Schrenk New

Embed Size (px)

Citation preview

  • 8/2/2019 Schrenk New

    1/57

    0,5 SPAN

    No y (m) (2y/b)^2 akar cp+total ccl cla1 cl real

    0 0 0 1 5.046927 2.523464 1.138234 0.119515

    1 0.30475 0.0025 0.998749 5.043388 2.521694 1.137435 0.119431

    2 0.6095 0.01 0.994987 5.032742 2.516371 1.135034 0.1191793 0.91425 0.0225 0.988686 5.01491 2.507455 1.131013 0.118756

    4 1.219 0.04 0.979796 4.989751 2.494876 1.125339 0.118161

    5 1.52375 0.0625 0.968246 4.957065 2.478533 1.117967 0.117387

    6 1.8285 0.09 0.953939 4.916579 2.458289 1.108836 0.116428

    7 2.13325 0.1225 0.93675 4.867934 2.433967 1.097865 0.115276

    8 2.438 0.16 0.916515 4.810671 2.405336 1.084951 0.11392

    9 2.74275 0.2025 0.893029 4.744206 2.372103 1.069961 0.112346

    10 3.0475 0.25 0.866025 4.667789 2.333895 1.052726 0.110536

    11 3.35225 0.3025 0.835165 4.580455 2.290228 1.03303 0.108468

    12 3.657 0.36 0.8 4.480942 2.240471 1.010587 0.106112

    13 3.96175 0.4225 0.759934 4.367559 2.183779 0.985015 0.103427

    14 4.2665 0.49 0.714143 4.237972 2.118986 0.95579 0.100358

    15 4.57125 0.5625 0.661438 4.088821 2.044411 0.922152 0.096826

    16 4.876 0.64 0.6 3.914956 1.957478 0.88294 0.092709

    17 5.18075 0.7225 0.526783 3.707757 1.853878 0.83621 0.087802

    18 5.4855 0.81 0.43589 3.450537 1.725268 0.7782 0.081711

    19 5.79025 0.9025 0.31225 3.100645 1.550322 0.699288 0.073425

    20 6.095 1 0 2.217 1.1085 0.5 0.0525

    MTOW 4500 rho 1.225

    Lift 55510.35 v 178.611Cl 0.105

    c 2.217

    b 12.19

    S 27.08

    phi 3.14

    S separo 13.54

    S station 0.675631

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    0 1 2 3 4 5 6 7

    Cl

    Half Span (m)

    Cl vs Span

  • 8/2/2019 Schrenk New

    2/57

    SF

    Lift Lift y w w+f w eng w arm

    Lift n=-3 n=6 Lift station Lift for SF 0

    1577.802 -4733.41 9466.814 1577.248972 27700.77 0.30475 769.7549

    1576.696 -4730.09 9460.174 1575.03164 26123.52 0.6095 769.7549

    1573.368 -4720.1 9440.206 1570.580125 24548.49 0.91425 769.75491567.793 -4703.38 9406.756 1563.860073 22977.91 1.219 769.7549

    1559.927 -4679.78 9359.565 1554.818269 21414.05 1.52375 769.7549

    1549.709 -4649.13 9298.254 1543.380434 19859.23 1.8285 769.7549

    1537.052 -4611.16 9222.311 1529.447964 18315.85 2.13325 769.7549 1529.42

    1521.844 -4565.53 9131.065 1512.893248 16786.4 2.438 769.7549 1529.42

    1503.942 -4511.83 9023.654 1493.552986 15273.51 2.74275 769.7549

    1483.164 -4449.49 8898.981 1471.218606 13779.95 3.0475 769.7549

    1459.274 -4377.82 8755.642 1445.622227 12308.73 3.35225 769.7549

    1431.971 -4295.91 8591.825 1416.415568 10863.11 3.657 769.7549

    1400.86 -4202.58 8405.162 1383.137013 9446.697 3.96175 769.7549

    1365.414 -4096.24 8192.482 1345.157681 8063.56 4.2665 769.7549 2665.6

    1324.902 -3974.7 7949.41 1301.587328 6718.402 4.57125 769.7549

    1278.273 -3834.82 7669.638 1251.095685 5416.815 4.876 769.7549

    1223.918 -3671.76 7343.51 1191.530327 4165.719 5.18075 769.7549

    1159.142 -3477.43 6954.854 1118.935422 2974.189 5.4855 769.7549

    1078.729 -3236.19 6472.371 1024.035798 1855.254 5.79025 769.7549

    969.343 -2908.03 5816.058 831.2177786 831.2178 6.095 769.7549

    693.0925 -2079.28 4158.555 0

    28836.21

    57672.43 W location w fraction jumlah

    wing 7915.738 395.7869 769.7549fuel 7479.36 373.968

    engine 1494.4 2.22176 747.2

    LG 1167.29 583.645 1529.42

    TB 397.15 198.575

    arm 2665.6 4.2504

    -1000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    0

  • 8/2/2019 Schrenk New

    3/57

    asumsi distribusi lift mendekati rectangular

    w total w for SF SF y for BM L stat for BM L stat sum BM w tot for BM

    769.7549 21119.54 6581.229 6.095 831.2177786 831.2177786 769.7549

    769.7549 20349.78 5773.735 5.79025 1024.035798 1855.253577 769.7549

    769.7549 19580.03 4968.458 5.4855 1118.935422 2974.188999 769.7549769.7549 18810.27 4167.633 5.18075 1191.530327 4165.719326 769.7549

    769.7549 18040.52 3373.528 4.876 1251.095685 5416.815011 769.7549

    769.7549 17270.76 2588.465 4.57125 1301.587328 6718.402338 769.7549

    2299.175 16501.01 1814.839 4.2665 1345.157681 8063.560019 3435.3549

    2299.175 14201.83 2584.566 3.96175 1383.137013 9446.697033 769.7549

    769.7549 11902.66 3370.848 3.657 1416.415568 10863.1126 769.7549

    769.7549 11132.9 2647.05 3.35225 1445.622227 12308.73483 769.7549

    769.7549 10363.15 1945.586 3.0475 1471.218606 13779.95343 769.7549

    769.7549 9593.394 1269.719 2.74275 1493.552986 15273.50642 769.7549

    769.7549 8823.639 623.0578 2.438 1512.893248 16786.39967 2299.1749

    3435.355 8053.884 9.675719 2.13325 1529.447964 18315.84763 2299.1749

    769.7549 4618.529 2099.873 1.8285 1543.380434 19859.22806 769.7549

    769.7549 3848.775 1568.041 1.52375 1554.818269 21414.04633 769.7549

    769.7549 3079.02 1086.7 1.219 1563.860073 22977.90641 769.7549

    769.7549 2309.265 664.9243 0.91425 1570.580125 24548.48653 769.7549

    769.7549 1539.51 315.7438 0.6095 1575.03164 26123.51817 769.7549

    769.7549 769.7549 61.46288 0.30475 1577.248972 27700.76714 769.7549

    0

    1 2 3 4 5 6 7Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N/m)

  • 8/2/2019 Schrenk New

    4/57

    w tot sum BM

    BM BM for chart

    769.7549 187.3081 1002.815

    1539.5098 914.1177 1759.546

    2309.2647 1823.721 2271.2073079.0196 2814.96 2540.172

    3848.7745 3822.883 2570.207

    4618.5294 4799.522 2366.504

    8053.8843 20.64073 1935.753

    8823.6392 1234.2 3150.586

    9593.3941 2321.68 4622.696

    10363.149 3261.045 4033.442

    11132.9039 4033.442 3261.045

    11902.6588 4622.696 2321.68

    14201.8337 3150.586 1234.2

    16501.0086 1935.753 20.64073

    17270.7635 2366.504 4799.522

    18040.5184 2570.207 3822.883

    18810.2733 2540.172 2814.96

    19580.0282 2271.207 1823.721

    20349.7831 1759.546 914.1177

    21119.538 1002.815 187.3081

  • 8/2/2019 Schrenk New

    5/57

    Schrenk Setengah Span Sayap

    y cl real Lift station

    (m) Cl=0,105 n=-3 n=6 (N)0 0 2.523464 1.138234 0.119515 -4733.41 9466.814 1577.249

    1 0.30475 2.521694 1.137435 0.119431 -4730.09 9460.174 1575.0316

    2 0.6095 2.516371 1.135034 0.119179 -4720.1 9440.206 1570.5801

    3 0.91425 2.507455 1.131013 0.118756 -4703.38 9406.756 1563.8601

    4 1.219 2.494876 1.125339 0.118161 -4679.78 9359.565 1554.8183

    5 1.52375 2.478533 1.117967 0.117387 -4649.13 9298.254 1543.3804

    6 1.8285 2.458289 1.108836 0.116428 -4611.16 9222.311 1529.448

    7 2.13325 2.433967 1.097865 0.115276 -4565.53 9131.065 1512.8932

    8 2.438 2.405336 1.084951 0.11392 -4511.83 9023.654 1493.553

    9 2.74275 2.372103 1.069961 0.112346 -4449.49 8898.981 1471.2186

    10 3.0475 2.333895 1.052726 0.110536 -4377.82 8755.642 1445.6222

    11 3.35225 2.290228 1.03303 0.108468 -4295.91 8591.825 1416.4156

    12 3.657 2.240471 1.010587 0.106112 -4202.58 8405.162 1383.137

    13 3.96175 2.183779 0.985015 0.103427 -4096.24 8192.482 1345.1577

    14 4.2665 2.118986 0.95579 0.100358 -3974.7 7949.41 1301.5873

    15 4.57125 2.044411 0.922152 0.096826 -3834.82 7669.638 1251.0957

    16 4.876 1.957478 0.88294 0.092709 -3671.76 7343.51 1191.5303

    17 5.18075 1.853878 0.83621 0.087802 -3477.43 6954.854 1118.9354

    18 5.4855 1.725268 0.7782 0.081711 -3236.19 6472.371 1024.0358

    19 5.79025 1.550322 0.699288 0.073425 -2908.03 5816.058 831.21778

    20 6.095 1.1085 0.5 0.0525 -2079.28 4158.55527700.767

    SF per-load

    y w w+f w arm w eng++ w total SF lift SF w+f SF arm SF eng++

    0

    0.30475 769.7549 769.7549 -27700.8 769.7549 2665.6 3058.84

    0.6095 769.7549 769.7549 -26123.5 769.7549 2665.6 3058.84

    0.91425 769.7549 769.7549 -24548.5 769.7549 2665.6 3058.84

    1.219 769.7549 769.7549 -22977.9 769.7549 2665.6 3058.84

    1.52375 769.7549 769.7549 -21414 769.7549 2665.6 3058.84

    1.8285 769.7549 769.7549 -19859.2 769.7549 2665.6 3058.84

    2.13325 769.7549 1529.42 2299.175 -18315.8 769.7549 2665.6 3058.84

    2.438 769.7549 1529.42 2299.175 -16786.4 769.7549 2665.6 1529.42

    2.74275 769.7549 769.7549 -15273.5 769.7549 2665.6 0

    3.0475 769.7549 769.7549 -13780 769.7549 2665.6 0

    3.35225 769.7549 769.7549 -12308.7 769.7549 2665.6 0

    3.657 769.7549 769.7549 -10863.1 769.7549 2665.6 0

    Lift Total

    No ccl cla1

  • 8/2/2019 Schrenk New

    6/57

    3.96175 769.7549 769.7549 -9446.7 769.7549 2665.6 0

    4.2665 769.7549 2665.6 3435.355 -8063.56 769.7549 2665.6 0

    4.57125 769.7549 769.7549 -6718.4 769.7549 0 0

    4.876 769.7549 769.7549 -5416.82 769.7549 0 0

    5.18075 769.7549 769.7549 -4165.72 769.7549 0 0

    5.4855 769.7549 769.7549 -2974.19 769.7549 0 0

    5.79025 769.7549 769.7549 -1855.25 769.7549 0 06.095 769.7549 769.7549 -831.218 769.7549 0 0

  • 8/2/2019 Schrenk New

    7/57

    SF

    Gaya Lintang Setengah Span Sayap

    No Lift station Lift for SF w total w for SF SF0 1577.248972 27700.76714 769.7549 21119.538 6581.229

    1 1575.03164 26123.51817 769.7549 20349.7831 5773.735

    2 1570.580125 24548.48653 769.7549 19580.0282 4968.458

    3 1563.860073 22977.90641 769.7549 18810.2733 4167.633

    4 1554.818269 21414.04633 769.7549 18040.5184 3373.528

    5 1543.380434 19859.22806 769.7549 17270.7635 2588.465

    6 1529.447964 18315.84763 2299.1749 16501.0086 1814.839

    7 1512.893248 16786.39967 2299.1749 14201.8337 2584.566

    8 1493.552986 15273.50642 769.7549 11902.6588 3370.848

    9 1471.218606 13779.95343 769.7549 11132.9039 2647.05

    10 1445.622227 12308.73483 769.7549 10363.149 1945.586

    11 1416.415568 10863.1126 769.7549 9593.3941 1269.719

    12 1383.137013 9446.697033 769.7549 8823.6392 623.0578

    13 1345.157681 8063.560019 3435.3549 8053.8843 9.675719

    14 1301.587328 6718.402338 769.7549 4618.5294 2099.873

    15 1251.095685 5416.815011 769.7549 3848.7745 1568.041

    16 1191.530327 4165.719326 769.7549 3079.0196 1086.7

    17 1118.935422 2974.188999 769.7549 2309.2647 664.9243

    18 1024.035798 1855.253577 769.7549 1539.5098 315.7438

    19 831.2177786 831.2177786 769.7549 769.7549 61.46288

    20

    BM per-load

    SF total y for BM Lift Station Lift Sum w w+f w w+f sum

    6.095

    -6581.229144 5.79025 831.2177786 831.2177786 769.7549 769.7549

    -5773.735072 5.4855 1024.035798 1855.253577 769.7549 1539.5098

    -4968.458332 5.18075 1118.935422 2974.188999 769.7549 2309.2647

    -4167.633107 4.876 1191.530327 4165.719326 769.7549 3079.0196

    -3373.527934 4.57125 1251.095685 5416.815011 769.7549 3848.7745

    -2588.464565 4.2665 1301.587328 6718.402338 769.7549 4618.5294

    -1814.839031 3.96175 1345.157681 8063.560019 769.7549 5388.2843

    -2584.565967 3.657 1383.137013 9446.697033 769.7549 6158.0392

    -3370.84762 3.35225 1416.415568 10863.1126 769.7549 6158.0392

    -2647.049533 3.0475 1445.622227 12308.73483 769.7549 7697.549

    -1945.585828 2.74275 1471.218606 13779.95343 769.7549 8467.3039

    -1269.718501 2.438 1493.552986 15273.50642 769.7549 9237.0588

  • 8/2/2019 Schrenk New

    8/57

    -623.0578327 2.13325 1512.893248 16786.39967 769.7549 10006.8137

    -9.675719479 1.8285 1529.447964 18315.84763 769.7549 10776.5686

    -2099.872938 1.52375 1543.380434 19859.22806 769.7549 11546.3235

    -1568.040511 1.219 1554.818269 21414.04633 769.7549 12316.0784

    -1086.699726 0.91425 1563.860073 22977.90641 769.7549 13085.8333

    -664.9242986 0.6095 1570.580125 24548.48653 769.7549 13855.5882

    -315.7437765 0.30475 1575.03164 26123.51817 769.7549 14625.3431-61.46287863 0 1577.248972 27700.76714 769.7549 15395.098

  • 8/2/2019 Schrenk New

    9/57

    y for BM L stat for BM L stat sum BM w tot sum BM BM(m) (N) (N) (N) (N/m)

    6.095 831.2177786 831.2177786 769.7549 187.3081226

    5.79025 1024.035798 1855.253577 1539.5098 914.117701

    5.4855 1118.935422 2974.188999 2309.2647 1823.72112

    5.18075 1191.530327 4165.719326 3079.0196 2814.959802

    4.876 1251.095685 5416.815011 3848.7745 3822.882765

    4.57125 1301.587328 6718.402338 4618.5294 4799.522084

    4.2665 1345.157681 8063.560019 8053.8843 20.64072858

    3.96175 1383.137013 9446.697033 8823.6392 1234.199684

    3.657 1416.415568 10863.1126 9593.3941 2321.680279

    3.35225 1445.622227 12308.73483 10363.149 3261.045046

    3.0475 1471.218606 13779.95343 11132.9039 4033.441727

    2.74275 1493.552986 15273.50642 11902.6588 4622.696154

    2.438 1512.893248 16786.39967 14201.8337 3150.585914

    2.13325 1529.447964 18315.84763 16501.0086 1935.752681

    1.8285 1543.380434 19859.22806 17270.7635 2366.503728

    1.52375 1554.818269 21414.04633 18040.5184 2570.206594

    1.219 1563.860073 22977.90641 18810.2733 2540.172379

    0.91425 1570.580125 24548.48653 19580.0282 2271.206515

    0.6095 1575.03164 26123.51817 20349.7831 1759.545763

    0.30475 1577.248972 27700.76714 21119.538 1002.8147910

    w eng w arm w tot BM Lift BM w+f BM arm BM eng+TB+LG

    769.7549 126.656809 -117.291403 0 0

    769.7549 -67.89551766 -234.582806 0 0

    769.7549 -1252.567745 -351.874209 0 0

    769.7549 -4151.8664 -469.165612 0 0

    769.7549 -9546.202698 -586.457014 0 0

    2665.6 3435.3549 -18260.87273 -703.748417 4874.0496 0

    769.7549 -31158.12571 -821.03982 -5643.47504 0

    769.7549 -49131.04102 -938.331223 -4831.13344 0

    769.7549 -73098.5324 -1055.62263 -4018.79184 0

    769.7549 -104001.1012 -1172.91403 -3206.45024 0

    769.7549 -142797.1112 -1290.20543 -2394.10864 0

    1529.42 2299.1749 -190459.4393 -1407.49683 -1581.76704 2195.084761

  • 8/2/2019 Schrenk New

    10/57

    1529.42 2299.1749 -247972.4009 -1524.78824 -769.42544 5322.351012

    769.7549 -316328.8803 -1642.07964 42.91616 6254.532502

    769.7549 -396527.6098 -1759.37104 855.25776 7186.713992

    769.7549 -489570.5589 -1876.66245 1667.59936 8118.895482

    769.7549 -596460.3954 -1993.95385 2479.94096 9051.076972

    769.7549 -718197.9924 -2111.24525 3292.28256 9983.258462

    769.7549 -855779.9531 -2228.53665 4104.62416 10915.43995769.7549 -1010196.13 -2345.82806 4916.96576 11847.62144

  • 8/2/2019 Schrenk New

    11/57

    BM

    9.365406132

    -302.478323

    -1604.44195

    -4621.03201

    -10132.6597

    -14090.5715

    -37622.6406

    -54900.5057

    -78172.9469

    -108380.465

    -146481.425

    -191253.618

  • 8/2/2019 Schrenk New

    12/57

  • 8/2/2019 Schrenk New

    13/57

    Schrenk Setengah Span Sayap

    y cl real Lift station

    (m) Cl=0,105 n=1 n=-3 n=6 (N)

    0 0 2.523464 1.138234 0.119515 1577.802 -4733.41 9466.814 1577.249

    1 0.30475 2.521694 1.137435 0.119431 1576.696 -4730.09 9460.174 1575.0322 0.6095 2.516371 1.135034 0.119179 1573.368 -4720.1 9440.206 1570.58

    3 0.91425 2.507455 1.131013 0.118756 1567.793 -4703.38 9406.756 1563.86

    4 1.219 2.494876 1.125339 0.118161 1559.927 -4679.78 9359.565 1554.818

    5 1.52375 2.478533 1.117967 0.117387 1549.709 -4649.13 9298.254 1543.38

    6 1.8285 2.458289 1.108836 0.116428 1537.052 -4611.16 9222.311 1529.448

    7 2.13325 2.433967 1.097865 0.115276 1521.844 -4565.53 9131.065 1512.893

    8 2.438 2.405336 1.084951 0.11392 1503.942 -4511.83 9023.654 1493.553

    9 2.74275 2.372103 1.069961 0.112346 1483.164 -4449.49 8898.981 1471.219

    10 3.0475 2.333895 1.052726 0.110536 1459.274 -4377.82 8755.642 1445.622

    11 3.35225 2.290228 1.03303 0.108468 1431.971 -4295.91 8591.825 1416.416

    12 3.657 2.240471 1.010587 0.106112 1400.86 -4202.58 8405.162 1383.137

    13 3.96175 2.183779 0.985015 0.103427 1365.414 -4096.24 8192.482 1345.158

    14 4.2665 2.118986 0.95579 0.100358 1324.902 -3974.7 7949.41 1301.587

    15 4.57125 2.044411 0.922152 0.096826 1278.273 -3834.82 7669.638 1251.096

    16 4.876 1.957478 0.88294 0.092709 1223.918 -3671.76 7343.51 1191.53

    17 5.18075 1.853878 0.83621 0.087802 1159.142 -3477.43 6954.854 1118.935

    18 5.4855 1.725268 0.7782 0.081711 1078.729 -3236.19 6472.371 1024.036

    19 5.79025 1.550322 0.699288 0.073425 969.343 -2908.03 5816.058 831.2178

    20 6.095 1.1085 0.5 0.0525 693.0925 -2079.28 4158.555

    27700.77

    No ccl cla1Lift

    Lift Total

  • 8/2/2019 Schrenk New

    14/57

    0,5 SPAN

    No y (m) (2y/b)^2 akar cp+total ccl cla1 cl real

    0 0 0 1 5.046927 2.523464 1.138234 0.119515

    1 0.30475 0.0025 0.998749 5.043388 2.521694 1.137435 0.119431

    2 0.6095 0.01 0.994987 5.032742 2.516371 1.135034 0.1191793 0.91425 0.0225 0.988686 5.01491 2.507455 1.131013 0.118756

    4 1.219 0.04 0.979796 4.989751 2.494876 1.125339 0.118161

    5 1.52375 0.0625 0.968246 4.957065 2.478533 1.117967 0.117387

    6 1.8285 0.09 0.953939 4.916579 2.458289 1.108836 0.116428

    7 2.13325 0.1225 0.93675 4.867934 2.433967 1.097865 0.115276

    8 2.438 0.16 0.916515 4.810671 2.405336 1.084951 0.11392

    9 2.74275 0.2025 0.893029 4.744206 2.372103 1.069961 0.112346

    10 3.0475 0.25 0.866025 4.667789 2.333895 1.052726 0.110536

    11 3.35225 0.3025 0.835165 4.580455 2.290228 1.03303 0.108468

    12 3.657 0.36 0.8 4.480942 2.240471 1.010587 0.106112

    13 3.96175 0.4225 0.759934 4.367559 2.183779 0.985015 0.103427

    14 4.2665 0.49 0.714143 4.237972 2.118986 0.95579 0.100358

    15 4.57125 0.5625 0.661438 4.088821 2.044411 0.922152 0.096826

    16 4.876 0.64 0.6 3.914956 1.957478 0.88294 0.092709

    17 5.18075 0.7225 0.526783 3.707757 1.853878 0.83621 0.087802

    18 5.4855 0.81 0.43589 3.450537 1.725268 0.7782 0.081711

    19 5.79025 0.9025 0.31225 3.100645 1.550322 0.699288 0.073425

    20 6.095 1 0 2.217 1.1085 0.5 0.0525

    MTOW 4500 rho 1.225

    Lift 55510.35 v 178.611Cl 0.105

    c 2.217

    b 12.19

    S 27.08

    phi 3.14

    S separo 13.54

    S station 0.675631

  • 8/2/2019 Schrenk New

    15/57

    SF

    Lift Lift y w w+f w eng w arm

    Lift n=-3 n=6 Lift station Lift for SF 0

    1577.802 -4733.41 9466.814 1577.248972 27700.77 0.30475 769.7549

    1576.696 -4730.09 9460.174 1575.03164 26123.52 0.6095 769.7549

    1573.368 -4720.1 9440.206 1570.580125 24548.49 0.91425 769.75491567.793 -4703.38 9406.756 1563.860073 22977.91 1.219 769.7549

    1559.927 -4679.78 9359.565 1554.818269 21414.05 1.52375 769.7549

    1549.709 -4649.13 9298.254 1543.380434 19859.23 1.8285 769.7549

    1537.052 -4611.16 9222.311 1529.447964 18315.85 2.13325 769.7549 1529.42

    1521.844 -4565.53 9131.065 1512.893248 16786.4 2.438 769.7549 1529.42

    1503.942 -4511.83 9023.654 1493.552986 15273.51 2.74275 769.7549

    1483.164 -4449.49 8898.981 1471.218606 13779.95 3.0475 769.7549

    1459.274 -4377.82 8755.642 1445.622227 12308.73 3.35225 769.7549

    1431.971 -4295.91 8591.825 1416.415568 10863.11 3.657 769.7549

    1400.86 -4202.58 8405.162 1383.137013 9446.697 3.96175 769.7549

    1365.414 -4096.24 8192.482 1345.157681 8063.56 4.2665 769.7549 2665.6

    1324.902 -3974.7 7949.41 1301.587328 6718.402 4.57125 769.7549

    1278.273 -3834.82 7669.638 1251.095685 5416.815 4.876 769.7549

    1223.918 -3671.76 7343.51 1191.530327 4165.719 5.18075 769.7549

    1159.142 -3477.43 6954.854 1118.935422 2974.189 5.4855 769.7549

    1078.729 -3236.19 6472.371 1024.035798 1855.254 5.79025 769.7549

    969.343 -2908.03 5816.058 831.2177786 831.2178 6.095 769.7549

    693.0925 -2079.28 4158.555

    28836.21

    57672.43 W location w fraction jumlah

    wing 7915.738 395.7869 769.7549fuel 7479.36 373.968

    engine 1494.4 2.22176 747.2

    LG 1167.29 583.645 1529.42

    TB 397.15 198.575

    arm 2665.6 4.2504

    -1000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    0

  • 8/2/2019 Schrenk New

    16/57

    asumsi distribusi lift mendekati

    w total w for SF SF SF for BM y for BM L stat for BM L stat sum BM

    0

    769.7549 21119.54 6581.229 61.46288 0.30475 831.2177786 831.2177786

    769.7549 20349.78 5773.735 315.7438 0.6095 1024.035798 1855.253577

    769.7549 19580.03 4968.458 664.9243 0.91425 1118.935422 2974.188999769.7549 18810.27 4167.633 1086.7 1.219 1191.530327 4165.719326

    769.7549 18040.52 3373.528 1568.041 1.52375 1251.095685 5416.815011

    769.7549 17270.76 2588.465 2099.873 1.8285 1301.587328 6718.402338

    2299.175 16501.01 1814.839 9.675719 2.13325 1345.157681 8063.560019

    2299.175 14201.83 2584.566 623.0578 2.438 1383.137013 9446.697033

    769.7549 11902.66 3370.848 1269.719 2.74275 1416.415568 10863.1126

    769.7549 11132.9 2647.05 1945.586 3.0475 1445.622227 12308.73483

    769.7549 10363.15 1945.586 2647.05 3.35225 1471.218606 13779.95343

    769.7549 9593.394 1269.719 3370.848 3.657 1493.552986 15273.50642

    769.7549 8823.639 623.0578 2584.566 3.96175 1512.893248 16786.39967

    3435.355 8053.884 9.675719 1814.839 4.2665 1529.447964 18315.84763

    769.7549 4618.529 2099.873 2588.465 4.57125 1543.380434 19859.22806

    769.7549 3848.775 1568.041 3373.528 4.876 1554.818269 21414.04633

    769.7549 3079.02 1086.7 4167.633 5.18075 1563.860073 22977.90641

    769.7549 2309.265 664.9243 4968.458 5.4855 1570.580125 24548.48653

    769.7549 1539.51 315.7438 5773.735 5.79025 1575.03164 26123.51817

    769.7549 769.7549 61.46288 6581.229 6.095 1577.248972 27700.76714

    1 2 3 4 5 6 7Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N/m)

  • 8/2/2019 Schrenk New

    17/57

    rectangular asumsi distribusi lift rectangular, dihitung

    w tot for BM w tot sum BM y for BM L stat for BM L stat sum BM

    BM BM for chart 0

    769.7549 769.7549 9.365406 20056.3 0.30475 831.2177786 831.2177786

    769.7549 1539.5098 96.22292 16715.68 0.6095 1024.035798 1855.253577

    769.7549 2309.2647 303.9535 13627.24 0.91425 1118.935422 2974.188999769.7549 3079.0196 662.3435 10795.73 1.219 1191.530327 4165.719326

    769.7549 3848.7745 1194.651 8224.661 1.52375 1251.095685 5416.815011

    769.7549 4618.5294 1919.809 5916.259 1.8285 1301.587328 6718.402338

    3435.3549 8053.8843 10.32036 3871.505 2.13325 1345.157681 8063.560019

    769.7549 8823.6392 759.5075 5119.702 2.438 1383.137013 9446.697033

    769.7549 9593.3941 1741.26 6163.595 2.74275 1416.415568 10863.1126

    769.7549 10363.149 2964.586 4436.786 3.0475 1445.622227 12308.73483

    769.7549 11132.9039 4436.786 2964.586 3.35225 1471.218606 13779.95343

    769.7549 11902.6588 6163.595 1741.26 3.657 1493.552986 15273.50642

    2299.1749 14201.8337 5119.702 759.5075 3.96175 1512.893248 16786.39967

    2299.1749 16501.0086 3871.505 10.32036 4.2665 1529.447964 18315.84763

    769.7549 17270.7635 5916.259 1919.809 4.57125 1543.380434 19859.22806

    769.7549 18040.5184 8224.661 1194.651 4.876 1554.818269 21414.04633

    769.7549 18810.2733 10795.73 662.3435 5.18075 1563.860073 22977.90641

    769.7549 19580.0282 13627.24 303.9535 5.4855 1570.580125 24548.48653

    769.7549 20349.7831 16715.68 96.22292 5.79025 1575.03164 26123.51817

    769.7549 21119.538 20056.3 9.365406 6.095 1577.248972 27700.76714

    -700000

    -600000

    -500000

    -400000

    -300000

    -200000

    -100000

    0

    100000

    0 1 2

  • 8/2/2019 Schrenk New

    18/57

    per station

    w tot for BM w tot sum BM

    BM BM for chart

    769.7549 769.7549 9.365406132 -605842.3646

    769.7549 1539.5098 -185.1869205 -511096.3235

    769.7549 2309.2647 -1017.984939 -427972.4554769.7549 3079.0196 -2978.952371 -355715.4903

    769.7549 3848.7745 -6613.917626 -293563.4077

    769.7549 4618.5294 -12513.59399 -240749.9176

    3435.3549 8053.8843 -24148.84346 -196506.9348

    769.7549 8823.6392 -33242.40503 -153541.8023

    769.7549 9593.3941 -46165.00084 -115052.1419

    769.7549 10363.149 -63622.54939 -86338.83175

    769.7549 11132.9039 -86338.83175 -63622.54939

    769.7549 11902.6588 -115052.1419 -46165.00084

    2299.1749 14201.8337 -153541.8023 -33242.40503

    2299.1749 16501.0086 -196506.9348 -24148.84346

    769.7549 17270.7635 -240749.9176 -12513.59399

    769.7549 18040.5184 -293563.4077 -6613.917626

    769.7549 18810.2733 -355715.4903 -2978.952371

    769.7549 19580.0282 -427972.4554 -1017.984939

    769.7549 20349.7831 -511096.3235 -185.1869205

    769.7549 21119.538 -605842.3646 9.365406132

    3 4 5 6 7

    Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N/m)

  • 8/2/2019 Schrenk New

    19/57

    0,5 SPAN

    No y (m) (2y/b)^2 akar cp+total ccl cla1 cl real

    0 0 0 1 5.046927 2.523464 1.138234 0.119515

    1 0.30475 0.0025 0.998749 5.043388 2.521694 1.137435 0.119431

    2 0.6095 0.01 0.994987 5.032742 2.516371 1.135034 0.1191793 0.91425 0.0225 0.988686 5.01491 2.507455 1.131013 0.118756

    4 1.219 0.04 0.979796 4.989751 2.494876 1.125339 0.118161

    5 1.52375 0.0625 0.968246 4.957065 2.478533 1.117967 0.117387

    6 1.8285 0.09 0.953939 4.916579 2.458289 1.108836 0.116428

    7 2.13325 0.1225 0.93675 4.867934 2.433967 1.097865 0.115276

    8 2.438 0.16 0.916515 4.810671 2.405336 1.084951 0.11392

    9 2.74275 0.2025 0.893029 4.744206 2.372103 1.069961 0.112346

    10 3.0475 0.25 0.866025 4.667789 2.333895 1.052726 0.110536

    11 3.35225 0.3025 0.835165 4.580455 2.290228 1.03303 0.108468

    12 3.657 0.36 0.8 4.480942 2.240471 1.010587 0.106112

    13 3.96175 0.4225 0.759934 4.367559 2.183779 0.985015 0.103427

    14 4.2665 0.49 0.714143 4.237972 2.118986 0.95579 0.100358

    15 4.57125 0.5625 0.661438 4.088821 2.044411 0.922152 0.096826

    16 4.876 0.64 0.6 3.914956 1.957478 0.88294 0.092709

    17 5.18075 0.7225 0.526783 3.707757 1.853878 0.83621 0.087802

    18 5.4855 0.81 0.43589 3.450537 1.725268 0.7782 0.081711

    19 5.79025 0.9025 0.31225 3.100645 1.550322 0.699288 0.073425

    20 6.095 1 0 2.217 1.1085 0.5 0.0525

    MTOW 4500 rho 1.225

    Lift 55510.35 v 178.611Cl 0.105

    c 2.217

    b 12.19

    S 27.08

    phi 3.14

    S separo 13.54

    S station 0.675631

    0

    0.02

    0.04

    0.06

    0.08

    0.1

    0.12

    0.14

    0 1 2 3 4 5 6 7

    Cl

    Setengah Span (m)

  • 8/2/2019 Schrenk New

    20/57

  • 8/2/2019 Schrenk New

    21/57

    SF

    Lift Lift y w wing w fuel w wing sum

    Lift n=-3 n=6 Lift station Lift for SF 0

    1577.802 -4733.41 9466.814 1577.248972 27700.77 0.30475 197.895 339.9709 197.895

    1576.696 -4730.09 9460.174 1575.03164 26123.52 0.6095 197.895 339.9709 395.79

    1573.368 -4720.1 9440.206 1570.580125 24548.49 0.91425 197.895 339.9709 593.6851567.793 -4703.38 9406.756 1563.860073 22977.91 1.219 197.895 339.9709 791.58

    1559.927 -4679.78 9359.565 1554.818269 21414.05 1.52375 197.895 339.9709 989.475

    1549.709 -4649.13 9298.254 1543.380434 19859.23 1.8285 197.895 339.9709 1187.37

    1537.052 -4611.16 9222.311 1529.447964 18315.85 2.13325 197.895 339.9709 1385.265

    1521.844 -4565.53 9131.065 1512.893248 16786.4 2.438 197.895 339.9709 1583.16

    1503.942 -4511.83 9023.654 1493.552986 15273.51 2.74275 197.895 339.9709 1781.055

    1483.164 -4449.49 8898.981 1471.218606 13779.95 3.0475 197.895 339.9709 1978.95

    1459.274 -4377.82 8755.642 1445.622227 12308.73 3.35225 197.895 339.9709 2176.845

    1431.971 -4295.91 8591.825 1416.415568 10863.11 3.657 197.895 2374.74

    1400.86 -4202.58 8405.162 1383.137013 9446.697 3.96175 197.895 2572.635

    1365.414 -4096.24 8192.482 1345.157681 8063.56 4.2665 197.895 2770.53

    1324.902 -3974.7 7949.41 1301.587328 6718.402 4.57125 197.895 2968.425

    1278.273 -3834.82 7669.638 1251.095685 5416.815 4.876 197.895 3166.32

    1223.918 -3671.76 7343.51 1191.530327 4165.719 5.18075 197.895 3364.215

    1159.142 -3477.43 6954.854 1118.935422 2974.189 5.4855 197.895 3562.11

    1078.729 -3236.19 6472.371 1024.035798 1855.254 5.79025 197.895 3760.005

    969.343 -2908.03 5816.058 831.2177786 831.2178 6.095 197.895 3957.9

    693.0925 -2079.28 4158.555

    28836.21

    57672.43 W location w fraction jumlah

    wing 3957.9 197.895 537.8659fuel 3739.68 339.9709

    engine 1494.4 2.22176 747.2

    LG 1167.29 583.645 1,529

    TB 397.15 198.575

    arm 2665.6 4.2504

    reaksi tail 5,928

  • 8/2/2019 Schrenk New

    22/57

  • 8/2/2019 Schrenk New

    23/57

    w wing sum w fuel sum w fuel sum w eng w arm w total w for SF SF lift SF wing

    reversed reversed

    3957.9 339.970909 3739.68 537.8659 13422.02 -27700.8 3957.9

    3760.005 679.941818 3399.70909 537.8659 12884.15 -26123.5 3760.005

    3562.11 1019.91273 3059.73818 537.8659 12346.29 -24548.5 3562.113364.215 1359.88364 2719.76727 537.8659 11808.42 -22977.9 3364.215

    3166.32 1699.85455 2379.79636 537.8659 11270.56 -21414 3166.32

    2968.425 2039.82545 2039.82545 537.8659 10732.69 -19859.2 2968.425

    2770.53 2379.79636 1699.85455 1529.42 2067.286 10194.82 -18315.8 2770.53

    2572.635 2719.76727 1359.88364 1529.42 2067.286 8127.539 -16786.4 2572.635

    2374.74 3059.73818 1019.91273 537.8659 6060.253 -15273.5 2374.74

    2176.845 3399.70909 679.941818 537.8659 5522.387 -13780 2176.845

    1978.95 3739.68 339.970909 537.8659 4984.521 -12308.7 1978.95

    1781.055 197.895 4446.655 -10863.1 1781.055

    1583.16 197.895 4248.76 -9446.7 1583.16

    1385.265 2665.6 2863.495 4050.865 -8063.56 1385.265

    1187.37 197.895 1187.37 -6718.4 1187.37

    989.475 197.895 989.475 -5416.82 989.475

    791.58 197.895 791.58 -4165.72 791.58

    593.685 197.895 593.685 -2974.19 593.685

    395.79 197.895 395.79 -1855.25 395.79

    197.895 197.895 197.895 -831.218 197.895

    -30000

    -25000

    -20000

    -15000

    -10000

    -5000

    0

    5000

    10000

    0 1 2 3

    Force(N)

    Half Sp

    SF p

    -6000

    -4000

    -2000

    0

    0 1 2 3

    N)

    SF

  • 8/2/2019 Schrenk New

    24/57

    -16000

    -14000

    -12000

    -10000

    -8000

    Force(

    Half S

  • 8/2/2019 Schrenk New

    25/57

    SF fuel SF arm SF eng++ SF total SF for BM SF n=6

    3739.68 2665.6 3058.84 -14278.7 -633.323 -85672.5

    3399.709 2665.6 3058.84 -13239.4 -1459.46 -79436.2

    3059.738 2665.6 3058.84 -12202.2 -2380.5 -73213.22719.767 2665.6 3058.84 -11169.5 -3374.14 -67016.9

    2379.796 2665.6 3058.84 -10143.5 -4427.34 -60860.9

    2039.825 2665.6 3058.84 -9126.54 -5531.03 -54759.2

    1699.855 2665.6 3058.84 -8121.02 -4012.7 -48726.1

    1359.884 2665.6 1529.42 -8658.86 -5197.94 -51953.2

    1019.913 2665.6 0 -9213.25 -6416.46 -55279.5

    679.9418 2665.6 0 -8257.57 -7324.21 -49545.4

    339.9709 2665.6 0 -7324.21 -8257.57 -43945.3

    0 2665.6 0 -6416.46 -9213.25 -38498.7

    0 2665.6 0 -5197.94 -8658.86 -31187.6

    0 2665.6 0 -4012.7 -8121.02 -24076.2

    0 0 0 -5531.03 -9126.54 -33186.2

    0 0 0 -4427.34 -10143.5 -26564

    0 0 0 -3374.14 -11169.5 -20244.8

    0 0 0 -2380.5 -12202.2 -14283

    0 0 0 -1459.46 -13239.4 -8756.78

    0 0 0 -633.323 -14278.7 -3799.94

    4 5 6 7

    an (m)

    er-load

    Lift

    Weight

    Arm

    Eng+TB+LG

    Fuel

    4 5 6 7

    Wing

  • 8/2/2019 Schrenk New

    26/57

    pan (m)

    SF Total

  • 8/2/2019 Schrenk New

    27/57

    -700000

    -600000

    -500000

    -400000

    -300000

    -200000

    -100000

    0

    100000

    0 1 2

  • 8/2/2019 Schrenk New

    28/57

  • 8/2/2019 Schrenk New

    29/57

    3 4 5 6 7

    Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N/m)

  • 8/2/2019 Schrenk New

    30/57

    0,5 SPAN

    No y (m) (2y/b)^2 akar cp+total ccl cla1 cl real

    0 0 0 1 5.046927 2.523464 1.138234 0.119515

    1 0.30475 0.0025 0.998749 5.043388 2.521694 1.137435 0.119431

    2 0.6095 0.01 0.994987 5.032742 2.516371 1.135034 0.1191793 0.91425 0.0225 0.988686 5.01491 2.507455 1.131013 0.118756

    4 1.219 0.04 0.979796 4.989751 2.494876 1.125339 0.118161

    5 1.52375 0.0625 0.968246 4.957065 2.478533 1.117967 0.117387

    6 1.8285 0.09 0.953939 4.916579 2.458289 1.108836 0.116428

    7 2.13325 0.1225 0.93675 4.867934 2.433967 1.097865 0.115276

    8 2.438 0.16 0.916515 4.810671 2.405336 1.084951 0.11392

    9 2.74275 0.2025 0.893029 4.744206 2.372103 1.069961 0.112346

    10 3.0475 0.25 0.866025 4.667789 2.333895 1.052726 0.110536

    11 3.35225 0.3025 0.835165 4.580455 2.290228 1.03303 0.108468

    12 3.657 0.36 0.8 4.480942 2.240471 1.010587 0.106112

    13 3.96175 0.4225 0.759934 4.367559 2.183779 0.985015 0.103427

    14 4.2665 0.49 0.714143 4.237972 2.118986 0.95579 0.100358

    15 4.57125 0.5625 0.661438 4.088821 2.044411 0.922152 0.096826

    16 4.876 0.64 0.6 3.914956 1.957478 0.88294 0.092709

    17 5.18075 0.7225 0.526783 3.707757 1.853878 0.83621 0.087802

    18 5.4855 0.81 0.43589 3.450537 1.725268 0.7782 0.081711

    19 5.79025 0.9025 0.31225 3.100645 1.550322 0.699288 0.073425

    20 6.095 1 0 2.217 1.1085 0.5 0.0525

    MTOW 4500 rho 1.225

    Lift 55510.35 v 178.611Cl 0.105

    c 2.217

    b 12.19

    S 27.08

    phi 3.14

    S separo 13.54

    S station 0.675631

  • 8/2/2019 Schrenk New

    31/57

  • 8/2/2019 Schrenk New

    32/57

    SF

    Lift Lift y w w+f w eng w arm

    Lift n=-3 n=6 Lift station Lift for SF 0

    1577.802 -4733.41 9466.814 1577.248972 27700.77 0.30475 537.8659

    1576.696 -4730.09 9460.174 1575.03164 26123.52 0.6095 537.8659

    1573.368 -4720.1 9440.206 1570.580125 24548.49 0.91425 537.86591567.793 -4703.38 9406.756 1563.860073 22977.91 1.219 537.8659

    1559.927 -4679.78 9359.565 1554.818269 21414.05 1.52375 537.8659

    1549.709 -4649.13 9298.254 1543.380434 19859.23 1.8285 537.8659

    1537.052 -4611.16 9222.311 1529.447964 18315.85 2.13325 537.8659 1529.42

    1521.844 -4565.53 9131.065 1512.893248 16786.4 2.438 537.8659 1529.42

    1503.942 -4511.83 9023.654 1493.552986 15273.51 2.74275 537.8659

    1483.164 -4449.49 8898.981 1471.218606 13779.95 3.0475 537.8659

    1459.274 -4377.82 8755.642 1445.622227 12308.73 3.35225 537.8659

    1431.971 -4295.91 8591.825 1416.415568 10863.11 3.657 537.8659

    1400.86 -4202.58 8405.162 1383.137013 9446.697 3.96175 537.8659

    1365.414 -4096.24 8192.482 1345.157681 8063.56 4.2665 537.8659 2665.6

    1324.902 -3974.7 7949.41 1301.587328 6718.402 4.57125 537.8659

    1278.273 -3834.82 7669.638 1251.095685 5416.815 4.876 537.8659

    1223.918 -3671.76 7343.51 1191.530327 4165.719 5.18075 537.8659

    1159.142 -3477.43 6954.854 1118.935422 2974.189 5.4855 537.8659

    1078.729 -3236.19 6472.371 1024.035798 1855.254 5.79025 537.8659

    969.343 -2908.03 5816.058 831.2177786 831.2178 6.095 537.8659

    693.0925 -2079.28 4158.555

    28836.21

    57672.43 W location w fraction jumlah

    wing 3957.9 197.895 537.8659fuel 3739.68 339.9709

    engine 1494.4 2.22176 747.2

    LG 1167.29 583.645 1529.42

    TB 397.15 198.575

    arm 2665.6 4.2504

    -1000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    0

  • 8/2/2019 Schrenk New

    33/57

  • 8/2/2019 Schrenk New

    34/57

    asumsi distribusi lift mendekati

    w total w for SF SF SF for BM y for BM L stat for BM L stat sum BM

    0

    537.8659 16481.76 11219.01 293.3519 0.30475 831.2177786 831.2177786

    537.8659 15943.89 10179.63 779.5218 0.6095 1024.035798 1855.253577

    537.8659 15406.03 9142.46 1360.591 0.91425 1118.935422 2974.188999537.8659 14868.16 8109.746 2014.256 1.219 1191.530327 4165.719326

    537.8659 14330.29 7083.752 2727.485 1.52375 1251.095685 5416.815011

    537.8659 13792.43 6066.799 3491.207 1.8285 1301.587328 6718.402338

    2067.286 13254.56 5061.285 1632.899 2.13325 1345.157681 8063.560019

    2067.286 11187.28 5599.123 2478.17 2.438 1383.137013 9446.697033

    537.8659 9119.991 6153.516 3356.719 2.74275 1416.415568 10863.1126

    537.8659 8582.125 5197.828 4264.476 3.0475 1445.622227 12308.73483

    537.8659 8044.259 4264.476 5197.828 3.35225 1471.218606 13779.95343

    537.8659 7506.393 3356.719 6153.516 3.657 1493.552986 15273.50642

    537.8659 6968.527 2478.17 5599.123 3.96175 1512.893248 16786.39967

    3203.466 6430.661 1632.899 5061.285 4.2665 1529.447964 18315.84763

    537.8659 3227.195 3491.207 6066.799 4.57125 1543.380434 19859.22806

    537.8659 2689.33 2727.485 7083.752 4.876 1554.818269 21414.04633

    537.8659 2151.464 2014.256 8109.746 5.18075 1563.860073 22977.90641

    537.8659 1613.598 1360.591 9142.46 5.4855 1570.580125 24548.48653

    537.8659 1075.732 779.5218 10179.63 5.79025 1575.03164 26123.51817

    537.8659 537.8659 293.3519 11219.01 6.095 1577.248972 27700.76714

    1 2 3 4 5 6 7Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N/m)

  • 8/2/2019 Schrenk New

    35/57

  • 8/2/2019 Schrenk New

    36/57

    rectangular asumsi dis

    w tot for BM w tot sum BM y for BM

    BM BM for chart 0 6.095 0

    537.8659091 537.8659091 44.69949 34189.93 0.30475 5.79025 0.30475

    537.8659091 1075.731818 237.5593 29471.29 0.6095 5.4855 0.6095

    537.8659091 1613.597727 621.9603 25075.48 0.91425 5.18075 0.91425537.8659091 2151.463636 1227.689 21007.28 1.219 4.876 1.219

    537.8659091 2689.329545 2078.003 17270.19 1.52375 4.57125 1.52375

    537.8659091 3227.195455 3191.836 13866.43 1.8285 4.2665 1.8285

    3203.465909 6430.661364 1741.691 10796.99 2.13325 3.96175 2.13325

    537.8659091 6968.527273 3020.889 11091.16 2.438 3.657 2.438

    537.8659091 7506.393182 4603.321 11251.7 2.74275 3.35225 2.74275

    537.8659091 8044.259091 6497.995 8712.21 3.0475 3.0475 3 .0475

    537.8659091 8582.125 8712.21 6497.995 3.35225 2.74275 3.35225

    537.8659091 9119.990909 11251.7 4603.321 3.657 2.438 3.657

    2067.285909 11187.27682 11091.16 3020.889 3.96175 2.13325 3.96175

    2067.285909 13254.56273 10796.99 1741.691 4.2665 1.8285 4.2665

    537.8659091 13792.42864 13866.43 3191.836 4.57125 1.52375 4.57125

    537.8659091 14330.29455 17270.19 2078.003 4.876 1.219 4.876

    537.8659091 14868.16045 21007.28 1227.689 5.18075 0.91425 5.18075

    537.8659091 15406.02636 25075.48 621.9603 5.4855 0.6095 5.4855

    537.8659091 15943.89227 29471.29 237.5593 5.79025 0.30475 5.79025

    537.8659091 16481.75818 34189.93 44.69949 6.095 0 6.095

    -700000

    -600000

    -500000

    -400000

    -300000

    -200000

    -100000

    0

    100000

    0 1 2 3 4 5 6 7

    Half Span (m)

    SF & BM n=1

    SF (N)

    BM (N

  • 8/2/2019 Schrenk New

    37/57

  • 8/2/2019 Schrenk New

    38/57

    tribusi lift rectangular, dihitung per station

    L stat for BM L stat sum BM w wing w wing sum BM w fuel

    831.2177786 831.2177786 197.895 197.895

    1024.035798 1855.253577 197.895 395.79

    1118.935422 2974.188999 197.895 593.6851191.530327 4165.719326 197.895 791.58

    1251.095685 5416.815011 197.895 989.475

    1301.587328 6718.402338 197.895 1187.37

    1345.157681 8063.560019 197.895 1385.265

    1383.137013 9446.697033 197.895 1583.16

    1416.415568 10863.1126 197.895 1583.16

    1445.622227 12308.73483 197.895 1978.95 339.9709091

    1471.218606 13779.95343 197.895 2176.845 339.9709091

    1493.552986 15273.50642 197.895 2374.74 339.9709091

    1512.893248 16786.39967 197.895 2572.635 339.9709091

    1529.447964 18315.84763 197.895 2770.53 339.9709091

    1543.380434 19859.22806 197.895 2968.425 339.9709091

    1554.818269 21414.04633 197.895 3166.32 339.9709091

    1563.860073 22977.90641 197.895 3364.215 339.9709091

    1570.580125 24548.48653 197.895 3562.11 339.9709091

    1575.03164 26123.51817 197.895 3760.005 339.9709091

    1577.248972 27700.76714 197.895 3957.9 339.9709091

    3957.9

    /m)

    -80000

    -70000

    -60000

    -50000

    -40000

    -30000

    -20000

    -10000

    0

    10000

    0 1 2 3 4 5

    Momen(N/m)

    Half Span (m)

    BM per-load (Lift only)

  • 8/2/2019 Schrenk New

    39/57

  • 8/2/2019 Schrenk New

    40/57

    w eng w arm w tot for BM w tot sum BM

    BM Lift BM wing

    197.895 197.895 126.656809 -30.15425063

    197.895 395.79 29.38064568 -60.30850125

    197.895 593.685 -365.5100968 -90.46275188197.895 791.58 -1090.334761 -120.6170025

    197.895 989.475 -2169.20202 -150.7712531

    2665.6 2863.495 3852.97 -3621.647026 -180.9255038

    197.895 4050.865 -5464.111736 -211.0797544

    197.895 4248.76 -7710.72615 -241.234005

    197.895 4446.655 -10373.78075 -271.3882556

    197.895 4644.55 -13464.03763 -301.5425063

    197.895 4842.445 -16990.94763 -331.6967569

    1529.42 1727.315 6569.76 -20962.8083 -361.8510075

    1529.42 1727.315 8297.075 -25386.88228 -392.0052581

    197.895 8494.97 -30269.48794 -422.1595088

    197.895 8692.865 -35616.06991 -452.3137594

    197.895 8890.76 -41431.25423 -482.46801

    197.895 9088.655 -47718.89167 -512.6222606

    197.895 9286.55 -54482.0915 -542.7765113

    197.895 9484.445 -61723.24733 -572.9307619

    197.895 9682.34 -69444.05618 -603.0850125

    3957.9

    -2000

    0

    2000

    4000

    6000

    8000

    10000

    12000

    0 1 2 3 4 5

    Momen(N/m)

    Half Span (m)

    BM per-load

    0

    10000

    BM Total

    6 7

    BM Lift

  • 8/2/2019 Schrenk New

    41/57

    -60000

    -50000

    -40000

    -30000

    -20000

    -10000

    Momen(N/m)

    Half Span (m)

  • 8/2/2019 Schrenk New

    42/57

  • 8/2/2019 Schrenk New

    43/57

    BM Total

  • 8/2/2019 Schrenk New

    44/57

    SF lift SF lift used SF w+f used SF arm

    -52957.32794 -831.2177786 831.2177786 769.7549 2665.6

    -46899.08486 -1855.253577 1855.253577 769.7549 2665.6

    -41320.49481 -2974.188999 2974.188999 769.7549 2665.6-36219.86075 -4165.719326 4165.719326 769.7549 2665.6

    -31594.78908 -5416.815011 5416.815011 769.7549 2665.6

    -27442.17053 -6718.402338 6718.402338 769.7549 2665.6

    -23758.15433 -8063.560019 8063.560019 769.7549 2665.6

    -20538.11444 -9446.697033 9446.697033 769.7549 2665.6

    -17445.88446 -10863.1126 10863.1126 769.7549 2665.6

    -13873.68629 -12308.73483 12308.73483 769.7549 2665.6

    -11077.16057 -13779.95343 13779.95343 769.7549 2665.6

    -8251.060364 -15273.50642 15273.50642 769.7549 2665.6

    -6370.193115 -16786.39967 16786.39967 769.7549 2665.6

    -4905.766051 -18315.84763 18315.84763 769.7549 2665.6

    -3845.488689 -19859.22806 19859.22806 769.7549 0

    -2319.973273 -21414.04633 21414.04633 769.7549 0

    -1210.951763 -22977.90641 22977.90641 769.7549 0

    -455.9728487 -24548.48653 24548.48653 769.7549 0

    -30.92785557 -26123.51817 26123.51817 769.7549 0

    96.50255839 -27700.76714 27700.76714 769.7549 0

  • 8/2/2019 Schrenk New

    45/57

  • 8/2/2019 Schrenk New

    46/57

    SF arm used SF eng++ SF eng++ used SF total SF for BM SF for BM

    0 3058.84 0 799.9092 1372.84 -1372.84

    0 3058.84 0 830.0634 1342.686 -1342.69

    0 3058.84 0 860.2177 1312.531 -1312.530 3058.84 0 890.3719 1282.377 -1282.38

    0 3058.84 0 920.5262 1252.223 -1252.22

    0 3058.84 0 950.6804 1222.069 -1222.07

    2665.6 3058.84 0 980.8347 1191.914 -1191.91

    2665.6 1529.42 0 1010.989 1161.76 -1161.76

    2665.6 0 0 1041.143 1131.606 -1131.61

    2665.6 0 0 1071.297 1101.452 -1101.45

    2665.6 0 0 1101.452 1071.297 -1071.3

    2665.6 0 0 1131.606 1041.143 -1041.14

    2665.6 0 3058.84 1161.76 1010.989 -1010.99

    2665.6 0 3058.84 1191.914 980.8347 -980.835

    2665.6 0 3058.84 1222.069 950.6804 -950.68

    2665.6 0 3058.84 1252.223 920.5262 -920.526

    2665.6 0 3058.84 1282.377 890.3719 -890.372

    2665.6 0 3058.84 1312.531 860.2177 -860.218

    2665.6 0 3058.84 1342.686 830.0634 -830.063

    2665.6 0 1529.42 1372.84 799.9092 -799.909

  • 8/2/2019 Schrenk New

    47/57

    SPAR

    TEBAL WEB

    SF n=6 ht Qv L n=6 T Qt Qw t

    x 1,5

    -128509 0.56 229479.9 9466.814 3148.189 5635.008 235114.9 0.00091

    -119154 0.56 212775.5 9460.174 3145.981 5631.056 218406.6 0.000845-109820 0.56 196106.8 9440.206 3139.34 5619.17 201725.9 0.00078

    -100525 0.56 179509.6 9406.756 3128.217 5599.259 185108.8 0.000716

    -91291.4 0.56 163020.4 9359.565 3112.523 5571.17 168591.5 0.000652

    -82138.8 0.56 146676.5 9298.254 3092.134 5534.675 152211.2 0.000589

    -73089.2 0.56 130516.4 9222.311 3066.88 5489.471 136005.9 0.000526

    -77929.7 0.56 139160.3 9131.065 3036.536 5435.158 144595.4 0.000559

    -82919.3 0.56 148070.1 9023.654 3000.816 5371.223 153441.4 0.000594

    -74318.1 0.56 132710.9 8898.981 2959.356 5297.013 138007.9 0.000534

    -65917.9 0.56 117710.6 8755.642 2911.689 5211.692 122922.3 0.000476

    -57748.1 0.56 103121.6 8591.825 2857.211 5114.182 108235.8 0.000419

    -46781.4 0.56 83538.27 8405.162 2795.137 5003.073 88541.35 0.000343

    -36114.3 0.56 64489.74 8192.482 2724.41 4876.478 69366.22 0.000268

    -49779.3 0.56 88891.59 7949.41 2643.576 4731.792 93623.38 0.000362

    -39846.1 0.56 71153.68 7669.638 2550.538 4565.261 75718.94 0.000293

    -30367.3 0.56 54227.24 7343.51 2442.084 4371.137 58598.38 0.000227

    -21424.5 0.56 38258.1 6954.854 2312.837 4139.794 42397.89 0.000164

    -13135.2 0.56 23455.66 6472.371 2152.387 3852.602 27308.27 0.000106

    -5699.91 0.56 10178.4 5816.058 1934.13 3461.939 13640.34 5.28E-05

    0 0.56 0 4158.555 1382.927 2475.33 2475.33 2.25E-05

  • 8/2/2019 Schrenk New

    48/57

    t(mm) fs

    2024 110

    0.909535 pakai tebal=2,2 mm -14278.7 -85672.5 -128509

    0.8449 -13239.4 -79436.2 -1191540.780371 -12202.2 -73213.2 -109820

    0.716088 7075 258.5 -11169.5 -67016.9 -100525

    0.652192 pakai tebal=1,2 mm -10143.5 -60860.9 -91291.4

    0.588825 -9126.54 -54759.2 -82138.8

    0.526135 -8121.02 -48726.1 -73089.2

    0.559363 517 -8658.86 -51953.2 -77929.7

    0.593584 -9213.25 -55279.5 -82919.3

    0.53388 -8257.57 -49545.4 -74318.1

    0.475521 -7324.21 -43945.3 -65917.9

    0.418707 -6416.46 -38498.7 -57748.1

    0.34252 -5197.94 -31187.6 -46781.4

    0.268341 -4012.7 -24076.2 -36114.3

    0.362179 -5531.03 -33186.2 -49779.3

    0.292917 -4427.34 -26564 -39846.1

    0.226686 -3374.14 -20244.8 -30367.3

    0.164015 -2380.5 -14283 -21424.5

    0.105641 -1459.46 -8756.78 -13135.2

    0.052767 -633.323 -3799.94 -5699.91

    0.022503

  • 8/2/2019 Schrenk New

    49/57

    Q vQ/I q used

    v Ix 1 0.000124966 79563.31 79563.31 6400997

    128509 0.000202 2 0.000156135 99408.15 178971.5 14398543

    3 0.000156135 99408.15 278379.6 22396090

    4 0.000156135 99408.15 377787.8 30393636

    5 0.000124966 79563.31 457351.1 58208320 73589265.356 0.000109329 69607.91 387743.2 24956902

    7 0.000126193 80344.42 307398.8 19785572

    8 0.000126193 80344.42 227054.3 14614243

    9 0.000126193 80344.42 146709.9 9442913

    10 0.000126193 80344.42 66365.5 4271583 73071212.78

    11 0.000109329 69607.91 204868798.4

    q111 -265752.1479

    centroid total

    A 1 5 0.00088628 0.001773 0.141 3.52404E-05

    234 0.00110734 0.003322 6.60452E-05

    6 11 0.00078654 0.000440464 0.001573 0.139 3.03936E-05

    78910 0.00090786 0.001016805 0.003631 7.01632E-05

    0.001457269 0.010299 0.141494 Ix 0.000201842

    A1 A5 0.000886

    A2 A3 A4 0.001107

    A6 A11 0.000787A7 A8 A9 A1 0.000908

    L 1-2 0.000998 m2

    L 6-7 0.000798 m2

    L 5-6 0.000336 m2

    BUCKLING

    11

    1 2

    10 9

    M

    11

    1 2

    10 9

    M

  • 8/2/2019 Schrenk New

    50/57

  • 8/2/2019 Schrenk New

    51/57

  • 8/2/2019 Schrenk New

    52/57

    Pa Mpa

    A fb atas 121600451 121.600451

    0.00005488 0.000188 fb bawah 81851616.3 81.8516163

    0.000133389 Poisson Corrected Reserve Factor

    fb atas 124179565 124.179565 0.375635 FAIL

    fb bawah 83587667.9 83.5876679 0.252847 FAIL

    Cek ESDU, ganti sesuai ts/t dan d/h

    K 4.22

    K 4.3

  • 8/2/2019 Schrenk New

    53/57

    Reserve Fctr

    1.291646 shear center segitiga2

    1.632065 A segitiga 0.027934 0.139671

    7.628755 ref titik 1

    8.346263 Ve=T(q)

    ve=Aq+...

    Aq total

    -10809.9238

    1.65 e -0.08412 m dari titik 1

    1.41

    Momen Torsi pada 1/4 c

    jarak ke sc 0.221886 m

    arah momen pada a/c positif ccw

    T 28514.41

    q 51038.52 ccw

    0.004 m

    0.0022 m

    0.00165 m 56 53521.63

    0.00011 m2 67 6815.444

    0.000219 m2 78 2326.729

    2.217 m 89 -2161.98

    0.99765 m 910 -6650.7

    128509 N 1011 -11139.4

    476616 Nm sum 42711.71

    0.33255 m

    1.3302 m e 0.332364

    0.003991 m

  • 8/2/2019 Schrenk New

    54/57

    hitung luas A segitiga

    L176=Ltrapesium-Lsegitiga156

    segitiga 0

    167 0.027934 1

    178 0.027934 2

    189 0.027934 3

    190 0.027934 411011 0.027934

  • 8/2/2019 Schrenk New

    55/57

  • 8/2/2019 Schrenk New

    56/57

    A tot skin 0.003991

    A tot string 0.001995

    A stringer 0.000133

    E 71700000000Perbandingan Geometri Stringer

    nama mm m A mm m

    d bf 19.23 0.01923 0.000049998 0.00011 18.33 0.01833

    td tf 2.6 0.0026 2 0.002

    h bw 34.28 0.03428 0.00005999 36.66 0.03666

    ts tw 1.75 0.00175 2 0.002

    t 3.1 0.0031 3.1 0.0031

    b atas 199.53 0.19953 199.53 0.19953

    b bawah 249.4 0.2494 249.4 0.2494

    d/h 0.560968 d/h 0.5

    td/ts 1.485714 td/ts 1

    ts/t 0.564516 ts/t 0.64516129

    h/b atas 0.171804 h/b atas 0.18373177

    h/b bawah 0.13745 h/b bawah 0.146992783

    bf/bw 0.5

    bf/tf 9.165

    bw/tw 18.33

  • 8/2/2019 Schrenk New

    57/57

    A fb atas 76497705

    3.67E-05 0.00011 fb bawah 50403540

    7.33E-05

    K 4.42

    K 4.55