36
Eidgenössische Elektrizitätskommission ElCom Commission fédérale de l’électricité ElCom Commissione federale dell’energia elettrica ElCom Federal Electricity Commission ElCom Haupttitel Tasks and challenges of ElCom Haupttitel Tasks and challenges of ElCom Hans Jörg Schötzau, Vice President ElCom Forum Fribourg 18 November 2011 «Switzerland’s role in the European electricity market»

Haupttitel Tasks and challenges of ElComTasks and ... · • Claim to basic supply of major consumers (around 20 cases) • Monitoring of security of supply (in preparation) ... Support

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Eidgenössische Elektrizitätskommission ElComCommission fédérale de l’électricité ElComCommissione federale dell’energia elettrica ElComFederal Electricity Commission ElCom

HaupttitelTasks and challenges of ElComHaupttitelTasks and challenges of ElComHans Jörg Schötzau, Vice President

ElCom ForumFribourg18 November 2011

«Switzerland’s role in the European electricity market»

Topics

1. Introduction

2 Current challenges2. Current challenges

3. Cross-border issues

4. New energy policy

2«Switzerland’s role in the European electricity market», 18 November 2011

1.01 Organisation of ElCom

FederalCouncil ElCom is independent of the Federal

Council and the administrative authorities

ElCom7 Members

Council and the administrative authorities

7 Members Commission Secretariat

Networks and International

TechnicalSecretariatDETEC (SFOE)

International Relations

Prices and Tariffs

Legal Affairs

3«Switzerland’s role in the European electricity market», 18 November 2011

1.02 ElCom has the following powers:

• To decide as a court of justice on all matters relating to the implementation of the legislation

• To make decisions regarding tariffs for network use and electricity• To make decisions regarding tariffs for network use and electricity tariffs (ex-officio or in response to complaints)

• To regulate network access (switch to upper network level)g ( )

• To decide on the use of auction revenues

• To regulate market procedures for congestion management

• To ensure coordination with other national regulators

• To monitor and supervise the development of the electricity markets

• To monitor the quality and security of network supply

4«Switzerland’s role in the European electricity market», 18 November 2011

Topics

1. Introduction

2 Current challenges2. Current challenges

3. Cross-border issues

4. New energy policy

5«Switzerland’s role in the European electricity market», 18 November 2011

2.01 ElCom activity statistics

Activity Numbersince 2008

Tariff complaints 2553Tariff complaints 2553General complaints concerning power prices 737Feed-in remuneration 170Other requests 739Applications in accordance with Art. 31a of the ElectricityS l O di (i t t t f 2004 f iliti )

106Supply Ordinance (interest rate for pre-2004 facilities)Total 4305Settled 3805Settled 3805Pending before the Federal Administrative Court 9Pending before the Federal Supreme Court 4

6«Switzerland’s role in the European electricity market», 18 November 2011

2.02 Examples of current issues

• Transfer of transmission network to Swissgrid

• Requests for reassessment of power station tariff for ancillaryiservices

• Distribution of auction revenues for 2009 and 2010

F d i ti l i t ti f l t i it f• Feed-in remuneration: claim to compensation for electricity fromrenewable energies where the same turbine is used for simultaneousgeneration of steam from fossil fuels?

• Costs for grid reinforcement as a result of renewable energies

7«Switzerland’s role in the European electricity market», 18 November 2011

2.03 Examples of current issues

• At present, around 20 cases are pending with regard to tariffs atdistribution network level:

N t k ti f th ti l ti d ti t– Network: correction of synthetic valuations and operating costs

– Energy costs: specification of the term „production costs“ inaccordance with Art. 4 paragraph 1 of the Electricity Supply Ordinancep g p y pp y

• Claim to basic supply of major consumers (around 20 cases)

• Monitoring of security of supply (in preparation)

8«Switzerland’s role in the European electricity market», 18 November 2011

2.04 Example of network strengthening: approval of costsfor financing through ancillary services tariff

• Costs for grid reinforcement are part of Swissgrid’s ancillary services• Requests have to be approved by ElCom• Payment will be approved only for necessary network strengthening

(projet-by-project evaluation)• The connection point and the total costs are the decisive criteriap

Variante 1 Variante 2

Anschlusspunkt

9«Switzerland’s role in the European electricity market», 18 November 2011

2.05 Example: monitoring risks regarding securityof supply (in preparation)

Risklikelihood

NetworkProductionPriceEnvironment

Severity /Impact

10«Switzerland’s role in the European electricity market», 18 November 2011

Topics

1. Introduction

2 C t h ll2. Current challenges

3. Cross-border issues

4. New energy policy

11«Switzerland’s role in the European electricity market», 18 November 2011

3.01 Participation of Switzerland in European agencies/bodies

ENTSO-EEU CommissionACER

Framework Guidelines

CEER

ElCom SwissgridFramework Guidelines

Network Codes

UVEK Comitology

Legal effect in CH?

12«Switzerland’s role in the European electricity market», 18 November 2011

3.02 Cooperation with CEER

• The Council of European Energy Regulators (CEER) is the voice of European national regulators of electricity and gas at EU and international level.

• CEER works closely with and supports the work of the Agency for the Cooperation of Energy Regulators (ACER).

• ElCom attends the Electricity Working Group (EWG). In 2011, EWG focused on the following areas of work:– Security of supplySecurity of supply– Quality of supply– Sustainable development

S t id– Smart grids

Application for observer status submitted

13«Switzerland’s role in the European electricity market», 18 November 2011

3.03 Balancing Market: Access / international coordination

Products and volumes:

+/- 77 MW Primary control power+/ 400 MW Secondary control power+/- 400 MW Secondary control power+ 510 MW Tertiary control power positive- 460 MW Tertiary control power negativ

ca. 1 TWh Loss of energy per Yearca. 8 TVarh Reactive energy per Year

Since 2010: cross-border access France – SwitzerlandCH/FR: Balancing mechanism, FR/CH: Primary control power

Planned for 2012: Common procedure Germany – SwitzerlandPrimary control power (joint tender DE/CH: CH-part = 25 MW)

14«Switzerland’s role in the European electricity market», 18 November 2011

3.04 Monitoring balancing market: coordination with BNAand CRE

80

Primary (PRL) and Secondary (SRL) control power price changes in 2011

60

70

MW

/h]

40

50

e [C

HF/

M

PRL most expensive 20 MWSRL most expensive 20 MW

30

40

Pric

e p

201 5 9 13 17 21 25 29 33 37 41 45

Calendar weekSource: Swissgrid data own presentation

15«Switzerland’s role in the European electricity market», 18 November 2011

Source: Swissgrid data, own presentation

3.05 Congestion management

Installed thermal capacity11‘950 MW

7‘450 MW 1‘350 MW

7‘200 MW7 200 MW

NTC FR DE AT ITImp. Exp. Imp. Exp. Imp. Exp. Imp. Exp.p p p p p p p p

Summer 3000 1100 2060 4400 540 1000 1660 3385Winter 3200 1100 1500 3500 470 1200 1910 4165

16«Switzerland’s role in the European electricity market», 18 November 2011Source: Swissgrid

3.06 Development of transmission grid

• Swissgrid: > 200 extension projects, grouped intoexpansion programmes

Source: Swissgrid

A il bl i t/ t iti d ll ti d t th b d Available import/export capacities and allocation procedures at the bordersare also linked with congestion within CH and/or within DE/FR/AT/IT

Investment plan to be coordinated at EU-level (ENTSO-E)

17«Switzerland’s role in the European electricity market», 18 November 2011

3.07 Congestion Management: relevant regions for CH

Central West

DE+

FRCH AT

ITSI

Central South

18«Switzerland’s role in the European electricity market», 18 November 2011

3.08 Price differentials and price convergence betweenCH and DE / FR / IT

20

30∆P [€/MWh]

-10

0

10

-30

-20

10

∆P CH FR ∆P CH DE ∆P CH IT

Price convergence 2010-2011 (+/- 1 €/MWh)

-40∆P CH-FR ∆P CH-DE ∆P CH-IT

2010 2011

CH-DE CH-FR CH-IT15.2% 18.9% 9.0%

Source: Swissgrid data own presentation

19«Switzerland’s role in the European electricity market», 18 November 2011

Source: Swissgrid data, own presentation

3.09 Evolution: from explicit to implicit auctions

Intraday ExplizitY / M / D

ImplizitATC

ImplizitFB

FR-CH DBS 2012 ?DE-CH DBS 2012 ?AT-CH APG 2012 ?IT-CH ? ? ?

Price convergence D-1 CH: CWE*: CWE**:Price convergence D-1 10-20% 50-60% 80-90%

* CWE Market Coupling Operational Report (28th of October 2011)**Study: CWE Enhanced Flow-Based MC feasibility report (19th of October 2011)

20«Switzerland’s role in the European electricity market», 18 November 2011

y y p ( )

3.10 Efficiency in interconnection uses: methodology

Programmes / NTC: Rate of use[%]100%

50%

0%

50%

100%

21«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

100%Rate of use[%]

Imports into CH50%

0%

Exports from CH50%

100%

22«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

Rate of use[%]100%

50%

Price differential betweenPrice zones: ∆P [€/MWh]0%

50%

100%

23«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

Rate of use[%]100%

Price CH > Price FR/DE/AT/ITPrice CH < Price FR/DE/AT/IT50%

∆P [€/MWh]0%

50%

100%

24«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

Rate of use[%]100%

Imports againstprice differential

Under-use ofimport capacity

50%

∆P [€/MWh]0%

Exports againstprice differential

Under-use ofexport capacity50%

100%

25«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

Ideal situationRate of use[%]100%

Imports againstprice differential

Under-use ofimport capacity

50%

∆P [€/MWh]0%

Exports againstprice differential

Under-use ofexport capacity50%

100%

26«Switzerland’s role in the European electricity market», 18 November 2011

3.10 Efficiency in interconnection uses: methodology

Rate of use[%]100%

Each dot represents 1h out of 8760h in total

Rate of use = 40%50%

∆P [€/MWh]0%

50%

∆P = -30 €/MWh

100%

27«Switzerland’s role in the European electricity market», 18 November 2011

3.11 DE-CH use of capacities 2010 (D-1, without Intraday)

Rate of use[%]100%

50%

∆P [€/MWh]0%

50%

Source: Swissgrid data own presentation100%

28«Switzerland’s role in the European electricity market», 18 November 2011

Source: Swissgrid data, own presentation

3.12 CH-IT use of capacities 2010 (D-1, without Intraday)

Rate of use[%]100%

50%

∆P [€/MWh]0%

50%

Source: Swissgrid data own presentation100%

29«Switzerland’s role in the European electricity market», 18 November 2011

Source: Swissgrid data, own presentation

3.13 Implication for congestion management

1. Legal obligations for ElCom and Swissgrid in accordance with Articles 8 and 20 of the Electricity Supply

Act: to ensure an efficient, highly performing grid operationg y p g g p

2. Evolution from explicit to implicit auctions

3 The requirements for implicit auctions are:3. The requirements for implicit auctions are:

Power Exchange

CH-Northern border: contract with CWE-Partner CH Northern border: contract with CWE Partner

4. Support from BNA and CRE, i.e. favourable time window

5 ElCom conclusion: essential to strive for coupling to CWE by5. ElCom conclusion: essential to strive for coupling to CWE bymid 2012.

30«Switzerland’s role in the European electricity market», 18 November 2011

Topics

1. Introduction

2 Current challenges2. Current challenges

3. Cross-border issues

4. New energy policy

31«Switzerland’s role in the European electricity market», 18 November 2011

4.01 Nuclear phase-out

• In response to the incidents in Japan, the intention is to phase out nuclear power in Switzerland

• The existing power plants will be closed down at the end of their• The existing power plants will be closed down at the end of their working life and will not be replaced by new nuclear power plants

• Security of supply is to be guaranteed by:

– energy efficiency

– further expansion of hydropower and other renewable energies

– fossil power production (where necessary)

– imports

– grid development

32«Switzerland’s role in the European electricity market», 18 November 2011

4.02 Technical considerations regarding the German andSwiss decision to phase out nuclear power

• BNA Report “Auswirkungen des KKW-Moratoriums”

• CEER: Ad Hoc Group on Nuclear Shutdown (AHGNS)• CEER: Ad Hoc Group on Nuclear Shutdown (AHGNS)

• ENTSO-E: Generation adequacy (Winter Outlook Report)

• DE/CH-TSO: joint declarations concerning the grid situation

• DETEC: establishment of a working group

33«Switzerland’s role in the European electricity market», 18 November 2011

4.03 ElCom findings regarding the new Energy Policy

• Effects on security of supply is on our radar screen

• Grid development planning is rendered more difficult:

– focus on decentralised production?

– focus on imports?

– connection to supergrid?

– smart grid?

• Stable framework conditions are crucial for investment security (e.g. base load production)

• Limits of the current Electricity Supply Act in regards to claimable• Limits of the current Electricity Supply Act in regards to claimable costs (e.g. electro mobility and nationwide smart metering can currently not be financed via the network use tariff)

34«Switzerland’s role in the European electricity market», 18 November 2011

Summary

Future challenges for ElCom:

• Various domestic issues, namely

– grid tariff audit / grid strengthening

– Transfer of TSO ownership

• Cross-border issues are becoming ever more important, namely

– further development of congestion rules (e.g. implicit auctions)

– cooperation with other regulators and CEER / ACER

• Energy policy, namely

– monitoring of the security of supply

– impact on grid development

35«Switzerland’s role in the European electricity market», 18 November 2011

Thank you for your attention!

36«Switzerland’s role in the European electricity market», 18 November 2011