1,18

60 / 2,36

(159

/6,2

6)

82/3

,23

15 / 0,58

24 /

0,94

80 /

3,15

176

/ 6,9

3

30 / 1,18

50 / 1,97

15 / 0,58

24 /

0,94

8 0 /

3,15

50 / 1,97

Page 11: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

11

BGK95 BG30K-15.5070

BGK97 BG30K-15.5084

BGK84 BG30K-15.5081

BGK97/P BG30K-15.5084P

15

15

15

15

BGK99 BG30K-11.5184F

BGK103 BG30K-13.5084

BGK96 BG30K-15.5081P

15

15

15

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "7 6 M M / 3 " | S C H A F T | S H A N K

15 / 0,58

24 /

0,94

81 /

3,19

50 / 1,97

15 / 0,58

24 /

0,94

70 /

2,76

50 / 1,97

15 / 0,58

24 /

0,94

81 /

3,19

50 / 1,97

15 / 0,58

24 /

0,94

84 /

3,31

50 / 1,97

15 / 0,58

24 /

0,94

84 /

3,31

50 / 1,97

11 / 0,4322

/ 0,

87

84 /

3,31

51 / 2,01

50 / 1,97

84 /

3,31

25 /

0,9 8

13 / 0,50

29,9 / 1,18

160

/ 6,3

0

Page 12: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

12

BGK88 BG30K-15.5087 15

BGK104 BG30K-61.5084

BGK105 BG30K-74.5084

BGK106 BG30K-62.508415

15

15

15 / 0,5824

/0,9

4

87/3

,43

50 / 1,97

Ø 16 / 0,63

18,5

/ 0,

73

84 /

3,31

50 / 1,97

84 /

3,3 1

20, 5

/ 0,

81

Ø 22 / 0,85

50 / 1,97

160

/ 6,3

0

29,9 / 1,18

Ø 17,2 / 0,68

16 /

0,63

84 /

3,31

50 / 1,97

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "7 6 M M / 3 " | S C H A F T | S H A N K

BHR183 B133-118-B 3

30,4

/ 1,20

100

/3,9

4

32 / 1,26

118

/4,6

4

133 / 5,24

77/3

,03

50°

Page 13: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

13

BGS105 BG30W-25.7070

BGS80 B47GK17.5LK75

BGS90 B47GK22LK70-E

BGS95 B47GK15LK80

BGS88 B47GK19/70-E

BGS93 B47GK22LK70/70

BGS17 BG30W-17.5064

BGS84 B47GK19/70-P

BGS16 BG30W-25.7070A

BGS89 BG30W-17.7075

BGS100 BG30W-19.7075

BGS103 BG30W-69.707710

10

10

15

10

10

10

10

10

10

10

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "

17,4 / 0,69

28,5

/ 1,

12

64 /

2,52

50 / 1,97

25 / 0,98

30 /

1,18

70 /

2,76

70 / 2,76

15 / 0,5824

/0,9

4

80/3

,15

54 / 2,13

17,4 / 0,69

24 /

0,94

75 /

2,9 5

30 / 1,18

70 / 2,76

151

/ 5,9

4

19 / 0,74

29 /

1,14

64 /

2,52

70 / 2,76

19 / 0,74

29 /

1,14

64 /

2,52

70 / 2,76

22 / 0,87

34 /

1,34

70 /

2,75

70 / 2,76

25 / 0,98

35 /

1,38

70 / 2,76

70 /

2,76

17,4 / 0,69

24/0

,94

75/2

,95

55 / 2,17

19 / 0,74

29/1

,14

75/2

,95

70 / 2,76

22 / 0,87

34/1

,34

70/ 2

,76

70 / 2,76

30 / 1,18

27,5

/1,0

8

77/3

,03

70 / 2,76

S R 8 3 / 1

Page 14: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

14

BSR58 BG30F-09.6064 10

BGF25 BG30F-15.7075

BGF10 B47GK17.5LK75-E/F

BGF36BG30F-19.7070

BGF11B47GK22LK70-E/F

10 10 10

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "S I 2 3 9

30 / 1,17

60 / 2,36

140

/5,5

1

64

/2,5

2

9,1/ 0,36

30 / 1,17

60 / 2,36

140

/5,5

1

64

/2,5

2

9,1/ 0,36

15/0,58

24/0

,94

75/2

,95

70/2,76

17,4/0,69

24/0

,94

75/2

,95

70/2,76

19 / 0,74

70 / 2

,76

70 / 2,76

29 / 1

,14

22 / 0,87

34/1

,34

70/2

,75

146

/5,7

4

29,8 /1,17

70 / 2,76

Page 15: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

15

BHR35 B30.65

BHR75 B30.65H

BHR94 B43G

BHR193 B30.8045

5

5

5

5

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 0 M M / 1 , 1 8 "

30,4 / 1,20

65 /

2,56

66 /

2,60

100 / 3,93

45°

72 / 2

,84 30,4 / 1,20

65 /

2,56

80 /

3,15

118 / 4,64

80,6

/ 3,17

45°

78/ 3

,06

42°

30,4 / 1,20

65/2

,56

66,5

/2,6

2

104 / 4,09

30,4 / 1,20

65 /

2,56

80,

/ 3,18

45°

118 / 4,6480

/ 3,

15

7

Page 16: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

16

BSR295 BG32FL-22.5570

BSR245 BG32P-70.4771

BSR303 BG32FL-19.5590

BSR332 BG32P-73.4771

BSR271 BG32H-19.6090

BSR269 BG32P-70.55.70C

BR89 BR50-32/K

BSR255 BG32P-70.5590A

10

15

10

15

10

10

10

10

B E T E K | M A D E I N G E R M A N Y

S I 2 0 9

S I 1 8 5

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 M M / 1 , 2 6 "

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 / 3 3 M M ( 1 , 2 6 / 1 , 3 )

22 / 0,87

32 /

1,26

71 /

2,79

47 / 1,85

Halterlänge 58 mmHolder length 58 mm

Halterlänge 61 mmHolder length 61 mm

Halterlänge 62 mmHolder length 62 mm

55 / 2,17

70 /

2,76

30 /

1,18

22 / 0,87

19 / 0,74

29 /

1,14

90 /

3 ,54

1 76

/ 6,9

3

32 / 1,26

55 / 2,17

19 / 0,74

29 /

1,14

90 /

3,54

1 70

/ 6,6

9

32 / 1,26

60 / 2,36

20 / 0,79

32,5 / 1,28

76 / 2,99

95 /

3,74

119

/ 4,6

9 50 / 1,97

72,5

/ 2,

85

49,9 / 1,96

17,4 / 0,69

26 /

1,02

142

/ 5,5

9

71 /

2,79

32 / 1,26

47 / 1,85

17,4 / 0,69

26 /

1,02

70 /

2 ,76

32 / 1,26

55 / 2,17

144

/ 5,6

7

17,4 / 0,6926

/ 1,

02

90 /

3,54

164

/ 6,4

6

31,7 / 1,25

55 / 2,17

S R 8 3 / 1

Page 17: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

17

S I 2 3 3

BHR205B32.67H 5

BSR290 BG32P-70.5590A

BSR234 BG32P-70.4890

BSR248 BG32P-70.5070

BSR281BG32P-19.5590A

BSR251 BG32P-70.5570A

BSR262BG32P-22.5570A

BSR279 BG32P-70.5590

BSR294BG32P-22.5590A

10

15

15

10

15

10

10

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 / 3 3 M M ( 1 , 2 6 / 1 , 3 )

Halterlänge 63 mmHolder length 63 mm

Halterlänge 64 mmHolder length 64 mm

Halterlänge 67 mmHolder length 67 mm

17,4 / 0,69

26 /

1,02

167

/ 6,5

7

90 /

3,5 4

32 / 1,26

55 / 2,17

50 / 1,97

70 /

2,76

26 /

1,02

17,4 / 0,69

55 / 2,17

70 /

2,76

26/ 1

,02

17,4 / 0,69 17,4 / 0,69

26 /

1,02

90 /

3,54

167

/ 6,5

7

32 / 1,26

55 / 2,17

48 / 1,89

90 /

3,54

26 /

1 ,02

17,4 / 0,69

55 / 2,17

70 /

2,76

30 /

1,18

22 / 0,87

55 / 2,17

90 /

3,54

29 /

1,1 4

19 / 0,74 22 / 0,87

30 /

1,18

9 0 /

3,54

170

/ 6,6

9

32 / 1,26

55 / 2,17

80 /

3 ,15

118 / 4,64

67 /

2,64

32,5 / 1,28

45°

806 /

317

,,

Page 18: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

18

BSR165 BG32P-70.4875

BSR242 BG33P-70.5573

BSR241 BG32P-70.5570

10 10

15

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 / 3 3 M M ( 1 , 2 6 / 1 , 3 )

Halterlänge 72 mmHolder length 72 mm

Halterlänge 74 mmHolder length 74 mm

17,4 / 0,69

75 /

2,95

160

/ 6,3

0

32 / 1,26

48 / 1,89

6 / 1

,02

2

70 /

2,7 6

26 /

1,02

17,4 / 0,69

55 / 2,17

17,4 / 0,69

26 /

1,02

73 /

2,87

158

/ 6,2

2

33 / 1,30

55 / 2,17

S I 2 3 3

Page 19: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

19

BSR252 BG32P-70.5570B

BSR246BG32P-22.5570

BSR263 BG33P-22.5570

BSR282 BG32P-22.5590

BSR270/2BG32P-19.5590A15 10

1515

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 / 3 3 M M ( 1 , 2 6 / 1 , 3 )

Halterlänge 75 mmHolder length 75 mm

55 / 2,17

70 /

2,76

26/ 1

,02

17,4 / 0,69

55 / 2,17

90 /

3,54

29 /

1 ,14

19 / 0,74

55 / 2,17

70 /

2,76

30 /

1,18

22 / 0,87

22 / 0,87

30 /

1,18

70 /

2,76

55 / 2,17

22 / 0,87

30 /

1,18

90 /

3 ,54

55 / 2,17

S I 2 3 3

BSR274 BG32P-22.5570P 10

22 / 0,87

30 /

1,18

70 /

2,76

158

/ 6,2

2

32 / 1,26

55 / 2,17

BSR333 BG31P-22.6580

BSR334 BG31P-22.6580SE

BSR330 BG32HP-19.6090

8 8

10

65 / 2,56

80 /

3,15

30 /

1,18

22 / 0,87

65 / 2,56

80 /

3,15

3 0 /

1,1 8

22 / 0,87

8 /

0,31

32 / 1,26

60 / 2,36

178

/ 7, 0

119 / 0,74

29 /

1,14

90 /

3,54

Page 20: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

20

BHR224 B32.75H

BHR243 B33.8040-B

BHR242 B33.8040

BHR213 B32.8445-B

5

3

2

3

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 2 / 3 3 M M ( 1 , 2 6 / 1 , 3 )

45°

118 / 4,64

32,5 / 1,28 ,

80,6

3,17

/

65 /

2,56

75 /

2,95

7 9

,9 /

3 ,15

45°

118 / 4,64

32,5 / 1,28 ,

80,6

3,17

/

65 /

2,56

75 /

2,95

7 9

,9 /

3 ,15

40°

74,5

/ 2,

93

118,

4 / 4

,66

132 / 5,19

80 /

3,15

32,5 / 1,28

99,7 / 3,93 40°

74,5

/ 2,

93

118,

4 / 4

,66

132 / 5,19

80 /

3,15

32,5 / 1,28

99,7 / 3,93

40°

32,5 / 1,28

74,5

/ 2,

93

170 / 6,69

80 /

3,15

21°

G3/8"

99,7/

933,

45° 15°

G1/4"

127

/ 5,0

0

32,5 / 1,28

112 / 4

,41

171,8 / 6,77

84 /

3,31

Page 21: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

21

BSR320 BG35X-15.55102

BSR346 BG35X-70.64102

BSR343 BG35X-19.64102P

BSR343OP BG35X-19.64102OP

BSR324 BG35X-22.64102

BSR347 BG35X-70.64102A

BSR283 BG35X-19.5589P8 6

6 6 6

8 8

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 5 M M / 1 , 3 8 "

15 / 0,58

24 / 0

,94

55 / 2,1734,6 / 1,36

102

/ 4,0

2

2 38

/ 9,3

7

17,4 / 0,69

26 / 1

,02

102

/ 4,0

2

64 / 2,5234,6 / 1,36

238

/ 9,3

7

17,4 / 0,69

26 / 1

,02

102

/ 4,0

2

64 / 2,52

34,6 / 1,36

225

/ 8,8

6

19 / 0,74

29 /

1,14

55 / 2,17

34,6 / 1,36

89 /

3,50

225

/ 8,8

6

19 / 0,74

29 /

1,14

102

/ 4,0

2

64 / 2,52

34,6 / 1,36

238

/ 9,3

7

19 / 0,74

29 /

1,14

102

/ 4,0

2

64 / 2,52

34,6 / 1,36

238

/ 9,3

7

22

34

102

64

34,6

238

S I 1 8 1

Page 22: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

22

BSR111 BG35H-19.5589A

BSR111P BG35H-19.5589AP

BSR285 BG35H-73.5589P

BSR228 BG35H-25.5588

BR71 BR49.8-35-119

10

10 10

10 10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 5 M M / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 8 9 M M / 3 , 5 "

19 / 0,74

29 /

1,14

89 /

3,50

55 / 2,17

19 / 0,74

29 /

1,14

89 /

3,50

183

/ 7,2

0

34,6 / 1,36

55 / 2,17 25 / 0,98

30 /

1,18

88 /

3,46

55 / 2,17

22 / 0,87

32 /

1,26

89 /

3,50

55 / 2,17

35,1 / 1,38

30 / 1,18

50 / 1,96

72 / 2,83

95/3

,74

119

/4,6

972

,5/ 2

,85

BSR370 BG35H-15.5589 10

15 / 0,5824

/ 0,9

4

89 /

3,50

55 / 2,17

BSR288 BG35H-25.5588P 10

25 / 0,98

30 /

1,18

88 /

3,4 6

55 / 2,17

Page 23: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

23

BSR175 BG35H -19.55100

BSR221 BG35H -15.55102A

BSR224 BG35H -15.55102P

BSR146/2 BG35H -19.55100PA

BSR319 BG35H-70.55102A

BSR249 BG35H -73.55100

10

10 10

10

10

10

BSR112 BG35K-19.5589

BSR259 BG35K- 25.558810 10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 5 M M / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 8 9 M M / 3 , 5 "

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 5 M M / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 1 0 0 - 1 0 2 M M / 4 "

19 / 0,74

29/1

,14

89/3

,50

183

/7, 2

0

34,6 / 1,37

55 / 2,17

25 / 0,98

30 /

1,18

88 /

3,46

34,6 / 1,36

55 / 2,17

182

/ 7,1

7

19 / 0,74

29 /

1,14

100

/ 3,9

4

55 / 2,17

15 / 0,58

24 /

0,94

1 02

/ 4,0

0

55 / 2,17

15 / 0,58

24 /

0,94

102

/ 4,0

0

55 / 2,17

22 / 0,87

32 /

1,26

1 00

/ 3,

94

55 / 2,17

19 / 0,74

29/1

,14

100

/3,9

4

194

/7,6

4

34,6 / 1,37

55 / 2,17

17,4 / 0,69

26 /

1,02

102

/ 4,0

2

55 / 2,17

Page 24: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

24

BSR357 BG35K-19.55100

BSR362 BG35K-72.55100

BSR363 BG35K-73.55100

BSR207 BG35K-74.55102

8

8 8 8

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 5 M M / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 1 0 0 - 1 0 2 M M / 4 "

19 / 0,74

29 /

1,14

100

/ 3,9

4

55 / 2,17

34,6 / 1,36

194

/ 7,6

4

19 / 0,74

27,6

/ 1,0

9

100

/ 3,9

4

55 / 2,17

22 / 0,87

32 /

1,26

100

/ 3,9

4

55 / 2,17

Ø 22 / 0,87

20,5

/ 0,

81

102

/ 4,0

0

55 / 2,17

Page 25: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

25

BKS16 B46K12.5LK90

BKS156 BS38W-22.5064

BKS153 BS38W-12.5077

BKS156 / P BS38W-22.5064P

BKS191 BS38W-17.4878

BKS154 BS38W-19.5064

BKS204 BS38W-25.5268

BKS155/P BS38W-17.5064P

BKS166 BS38W -17.6070

BKS155 BS38W-17.5064

10

15

15

15

10 15

15

15

10

15

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 3 0 M M - 1 , 5 / 1 , 1 8 "S R 8 3 / 1

25 / 0,98

35 /

1,38

68 /

2,68

52 / 2,05

17,4 / 0,69

24 / 0

,94

7 8 /

3,07

48 / 1,89

17,4 / 0,69

24 /

0,94

64 /

2,52

50 / 1,97 48 / 1,89

88 /

3,46

12 / 0,4619

/ 0,

75 12 / 0,46

19 /

0,75

77 /

3,03

50 / 1,97

17,4 / 0,69

24/0

,94

140

/5,5

1

64/2

,52

30 / 1,18

38 / 1,5

50 / 1,97

19 / 0,74

29/1

,14

64/2

,52

50 / 1,97

22 / 0,87

34/1

,34

64/2

,52

50 / 1,97

22 / 0,87

34/1

,34

64/2

,52

50 / 1,97

17,4 / 0,69

28,5

/1,1

2

70/2

,76

60 / 2,36

Page 26: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

26

BKS172 BS38W -19.6077

BKFL01 BS38FL-22.6590

BKS171 BS38W -17.6077

BKS189 BS38W -19.6070

BKFL03 BS38FL-19.6064

BKS190 BS38W -19.6070P

BKFL04 BS38FL-22.6064

10

10

10 10

10

10

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 3 0 M M - 1 , 5 / 1 , 1 8 "

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 3 0 M M - 1 , 5 / 1 , 1 8 "

19 / 0,74

25/0

,98

77/3

,03

60 / 2,36

30 / 1,17

38 / 1,49

153

/6,0

2

19 / 0,74

29 /

1,14

60 / 2,36

70 /

2,76

19 / 0,74

29 /

1,14

60 / 2,36

70 /

2,76

17,4 / 0,69

28,5

/1,1

2

77/3

,03

60 / 2,36

22 / 0,87

30 /

1,18

90 /

3,54

65 / 2,56

29,7 / 1,17

37,7 / 1,48

166

/ 6,5

4

19 / 0,74

25 /

0,98

64 /

2,52

60 / 2,36

22 / 0,87

34 /

1,34

64 /

2 ,52

60 / 2,36

S R 8 3 / 1

S I 2 0 9

BKFL02 BS38FL-22.6564 10

22 / 0,87

30 /

1,18

64 /

2 ,52

65 / 2,56

Page 27: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

27

BHR38 B43H BHR204 B3830.784510

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 3 0 M M - 1 , 5 / 1 , 1 8 "

4

6 3,5

/ 2,

50

6 6 /

2,60

45°

100 / 3,93

38 /

1,50

30,3 / 1,19

38,3 / 1,51

72 2

83 /

,

78 /

3,07

129 / 5,06

38,3 / 1,51

30,3 / 1,19

45°

83 / 3

,27

38 /

1,50

63,5

/ 2,

50

Page 28: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

28

BSR297 BG38K-22.6092

BSR296 BG38K-19.6092

8

8

BKF17 B47K22/70-F

BKF16 B47K24/70-FBKF10 BS38F-25.7077BKF15 B47K19/70-F

8

8810

19/ 0,74

29/1

,14

75/2

,95

70/ 2,76

77 / 3

,03

70 / 2,76

25 / 0,98

35 / 1

,38

S I 2 3 9

24,3/0,96

77/3

,03

70 / 2,76

18,7

/0,74

22/ 0,87

34/

1,3

4

7 5/2

,95

151/

5,9

4

30/1,17

38/1,49

70/ 2,76

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 3 0 M M - 1 , 5 / 1 , 1 8 "

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M - 1 , 5 "

92 /

3,6 2

60 / 2,36

29 /

1,14

19 / 0,74

38 / 1,49

185,

5 / 7

,30

22 / 0,87

34 /

1,34

92 /

3,6 2

60 / 2,36

Page 29: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

29

BR76 BR 57-38 BR87 BR 57-38/K5 5

BSR291 BG38H -19.55100A

BSR292 BG38H -17.55100A

BSR292P BG38H -17.55100PA

BSR291P BG38H -19.55100PA

8

10 10 10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M - 1 , 5 "

19 / 0,74

29 /

1,14

1 00

/ 3,9

4

193

/ 7,6

0

38 / 1,50

55 / 2,17

19 / 0,74

29 /

1,14

100

/ 3,9

4

55 / 2,17

17,4 / 0,69

28,5

/ 1,

1 2

100

/ 3,9

4

55 / 2,17

17,4 / 0,69

28,5

/ 1,

12

100

/ 3,9

4

55 / 2,17

38,4 / 1,51

50,7 / 2,00

57 / 2,24

92 / 3,62

95 /

3,74

139

/ 5,4

7

74,

,6

/ 294

38,4 / 1,51

57,2 / 2,25

74,6

/ 2,

94

139

/ 5, 4

7

9 5 /

3,7 4

92 / 3,62

50,7 / 2,00

57,3 / 2,26

Page 30: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

30

BHR222 B38.8940-B BHR219 B38.89402 2

BSR189 BG38K-22.6070

BSR286 BG38K-17.5577A

BSR188 BG38K-19.6070

BSR190 BG38K-25.6070

BSR202 BG38K-19.6070P

BSR190P2 BG38K-25.6070P2

10

10 10

10

10

10

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M - 1 , 5 "

25 / 0,98

35 /

1,38

70 /

2,76

60 / 2,36

17,4 / 0,69

24 /

0,94

77 /

3,03

55 / 2,17

25 / 0,98

30 /

1,18

70 /

2,76

60 / 2,36

19 / 0,74

29/1

,14

70/2

,76

60 / 2,36

19 / 0,74

29/1

,14

70/2

,76

60 / 2,36

22 / 0,87

30/1

,18

70/2

,76

147

/5,7

9

38 / 1,50

60 / 2,36

108,3 / 4,26

40°

87,5

/ 3,

4 489

/ 3,

5 0

186 / 7,32

38,3 / 1,51 38,3 / 1,51

87,5

/ 3,

44

148 / 5,82

89 /

3,50

108,3 / 4,26

40°

Page 31: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

31

BSR199 BG38W-22.7080AP

BSR338 BG38W-75.6580PA

BSR198 BG38W-22.8080A

BSR237 BG38W-22.6883A

BSR311 BG38W-19.8080

BSR200 BG38W-25.7080P

BSR312 BG38W-25.6580B

BSR240 BG38W-22.6883PA

BSR140 BG38W-22.7080

BSR201 BG38W-25.8080A

BSR287 BG38W-25.7080

BSR197 BG38W-30.8080A

8

8

8

8

7

8

8

8

8

6

8 5

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M / 1 , 5 "H A LT E R L Ä N G E | H O L D E R L E N G T H | 6 5 M M / 2 , 6 "

30 / 1,18

34,6

/ 1,

36

65 / 2,56

80 /

3,15

19 / 0,74

29 /

1,14

8 0 /

3,15

80 / 3,15

22 / 0,87

30/1

,18

80/ 3

,15

70 / 2,76

22 / 0,87

34/1

,34

80/3

,15

157

/6,1

8

38 / 1,5

70 / 2,76

22 / 0,87

34/1

,34

80/3

,15

80 / 3,15

25 / 0,98

35/1

,38

80/3

,15

70 / 2,76

25 / 0,98

35/1

,38

80/3

,15

80 / 3,15

30 / 1,18

40/1

,57

80/3

,15

80 / 3,15

25 / 0,98

35 /

1,38

80 /

3,15

65 / 2,56

22 / 0,87

34 /

1,34

82,5

/ 3,

25

68 / 2,68

22 / 0,87

34 /

1,34

82,5

/ 3,

25

68 / 2,68

25 / 0,98

35 /

1,38

80 /

3,15

70 / 2,76

S R 6 5 / 2 . 5

Page 32: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

32

BSR114 BG38W-22.6580

BSR131 BG38W-22.6580P

BSR215 BG38W-25.6580P

BSR193 BG38W-25.6580A

8 8 8

8

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M / 1 , 5 "H A LT E R L Ä N G E | H O L D E R L E N G T H | 6 5 M M / 2 , 6 "

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 M M / 1 , 5 "H A LT E R L Ä N G E | H O L D E R L E N G T H | 7 5 M M / 3 , 0 "

BHR169 B38H 3

128,5 / 5,06

94,5

/ 3,

72

65,5

/ 2,

58 38,3 / 1,51

45°

86,1 / 3,39

22 / 0,87

30/1

,18

80/ 3

,14

65 / 2,56 65 / 2,56

80 /

3,15

3 0 /

1,18

22 / 0,87 25 / 0,98

35 /

1,38

80 /

3,15

38 / 1,49

65 / 2,56

165

/ 6,5

0

25 / 0,98

35 /

1,38

80 /

3,15

65 / 2,56

S R 6 5 / 2 . 5

S R 6 5 / 2 . 5

Page 33: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

33

BLK10 B46K2L

BLK14 BS38K-70.5275

BLK12 BS38K-22.556610 10 10

BKF14 B47K13LK97L

BKF23 BS38F-67.5497

BKF57 BS38F-19.7277

BKF58 BS38F-22.726610 10 8 8

B E T E K | M A D E I N G E R M A N Y

S P E Z I A L S C H A F T S Y S T E M E | S P E C I A L S H A N K S Y S T E M S

13 / 0,5025

/0,9

8

97/ 3

,82

211

/ 8,3

1

30 / 1,18 38 / 1,5

54 / 2,13

22 / 0,85

20/0

,78

97/3

,82

211

/8,3

1

30 / 1,18

38 / 1,5

54 / 2,13

16 / 0,61

13,7

/ 0,

54

7 5 /

2,95

174,

5 / 6

,87

30 / 1,18

38 / 1,49

52 / 2,05

22 / 0,87

30 /

1,18

66 /

2,60

165,

5 / 6

,52

30 / 1,18

38 / 1,49

55 / 2,17

17,4 / 0,69

26 /

1,02

75 /

2,95

30 / 1,18

38 / 1,49

52 / 2,05

174,

5 / 6

,87

19 / 0,74

29 /

1,14

7 7 /

3,03

72 / 2,83

29,5/ 1,16

37,5 / 1,48

188

/ 7,4

0

22 / 0,87

30 /

1,18

72 / 2,83

29,5 / 1,16

37,5 / 1,48

66 /

2,60

1 77

/ 6,9

7

S I 2 3 9

Page 34: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

34

BKR31/2 BG38X-22.65110PB

BKR30BG40X - 22.70130PA

BKR27 BG38X-17.6090

BKR32 BG38X-25.65110P

BKR33 BG38X-17.65110

6 4

8

6

7

B E T E K | M A D E I N G E R M A N Y

S P E Z I A L S C H A F T S Y S T E M E | S P E C I A L S H A N K S Y S T E M S

BHR191 B3830.8940 3

148 / 5,82

89 /

3,50

38,3 / 1,51

30,3 / 1,19

95 /

3,74

40°

108,3 / 4,26

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 3 8 / 4 0 M M - 1 , 5 " / 1 , 5 8 "

17,4 / 0,69

28,5

/ 1,

12

110

/ 4,3

3

65 / 2,56

25 / 0,98

35 /

1,38

110

/ 4,3

3

65 / 2,56

17,4 / 0,69

28/1

,10

90/3

,54

60 / 2,36

22 / 0,87

34/1

,34

110

/4,3

3

217

/8,5

4

38 / 1,5

65 / 2,56

22 / 0,87

34 /

1,34

130

/ 5,1

2

252,

7 / 9

,95

40 / 1,57

70 / 2,76

Page 35: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

35

BSR258/P BS43H -25.65102P

BSR230 BS43H -70.67102P

BSR181 BS43H - 69.67102A

BSR369 BS43H-30.6789P

BSR204 BS43H -19.67102A

BSR236 BS43H -22.64102

6

5

6

5

6 5

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 4 3 / 3 5 M M - 1 , 7 0 / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 1 0 2 M M / 4 , 0 " | 8 9 M M / 3 , 5 "

40

89

67 / 2,64

30 / 1,18

25 / 0,98

35 /

1,38

102

/ 4,0

2

65 / 2,56

17,4 / 0,6926

/ 1,

02

102

/ 4,0

2

67 / 2,64

22 / 0,87

34 /

1,34

1 02

/ 4,0

2

64 / 2,52

19 / 0,74

29/1

,14

102

/4,0

2

67 / 2,64

67 / 2,64

102

/ 4,0

2

27,5

/ 1,

08

30 / 1,18

BSR258 BS43H -25.65102

BSR265 BS43H -25.6789P

6

6

65 / 2,56

102

/ 4,0

2

35 /

1,38

25 / 0,98

34,7 / 1,36

43,2 / 1,70

234

/ 9,2

1

25 / 0,98

35 /

1,38

89 /

3 ,50

67 / 2,64

34,7 / 1,36

43,2 / 1,70

221

/ 8,7

0

Page 36: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

36

B E T E K | M A D E I N G E R M A N Y

S I 1 8 1

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 4 3 / 3 5 M M - 1 , 7 0 / 1 , 3 8 "K O P F L Ä N G E | G A U G E | 1 1 4 M M / 4 , 5 "

BSR211 BS43H - 70.67114AP

BSR205 BS43H - 68.67114

BSR203 BS43H - 69.67114

BSR178 BS43H - 22.67114P

BSR231BS43HF-22.67114

BSR322BS43H-74.67114

BSR182 BS43H -19.67114

5

5 5

5

5

5

5

17,4 / 0,69

26 /

1,02

114

/ 4,4

9

67 / 2,64

19 / 0,74

29 / 1

,14

114

/ 4,4

9

67 / 2,64

22 / 0,87

30/1

,18

114

/4,4

9

67 / 2,64

BSR184S BS43H - 19.67114S 5

67 / 2,64

114

/ 4,4

9

29 /

1 ,14

19 / 0,74

24,3 / 0,96

18,7

/0,7

4

1 14

/4,4

9

67 / 2,64

27,5

/1,0

8

4,8 / 1,37

43,3 / 1,70

67 / 2,64

30 / 1,18

114

/4,4

9

246

/9,6

9

3

22 / 0,87

34 /

1,34

114

/ 4,4

9

67 / 2,64

34,7 / 1,36

43,2 / 1,70

246

/ 9,6

9

Ø 22 / 0,87

20,5

/ 0,

81

114

/ 4,4

9

67 / 2,64

Page 37: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

37

B E T E K | M A D E I N G E R M A N Y

S C H A F T S Y S T E M | S H A N K S Y S T E M | Ø 4 3 / 3 5 M M - 1 , 7 0 / 1 , 3 8 "

BR74 BR57-44

BR94 BR57-44A

5

5

43,7 / 1,72

35 / 1,38

57 / 2,24

92 / 3,62

74,6

/2,9

4

139

/5,4

7

67/2

, 64

BHR261 B300-B 2

57,2 / 2,25129,1 / 5,08

102

/ 4,0

2

42°

112,

2 / 4

,42

182,5 / 7,18

43,8 / 1,72

35,1 / 1,3857,2 / 2,25Ø

92 / 3,62Ø

139,

5 / 5

,49

BHR159 B300 1

BR79 BR57-44-144 4

43,6 / 1,72

35,2 / 1,39

79,7

/3,1

41 4

7,8

/5,8

2

108 / 4,25

57 / 2,24

73,2

/2,8

8

57,1 / 2,25

50,8 / 2,00

77,5

/3,0

510

0/3

,94

1 12,

2/4

,42

182,5 / 7,19

42°

128 / 5,03

70°

G1/4"

61 / 2,40

Page 38: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

38

BF56 BF 145x38x22/2

BF57 BF145x38x22/3P

BHF19 BHF38x23

15

15

1

B E T E K | M A D E I N G E R M A N Y

R A D I A L M E I S S E L | R A D I A L P I C K

22,3 / 0,88

18 / 0,71

37,4 / 1,47

75 / 2,95

144,

8 / 5

,70 79

,8 /

3 ,14

13 / 0,5121,8

/ 0,

86

17

4 / ,69

26 / 1,02

22,3 / 0,88

37,4 / 1,47

79,8

/ 3,

14

144 ,

8 / 5

,70

75 / 2,95

,0

93 / 3,66

70 /

2,76

23 /

0,91

70 /

2,76

38 / 1,50

S I 1 8 8

Page 39: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

39

BF58/3 BF145x38x22/4

BF66 BF145x38x22/HD

BHF20 BHF38x23/L

5

15

6

B E T E K | M A D E I N G E R M A N Y

R A D I A L M E I S S E L | R A D I A L P I C KS I 2 1 1

23 /

0,91

70 /

2,76

38 / 1,50

70 /

2,76

93 / 3,66

21,8

/ 0,

86

13 / 0,51

80 /

3,14

1 45

/ 5,7

0

37,4 / 1,4775 / 2,95

21,8 / 0,86

18 / 0,71

12 / 0,46

26,7 / 1,05

80 /

3,15

37,4 / 1,4775 / 2,95

21,8 / 0,86

19 / 0,75

145

/ 5,7

1

BHF21 BHF38x23/R 6

23 /

0,91

70 /

2,76

70 /

2,76

93 / 3,66

38 / 1,50

Page 40: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

40

BF65 BF200x145x30.5

BF38 BF230x137x30.6

BF45 BF200x137x30.6

5

5

5

B E T E K | M A D E I N G E R M A N Y

R A D I A L M E I S S E L | R A D I A L P I C K

19 /

,74 27, 1,09

99 /

3,90

200

/ 7, 8

7

50 / 1,97

141,3 / 5,56

30,5 / 1,20

0 6 /

25 / 0,98

30,5 / 1,2050 / 1,97

136,4 / 5,37

15 / 0,59

22 /

0,87

129

/ 5,0

8

230

/ 9, 0

6

25 / 0,98

30,5 / 1,2050 / 1,97

144 / 5,68

15 / 0,59

22/0

,87

99 /

3,9 0

200

/ 7,8

7

Page 41: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

41

Page 42: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

42

B E T E K | M A D E I N G E R M A N Y

Z U B E H Ö R | A C C E S S O R I E S

BZ44 Meißelaustreiber für Minimeißel Bit extractor for Mini bit

BZ33 Montagewerkzeug für SI36 Assembly tool for SI36

BZ22 Meißelauszieher für BTK-Serie Bit puller for BTK-Series

BZ42 Meißelaustreiber für Minimeißel Bit extractor for Mini bit

BZ31 Demontagewerkzeug für SI36 Disassembly tool for SI36

BZ37 Montagewerkzeug für SI79/K Assembly tool for SI79/K

BZ43 Meißelaustreiber für BSH und BS-Serie Bit extractor for BSH and BC-Series

BZ41 Montagewerkzeug für SI26 Assembly tool for SI26

BZ36 Demontagewerkzeug für SI79/K Disassembly tool for SI79/K

BZ38 Keilaustreiber für Schaftdurchmesser Wedge puller for shaft diameter 20-25

BZ32 Demontagewerkzeug für SI26 Disassembly tool for SI26

BZ05 Meißelauszieher für Kopfdurchmesser 60 Bit puller for Head diameter 60

Page 43: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

43

B E T E K | M A D E I N G E R M A N Y

Z U B E H Ö R | A C C E S S O R I E S

BZ40 Keilaustreiber für Stufenschaft 43/35 Wedge puller for stepshank 43/35

BZ39 Keilaustreiber für Stufenschaft 38/30 Wedge puller for stepshank 38/30

BZ35 Montagewerkzeug für SI239 Assembly tool for SI239

BZ12 Meißelauszieher für BKH-Serie Bit puller for BKH-Series

BZ34 Demontagewerkzeug für SI239 Disassembly tool for SI239

BZ18 Meißelauszieher mit Kupferscheibe für BKH-Serie Bit puller with copper disk for BKH-Series

BZ39 Keilaustreiber für Schaft durchmesser 30-38 Wedge puller for shaft diameter 30-38

BZ16 Meißelaustreiber für Spannstift mit Durch messer 10 Bit extractor for Roll pin with diameter 10

SRZ02 Zange für SR83/1, SR61 und SR54 Plier for SR83/1, SR61 and SR54

BZ30 Meißelaustreiber für Spannstift mit Durch messer 16 und 30 Bit extractor for Roll pin with diameter 16 and 30

Page 44: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

44

B E T E K | M A D E I N G E R M A N Y

T U N G S T U D S M I T H A R T M E TA L L K E R N | T U N G S T U D S W I T H T U N G S T E N C A R B I D E C O R E

H O C H L E I S T U N G I M A N G E B O T

Zu den TungStuds liefern wir Ihnen auf Wunsch die entsprechenden Bolzenschweißanlagen.Bitte fragen Sie an, falls Sie andere Abmessungen wünschen. Gerne nennen wir Ihnen auch die typischen Einsatzgebiete für die hier abgebildeten TungStuds.

H I G H P E R F O R M A N C E I N C L U D E D

On request, we can also provide you with the appropriate stud-welding machine for your TungStuds. Please ask us if you need any different sizes. We will also gladly explain to you the typical areas of use for the TungStuds shown here.

Höhe nach dem Anschweißen Height subsequent after welding on

7 / 0,28

12 / 0,47

16 / 0,63

1 1,4

/ 0,

45

1 9 /

0 ,75

14 /

0,55

9 / 0,36

15 / 0,59

19 / 0,75

8 ,4

/ 0,3

3

16 /

0,63

11/ 0

,43

9 / 0,36

15 / 0,59

19 / 0,75

12 /

0 ,4 7

19 /

0,75

14 /

0,5 5

12,6 / 0,50

18 / 0,71

8,4 /

0 ,33

11 /

0,43

22 / 0,87

1 6 /

0 ,63

12,6 / 0,50

18 / 0,71

22 / 0,87

12 /

0,47

19 /

0,75

14 /

0,55

12,6 / 0,50

18 / 0,71

22 / 0,87

14 /

0,55

22 /

0,8 7

17 /

0,67

19 / 0,74

10 /

0,39

18,5

/ 0 ,

7322 / 0,87

13,5

/ 0,

53

15 / 0,59

18 /

0,71

11 /

0 ,43

12 / 0,47

16 / 0,63

13 /

0,51

12,8 / 0,50

6 / 0

,24

12,5

/ 0,

49

16 / 0,63

7 ,5

/ 0,3

0 * 15,6 / 0,61

19 / 0,75

13,3

/ 0,5

2

20,9

/ 0,8

2

14 / 0

,55

7 / 0,28

12 / 0,47

16 /

0,63

16 / 0,63

8 ,4 /

0,3

3

11 /

0,43

BTS01 BTSD16/16

BTS05 BTSD22/16

BTS10B BTSD16/18B

BTS02 BTSD16/19

BTS06 BTSD22/19

BTS20 BTSD16/12,5SG

BTS03 BTSD19/16

BTS07 BTSD22/22

BTS100 BTSD19/15,6SG

BTS04 BTSD19/19

BTS08 BTSD22/18,5SG

150 150 150 150

150150150

100100100100

Page 45: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

45

B E T E K | M A D E I N G E R M A N Y

T U N G S T U D S B T S - P L AT E S

10 /

0,39

19 / 0,74

19,5

/ 0,

77

5 / 0

,20

45°

50 / 1,97

50 /

1,97

Breite | Width in mm Länge | Length in mm

50 50

75 75

100 100

125 125

150 150

Weitere Abmessungen auf Anfrage | Other sizes on request

A B M E S S U N G E N | D I M E N S I O N S

Page 46: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

46

1

2

3

B E T E K | M A D E I N G E R M A N Y

D E R S C H W E I S S P R O Z E S S | T H E W E L D I N G P R O C E S S

1

4

2

5

3

Der TungStud (1) wird auf die zu schützende Metallfläche (2) auf-gesetzt. Zum Schutz des Schweiß-bades ist er von einem Keramik-ring (3) umschlossen.

Unter Stromfluss hebt sich der TungStud ab und es entsteht ein Lichtbogen.

Durch den Lichtbogen werden TungStud und Metallfläche ange-schmolzen.

Der TungStud taucht in die Schmelze ein.

Es entsteht eine vollflächige Ver-bindung.

Beim Aufschweißen der Tung-Studs ist grundsätzlich eine geeignete Schutzausrüstung zu tragen!

W E I T E R K O M M E N ! – M I T I N T E L L I G E N T E N L Ö S U N G E N P R O G R E S S ! – W I T H I N T E L L I G E N T S O L U T I O N S

The TungStud (1) is placed onto the metal surface (2) that is to be protected. To protect the weld pool a ceramic ferrule (3) is placed around it.

When an electric current is ap-plied, the TungStud raises up and an arc is initiated.

The arc causes TungStud and metal surface to become partly fused.

The TungStud sinks into the fused mass.

The two become completely joined

Whenever you are welding on TungStuds, suitable protective equipment must always be worn!

· Schnelles Aufschweißen der TungStuds · TungStuds are quickly welded on

· Auch auf unregelmäßigen Oberflächen einsetzbar · Can also be used on uneven surfaces

· Nach Verschleiß die TungStuds einfach erneuern · When TungStuds are worn, simply replace them

· Es können auch einzelne TungStuds ausgewechselt werden · Individual TungStuds can also be replaced

· Verschleißarm durch Hartmetallkern · Resistant to wear thanks to tungsten carbide core

· Höhere Produktivität durch weniger Wartungsaufwand · Less maintenance work means higher productivity

· Kostenreduzierung durch weniger Stillstandzeiten · Cost reduction through less downtime

· Minimaler Ersatzteilaufwand · Minimal spare parts expenditure

Page 47: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

47

B E T E K | M A D E I N G E R M A N Y

T U N G S T U D S P E R F O R M A N C E

C U T T I N G W E A R P R O T E C T I O N

R O C K B O X E F F E C T

E X T E N S I V E W E A R P R O T E C T I O N

E X T E N S I V E W E A R P R O T E C T I O N

· The TungStuds are welded on in a grid pattern

· The space between the TungStuds does not have to embedded with mineral debris (cutting wear protection)

· The TungStuds are welded on in a grid pattern

· The space between the TungStuds become embedded with mineral debris (Rock-Box-Effect)

Page 48: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

48

A N W E N D U N G | A P P L I C AT I O N

Page 49: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

49

Page 50: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

50

Page 51: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

51

Page 52: BERGBAU | MINING · 2020. 1. 6. · Road Milling Surface Mining Surface Mining Stabilisieren Stabilising Grabenfräsen Trenching Spezialtiefbau Foundation Drilling Bergbau Mining

D

BETEK GmbH & Co. KG

Sulgener Str. 21-23D-78733 Aichhalden

Service-Nummer +49 (0) 7422. 565-592Service-Fax +49 (0) 7422. 565-122

[email protected]

9028796 / Index 2 © BETEK GmbH & Co. KG · 5 000 · Technische Änderungen vorbehalten · Atelier Türke