J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING

  • View
    221

  • Download
    1

Embed Size (px)

Text of J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D...

No Slide TitleSAFETY
G.Bobbink (Management Board L3)
Very Important
Start of Dismantling L3 after purge of gas and electrical safety is assured
in other words:
Don’t dare to put out ANY module or crate!
L3 stays as it is at least until 8.12.2000
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
Work in heigth:
Keep at least 3m away from operational machine
Safety shoes everywhere on point 2
Helmet in UX25, U2, U5 (cavern), P5
Gloves recommended
Only specially trained persons
Use of approved equipment
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
Personnel
Objects
Fire:
Electricity:
Extinguishers: every second counts….
No amateurs
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
Chutes de dénivellation
Véhicules
CHUTES DE PLAIN-PIED, EMPLACEMENTS DE TRAVAIL 19%
24
12
13
2
18
1
1
1
3
4
3
1
Lésions
YEUX 19%
MAINS 36%
Chutes de dénivellation
Véhicules
( Source TIS/GS 10/2000 )
(88 accidents)
Chutes de dénivellation
Appareils de levage
Apparaux de levage
Absence de données
Chutes de dénivellation
Véhicules
88 accidents)
Non précisé
2 counters: 1 general LEP and 1 local (INB)
all readers are connected to central control room
new access database (updated after safety course)
for L3: access via small lift PX24, 2 two-way readers
for LEP : access via large lift PM 25
bringing up of material via lock
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
( gas detection will be dismantled by ST/EL
after purging of gas systems (FGSO))
Alarm level 3 test by TIS/GS
and the GLIMOS before dismantling
No smoking in dismantling areas
Every flammable material, e.g. wood, has to be brought onto
the surface every evening and put into the metal trash bins
Welders or other technicians must use adequate protection equipment against sparks or high temperatures pieces
Fire
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
Check 400 km of cables by ST/EL under control and responsibility by ST/EL and the GLIMOS
Every rack and power output is checked individually
for the Normal-, Experiment-, Safety- and UPS circuits
in P1, P2, P3, P4, P5, MCR, U1, U2, U4, U5, UX25 and SG2
Time estimate: 5 days, NO dismantling before!
Temporary power lines and sockets are available
Disconnecting of electrical cables from 1. to 7.12.2000
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
No rack cooling
No air conditioning
Stop of rough water supply (including mixed water) on 4.12.00
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
Restricted access to cavern
Normal run conditions
Safety shoes and helmet not needed
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
will immediately be denied to have access to point 2
Every action putting other peoples live in danger will be regarded as professional fault
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D
J.Pothier CERN EP/CMI
C.Schäfer CERN EP/L3D