Business Challenge  To succeed in the global market, Deutsche Edelstahlwerke sought a technology solution that would enable the company to improve efciency and deliver goods to customers quickly and on time. Business Solutions JDA® Order Promiser JDA® Factory Planner JDA® Material Allocator JDA® Supply Chain Planner Business Benefts Reduced order process ing time rom ve days to less than one d ay online Reduced work-in-progress inventories and raw materials by 20 percent • Improved on-time deliveries rom 60 percent to 85 percent Reduced lead time rom ve weeks to our weeks Deutsche Edelstahlwerke Fast Facts Industry Manuacturing - Automotive & Industrials Headquarters Witten, Germany Description Deutsche Edelstahlwerke’ s extensive product oering ranges rom small-diameter drawn wire to orgings o up to 1,100 mm in diameter and includes engineering steels, tool steels and stainless steels. In addition, the company produces Ferro-Titanit®, a powder metallurgical titanium carbide material that can be urther heat treated. The materials produced by Deutsche Edelstahlwerke are used in the automotive, aerospace, power generation, oil and gas, and tooling industries. “We selected JDA because it has the most experience in factory planning for the steel industry and compared to other vendors, its solution was clearly the best.” - Hans Dieter Nase, director of production planning and order management, Deutsche Edelstahlwerke  Improving On-Time Delivery at Deutsche Edelstahlwerke Strengthening Customer Service Case Study

Deutsche-Edelstahlwerke on-Time Delivery Casestudy (2)

Embed Size (px)

Citation preview

 

Business Challenge

 To succeed in the global market, Deutsche Edelstahlwerke sought a

technology solution that would enable the company to improve efciency

and deliver goods to customers quickly and on time.

Business Solutions

• JDA® Order Promiser

• JDA® Factory Planner

• JDA® Material Allocator

• JDA® Supply Chain Planner

Business Benefts

• Reduced order processing time rom ve days to less than one day online

• Reduced work-in-progress inventories and raw materials by 20 percent

• Improved on-time deliveries rom 60 percent to 85 percent

• Reduced lead time rom ve weeks to our weeks

Deutsche Edelstahlwerke

Fast Facts

Industry

Manuacturing - Automotive & Industrials

Headquarters

Witten, Germany

Description

Deutsche Edelstahlwerke’s extensive product

oering ranges rom small-diameter drawn

wire to orgings o up to 1,100 mm in diameter

and includes engineering steels, tool steels

and stainless steels. In addition, the company

produces Ferro-Titanit®, a powder metallurgical

titanium carbide material that can be urther heat

treated. The materials produced by Deutsche

Edelstahlwerke are used in the automotive,

aerospace, power generation, oil and gas, and

tooling industries.

“We selected JDA because it has the

most experience in factory planning

for the steel industry and compared to

other vendors, its solution was clearly 

the best.” 

- Hans Dieter Nase,

director of production planning

and order management,

Deutsche Edelstahlwerke

 

Improving On-Time Delivery at Deutsche Edelstahlwerke

Strengthening Customer Service

Case Study

 

Like many steel manuacturers, Deutsche

Edelstahlwerke GmbH (DEW) has very

complex production processes. It produces

40,000 dierent varieties o steel products,

each o which involves up to 10 production

stages, including melting, rolling, orging,

sawing, adjusting and testing.

 The company’s inability to eectively plan

this production across its three plants

stood in the way o improved customer

service. “We had our stand-alone

production planning systems with very

limited connections between them,” says

Hans Dieter Nase, DEW’s director o 

production planning and order

management. “This clearly hampered

our ability to optimize throughput at our

plants and prevented us rom making

accurate orecasts on delivery times or

customers.”

DEW’s goals were clear. To succeed in the

global market, the company needed to

improve efciency and deliver goods to

customers quickly and on time.

Why JDA?

DEW had already implemented an

enterprise resource planning system, but

the production planning unctionality that

the system oered did not meet the

demand o a complex steel production. The

company thereore decided to look to other

vendors or an appropriate solution.

It considered various product oerings

beore selecting JDA’s solutions or supply

chain management. “We selected JDA

because it has the most experience in

actory planning or the steel industry and

compared to other vendors, its solution was

clearly the best,” Nase said.

JDA provides all o the solutions, content

and platorm required or companies to

improve their operational efciency and

participate in online marketplaces. DEW

initially opted or the actory planning

module and is now adding to this with

modules or master planning, delivery

orecasting (DEW’s order promising) and

materials allocation.

DEW has implemented a variety o JDA

solutions, including JDA® Order Promiser,

JDA® Factory Planner, JDA® Material

Allocator and JDA® Supply Chain Planner.

JDA’s Contribution

 The implementation o JDA solutions has

created a dynamic production planning

environment or DEW. “The JDA solution

is a very efcient tool or adapting the

planning parameters and is exible or

adding additional products and resources

to production,” Nase said. “Modeling is

very easy and eective.”

JDA solutions have also added

tremendous exibility in the planning

process – something that did not exist at

DEW prior to the implementation. “Our

previous systems were very inexible and

only allowed or planning once a week,”

Nase said. “With the JDA solution we can

plan every day, in real time, and adapt our

production to reect new situations and

new orders as they occur.”

DEW’s Results

 The improvements at DEW ollowing the

implementation o JDA solutions are

clearly evident. DEW has been successul

in improving its ability to deliver on time

rom 60 percent to 85 percent. It has

shortened its lead time by 25 percent

and reduced work-in-progress stock by

25 percent.

All o this not only improves customer

service, but also delivers tangible benets

to the bottom line. JDA solutions have

made light work o the complex

production environment at DEW. Despite

introducing an even more complicated

product mix, DEW has still managed to

increase its production with the use o the

JDA solution.

“We have had a very good experience

working with JDA,” Nase said. “We have

become more competitive and improved

our customer service by streamlining our

entire planning processes rom order

request through production to delivery.”

About JDA Software Group, Inc.

JDA® Sotware Group, Inc. (NASDAQ:

JDAS), The Supply Chain Company®, is a

leading global provider o innovative

supply chain management, merchandising

and pricing excellence solutions. JDA

empowers more than 6,000 companies o 

all sizes to make optimal decisions that

improve protability and achieve real

results in the discrete and process

manuacturing, wholesale distribution,

transportation, retail and services

industries. With an integrated solutions

oering that spans the entire supply chain

rom materials to the consumer, JDA

leverages the powerul heritage and

knowledge capital o acquired market

leaders including i2 Technologies®,

Manugistics®, E3®, Intactix® and Arthur®.

JDA’s multiple service options provide

customers with exible congurations,

rapid time-to-value, lower total cost o 

ownership and 24/7 unctional and

technical support and expertise.

UK & Northern Europe+44 (0) 1344 354500

France & Southern Europe

+33 (0)1 56 79 27 00

US+1 800 479 7382

Canada & Latin America+1 480 308 3555

WEBwww.jda.com

[email protected]

ASIA PACIFIC

Singapore+65 6305 4350

Australia

+61 2 8912 7900

Bangalore+91 80 3028 8888

Mumbai

+91 22 3088 7878

Japan+81 3 4461 1000

China

+86 21 2327 9400

EUROPEAMERICAS

Copyright © 2010, JDA Sotware Group, Inc. All rights reserved. JDA is a Registered Trademark o JDA Sotware Group, Inc. All other company and product names may be Trademarks, Registered Trademarks or Service Marks o the companies with which they are associated. JDA reserves the right at any time and without notice to change these materials or any o the unctions, eatures or

specications o any o the sotware described herein. JDA shall have no warranty obligation with respect to these materials or the sotware described herein, except as approved in JDA’s Sotware LicenseAgreement with an authorized licensee.

11.09.10

- l