28
A I M S ACHEN NTERNATIONAL INING YMPOSIA AIMS 2009 Fifth International Symposium Aachen, Germany Programm und Anmeldung Program and Registration th (as of May 20 , 2009) in Cooperation with Mining Equipment sponsored by High Performance Mining Focus Areas: Automation, Communication Infrastructure rd th June 3 and 4 , 2009 AACHEN INTERNATIONAL MINING SYMPOSIA

in Cooperation with A C Mining Equipment H E N I High ... Mining, NL Ein neuer Ansatz zur Bestimmung des optimalen Übergangspunktes von Tagebau zum untertägigen Bergbau am Beispiel

Embed Size (px)

Citation preview

A I M SACHEN NTERNATIONAL INING YMPOSIA

AIMS 2009

Fifth International Symposium

Aachen, Germany

Programm und AnmeldungProgram and Registration

th(as of May 20 , 2009)

in Cooperation with

Mining Equipment

sponsored by

High Performance MiningFocus Areas:

Automation, Communication

Infrastructure

rd thJune 3 and 4 , 2009

AA

CH

EN

INT

ER

NA

TIO

NA

L M

ININ

G S

YM

PO

SIA

WELCOME

Prof. Dr.-Ing.Dipl.-Wirt.Ing.Per Nicolai Martens

www.aims.rwth-aachen.de

AACHEN NTERNATIONAL INING YMPOSIAI M S

A I M Sachen nternational ining ymposia thwelcomes you to the 5 International Symposium

“Focus Areas:

Automation, Communication, Infrastructure

in cooperation with RAG Deutsche Steinkohle & Mining Equipment Association of VDMA

sponsored by Becker Mining Systems AG

Eickhoff Bergbautechnik GmbHHilti

Dear Delegate,

it is an honour and a pleasure for me, as the Head of the Institute of

High Performance Mining”

Mining Engineering I at the RWTH Aachen University and as the chairman of the Executive Committee of AIMS, to invite you to the 5th International Symposium “High Performance Mining” here in Aachen.

The AIMS series of symposia has to come to be recognized by the mining society as a leader in promoting the international transfer of technology. In view of the expressed interest by mining professionals from around the world, AIMS Symposia like “Rockbolting in Mining”, “High-Performance Mine Production” and “Rapid Mine Development” have been organized since 1987 on an annual basis.

This year's symposium will strive to provide a forum for presentation, discussion and evaluation of state-of-the-art and emerging technologies in the field of High Performance Mining with special emphasis to Automation, Communication and Infrastructure.

The event is designed to be a place for the exchange of information among experts, which in times of further internationalization and globalization must not be limited to national or european borders. About 48 presentations by high ranking experts from Australia, Canada, India, Iran, Japan, South Africa, USA and from Europe as Austria, Germany, Greece, Netherlands, Poland, Romania, Russia, Sweden and Turkey are contributing to this objective.

Apart from this, companies active in the field of mining will present themselves in an exhibition.

Take a look at the preliminary program and I look forward to seeing you in Aachen.

The town of Aachen is situated in the heart of Europe and well known for its´ beautiful historical city center, in particular the ancient cathedral and the city hall.

RAG Deutsche Steinkohle and Mining Equipment Association of VDMA, the City of Aachen and the RWTH Aachen University.

Exhibition space is still available at the conference and interested companies should contact the organizers for further information.

At this point, I would like to thank a large number of people for their help organizing and executing such an event. This includes authors, presenters and chairmen and the companies who support us by advertising in the proceedings. In particular I would like to thank our sponsors Becker Mining Systems AG, Eickhoff Bergbautechnik GmbH, Hilti and our partners

Come and take the opportunity to discuss the new and topical themes of hands on experience and research and development with other experts of the mining world. We hope that you will be able to join us at the symposium, and look forward to extending a warm welcome to all delegates and affiliates.

Announcement

Cooperation Partner:

Sponsors:

AIMS 2007: 400 participants

Motivation

High performance mining is a synonym for increased efficiency, increased productivity and higher production rates in raw materials extraction. These became the deciding factors in determining the economic success of a mining operation.

The global trend in underground mining operations is towards ever increasing productivity. The important factors affecting productivity are:

Automation, Communication,

Infrastructure

These encompass: advances in propulsion and extraction technology, logistics, preventative maintenance, planning and organisation.

The focal point will therefore be the continuous development of technologies aimed at improving performance and productivity. Benchmarking between different mining operations and sectors can point out areas which have potential for improvement.

The symposium continues to provide a platform for knowledge exchange between international representatives of mining, tunnelling, suppliers, authorities and research.

Within the framework of AIMS (Aachen International Mining Symposia) the Institute of Mining Engineering I is pleased to announce the

th 5 International Symposium

High Performance Mining

Focus Areas:Automation, Communication,

Infrastructure

rd thDate: June 3 and 4 , 2009

Venue: Aachen, Germany

Ankündigung

Kooperationpartner:

Sponsoren:

AIMS 2007: 400 Teilnehmer

Motivation

“Hochleistungsabbaubetriebe” ist ein Synonym für Leistungssteigerung, Produktivitätssteigerung und höhere Produktionsraten in der Gewinnung. Diese sind heutzutage entscheidend für den wirt-schaftlichen Erfolg von Bergbauunternehmen.

Weltweit geht der Trend zu immer leistungs-fähigeren Tiefbaubetrieben. Ausschlaggebend für weitere Produktivitäts-steigerungen sind:

Automatisierung, Kommunikation,

Infrastruktur

Diese umfassen: Fortschritte in der Antriebs- und Gewinnungstechnik, Logistik, Instandhaltung, Planung und Organisation.

Hier kann ein Vergleich zwischen Bergwerken und Bergbauzweigen eine Hilfestellung geben.

Im Rahmen von AIMS (Aachen International Mining Symposia) veranstaltet das Institut für Bergbaukunde I das

5. Internationale Kolloquium

High Performance Mining

Schwerpunkte:Automatisierung, Kommunikation,

Infrastruktur

Termin: 3. und 4. Juni 2009

Ort: Aachen

Einen wesentlichen Schwerpunkt der Themen werden daher Fragen der kontinuierlichen Verbesserung von Technologien und Verfahrensweisen zur weiteren Steigerung der Produktivität bilden.

In bewährter Weise soll auch diesmal eine Plattform für den Erfahrungsaustausch zwischen internationalen Vertretern des Bergbaus, des Tunnelbaus, der Zulieferindustrie, der Behörden und der Forschung geboten werden.

INTRODUCTION

www.aims.rwth-aachen.de

AACHEN NTERNATIONAL INING YMPOSIAI M S

Mining EquipmentBergbaumaschinen

Themengebiete

Wen Sie auf der Konferenz treffen

werden:

Vorstände, Geschäftsführer, Manager und Entscheidungsträger aus den Bereichen:

! Industrie

! Forschung

! Wirtschaft

! Vereinigungen und Verbände des Bergbaus

! öffentliche Verwaltung und Ministerien

! Medien

Programm im Überblick

Folgende Schwerpunkte werden behandelt:

! Automatisierung! Kommunikation! Infrastruktur

Weitere Themengebiete:! Einsatzerfahrungen! Produktivitätssteigerungen! Planung! Logistik und Maschinentechnik

Topics

Who you will meet at the Conference:

Board members, directors, managers and decision makers from:

Industry

Science

Economy

Mining Associations

Administration and Government

Media

Program at a Glance

Special emphasis is given to following topics:

! Automation! Communication! Infrastructure

Other topics dealt with are:! Operational Experiences! Productivity Increase! Operations Planning! Logistics and Machine Technology

!

!

!

!

!

!

INTRODUCTION

AACHEN NTERNATIONAL INING YMPOSIAI M S

Registration

Working Session

Break

Working Session

Break

Plenary Session

End

07.30 - 08.30

08.30 - 11.00

11.00 - 11.30

11.30 - 13.15

13.15 - 14.15

14.15 - 16.00

16.00 - 16.30

16.30 - 18.30

19.30

Registration

Plenary Session

Break

Working Session

Lunch

Working Session

Break

Working Session

Dinner Party

Wednesday, June 3 Thursday, June 4

08.30 - 09.00

09.00 - 10.40

10.40 - 11.10

11.10 - 12.45

12.45 - 13.15

13.15 - 15.15

15.15

www.aims.rwth-aachen.de

8.30

FO1

Mittagspause Lunch Break13.15

AACHEN NTERNATIONAL INING YMPOSIAI M S

Wednesday, June 3

Coffee BreakKaffeepause 11.00

FO1

Begrüßung und EinführungP.N. Martens, Institutsdirektor Institut für Bergbaukunde I, RWTH Aachen University, D

Entwicklung der Automatisierung im deutschen SteinkohlenbergbauJ. Eikhoff, Mitglied des Vorstands, RAG Deutsche Steinkohle AG, D

Integrative Planung von teilautomatisierten Bergwerken am Beispiel des Steinkohlebergwerks Banji, ChinaF. Becker, Geschäftsführer &B. Baus-Neufang, VP Sales Support, Becker Mining Systems AG, DE. Neye, RWTH Aachen University, Wiss. Mitarbeiterin, D

Steinkohlenbergbau in Südafrika - ein sich verändernder Markt für TeilschnittmaschinenT. Hürmann, Leiter Bergbautechnik Konstruktion,U. Lange, Produktmanager Continuous Miner, Eickhoff Bergbautechnik GmbH, D

Innovative HartgesteinsschneidtechnologieJ. Steinberg, Leiter Hard Rock Mining Systems &M. Müller, Executive Vice President - Global Engineering, Bucyrus DBT Europe GmbH, D

Die Kohlelogistikkette zwischen Gruben und Exporthäfen an der australischen Ostküste - Status Quo, derzeitige Engpässe und zukünftige EntwicklungenA. Rutherford, Director, Andrew Rutherford Pty. Ltd., AUSA.K. Bayer, Projektleiter & M. Rademacher, Senior Strategic Market Analyst, E.ON Kraftwerke GmbH, D

Ein neues Geschäftsmodell für Örterbau in IndienM. Rao, Chief General Manager Ramagundam I Area,The Singareni Collieries Company Limited (SCCL), INDS. Schmidt, Head of Engineering Combined Projects,Bucyrus DBT Europe GmbH, D

Datenübertragung in modernen Untertage-Bergwerken: Die Integrierung von stationärer und mobiler KommunikationM. Brinckman, Chief Sales Officer, Becker Mining Systems AG, D

Der Beitrag der Informations-, Kommuni-kationstechnik an der Produktivitätsstei-gerung im deutschen SteinkohlenbergbauJ. Skirde, Abteilungsleiter & U. Kimmit, Gruppenleiter, RAG Deutsche Steinkohle AG, D

Anwendung der RFID-Technologie zur Steigerung der Arbeitssicherheit beim StollenausbauK. Stankiewicz, Manager Depart. of Mechatronics Systems, D. Jenczmyk, Specialist for Designing,E. Pieczora, Deputy Director for Technical Development &J. Rogala, Designer - Laboratory of Mechatronics,KOMAG Institute of Mining Technology, PLM. Jaszczuk, Assistant Professor, Silesian University of Technology, PL

Welcome and IntroductionP.N. Martens, Head of the Institute of Mining Engineering I, RWTH Aachen University, GER

Progress of Automation in the German Deep Coal MiningJ. Eikhoff, Member of the Board Management, RAG Deutsche Steinkohle AG, GER

Integrated Planning of the Partially Automated Banji Coal Mine in ChinaF. Becker, Chief Executive &B. Baus-Neufang, VP Sales Support, Becker Mining Systems AG, GERE. Neye, RWTH Aachen University, Research Scientific, GER

Coal Mining in South Africa - A Changing Market for Continuous MinerT. Hürmann, Head of Design and Engineering &U. Lange, Product Manager Continuous Miner, Eickhoff Bergbautechnik GmbH, GER

Innovative Hard Rock Cutting TechnologyJ. Steinberg, Head of Hard Rock Mining Systems &M. Müller, Executive Vice President - Global Engineering, Bucyrus DBT Europe GmbH, GER

The Australian East Coast Coal Supply Chain - Status Quo, Current Bottlenecks and Future DevelopmentsA. Rutherford, Director, Andrew Rutherford Pty. Ltd., AUSA.K. Bayer, Project Manager & M. Rademacher, Senior Strategic Market Analyst,E.ON Kraftwerke GmbH, GER

A new Business Model for Room & Pillar Operations in IndiaM. Rao, Chief General Manager Ramagundam I Area,The Singareni Collieries Company Limited (SCCL), INDS. Schmidt, Head of Engineering Combined Projects,Bucyrus DBT Europe GmbH, GER

Integration of fixed & mobile Communication Backbones in modern Underground MinesM. Brinckman, Chief Sales Officer, Becker Mining Systems AG, GER

The Contribution of Information and Com-munication Technology to the Increase in Productivity in German Deep Coal MiningJ. Skirde, Head of Department & U. Kimmit, Planing Engineer, RAG Deutsche Steinkohle AG, GER

Use of RFID Technology to Increase Operational Safety of Powered Roof SupportsK. Stankiewicz, Manager Depart. of Mechatronics Systems, D. Jenczmyk, Specialist for Designing,E. Pieczora, Deputy Director for Technical Development &J. Rogala, Designer - Laboratory of Mechatronics, KOMAG Institute of Mining Technology, PLM. Jaszczuk, Assistant Professor, Silesian University of Technology, PL

11.30

CO

MM

UN

ICA

TIO

N &

MA

NA

GE

ME

NT

Wednesday, June 3

FO2FO2

AACHEN NTERNATIONAL INING YMPOSIAI M S

Mittagspause Lunch Break

Coffee BreakKaffeepause

13.15

11.00

11.30Hochleistungen von Hydraulikbaggern im TagebauW. Rechenberg, Product Manager, Komatsu Mining Germany GmbH, D

Planung von EndböschungsbergbauP.-J. Kleiterp, Mining Engineer, Terex Mining, NL

Ein neuer Ansatz zur Bestimmung des optimalen Übergangspunktes von Tagebau zum untertägigen Bergbau am Beispiel der Eisengrube in Chah-Gaz, IranB. Farshadi, Project Manager &A. Shivaea, Project Manager, Kavoshgaran Consulting Engineers (KCE), IR

Übergang vom Hangabbau zum Untertageabbau in IndonesienT. Sasaoka, Assistant Professor, H. Shimada, Associate Professor &K. Matsui, Professor, Kyushu University, J

High Performance of Hydraulic Mining Shovels in Open Cast MiningW. Rechenberg, Product Manager, Komatsu Mining Germany GmbH, GER

Planning of Highwall Mining OperationsP.-J. Kleiterp, Mining Engineer,Terex Mining, NL

A New Approach to Optimization of Surface / Underground Mining Limit in Chah-Gaz Iron MinesB. Farshadi, Project Manager &A. Shivaea, Project Manager, Kavoshgaran Consulting Engineers (KCE), IR

Development of Underground Coal Mine from Open Cut Highwall in IndonesiaT. Sasaoka, Assistant Professor,H. Shimada, Associate Professor &K. Matsui, Professor, Kyushu University, J

OP

EN

PIT

FO1 FO1

Wednesday, June 3

Unterstützung der Betriebsabläufe von Hochleistungsbetrieben im Steinkohlenbergbau durch den Einsatz von 3D Laser ScanningN. Benecke, Berater für Geomessleistungen &R. Kuchenbecker, Gruppenleiter GeodatenprozessierungDMT GmbH & Co. KG, DJ. Bock, Leiter der Markscheiderei BW Prosper Haniel &O. Uhl, Leiter Altbergbau / Wasserhaltung, RAG Deutsche Steinkohle AG, D

Integriertes System zur Kontrolle und Visualisierung von StrebmechanisierungssystemenA. Koziel, Deputy Director for Research Development, K. Stankiewicz, Head of Mechatronics, J. Rogala, Designer - Laboratory of Mechatronics &D. Jasiulek, Head of Laboratory of Mechatronics, KOMAG Institute of Mining Technology, PLM. Jaszczuk, Assistant Professor, Silesian University of Technology, PL

MineView - Webbasiertes 3D-Infrastruktur- und Informationsmanagement für den BergbauD. Buttgereit, Technischer Geschäftsführer, XGraphic Ingenieurgesellschaft mbH, GERR. Hünefeld, Akademischer Oberrat, RWTH Aachen University, D

Manufacturing Execution System (MES) - Der Schlüssel zu mehr Effizienz im Bergbau?K.-H. Gerlach, Senior Manager Mining Technologies, Siemens AG, D

Abendveranstaltung Dinner Party19.30

AACHEN NTERNATIONAL INING YMPOSIAI M S

14.15

Effiziente Prozesse in der Produktion der RAG als Ergebnis von Lean Processing und AutomationB. Langhanki, Betriebsdirektor Produktion &W. König, Abteilungsleiter, RAG Deutsche Steinkohle AG, D

Automation von Bergbaumaschinen bei der RAG AktiengesellschaftU. Barabasch, Bereichsleiter Instandhaltung,H.-J. Weiß, Bereichsleiter Instandhaltung &F. Kotke, Sachbearbeiter für Energietechnik,RAG Deutsche Steinkohle AG, D

Automatisierung von Bergwerksprozessen bei der RAG AktiengesellschaftU. Müller, Abteilungsleiter &K.-J. Reinewardt, Betriebsdirektor Produktion, RAG Deutsche Steinkohle AG, D

Automatisierung und Kommunikation im Bereich Logistik unter Tage - Prozesse und Technik -

R. Ball, Bereichsleiter Logistik, BW Auguste Victoria &T. Gießelmann, Bereichsleiter Bergtechnik, RAG Deutsche Steinkohle AG, D

Efficient Production Processes of the RAG Deutsche Steinkohle as a Result of Lean Processing and AutomationB. Langhanki, Director Operation &W. König, Head of Department, RAG Deutsche Steinkohle AG, GER

Automation of Mining Machinery at RAG AktiengesellschaftU. Barabasch, Senior Maintenance Engineer,H.-J. Weiß, Manager Maintenance & F. Kotke, Technical Manager for Electrical Engineering,RAG Deutsche Steinkohle AG, GER

Automation of Mining Processes at RAG AktiengesellschaftU. Müller, Head of Department &K.-J. Reinewardt, Director Operation, RAG Deutsche Steinkohle AG, GER

Automation and Communication in the Underground Logistics Area - Processes and Technology -R. Ball, Senior Mining Engineer Logistic, Auguste Victoria Coal Mine &T. Gießelmann, Head of Department Mine Services, RAG Deutsche Steinkohle AG, GER

Support of High-Performance Operations in Coal Mining by Use of 3D Laser ScanningN. Benecke, Consultant for Geosurvey and Monitoring &R. Kuchenbecker, Head of geo-data Processing Group, DMT GmbH & Co. KG, GERJ. Bock, Head Mine Surveying Dept. Prosper-Haniel Mine &O. Uhl, Head Dept. Abandoned Mines & Mine Water,RAG Deutsche Steinkohle AG, GER

Integrated System for Control and Visualization of Longwall Mechanization SystemA. Koziel, Deputy Director for Research Development,K. Stankiewicz, Head of Mechatronics, J. Rogala, Designer - Laboratory of Mechatronics &D. Jasiulek, Head of Laboratory of Mechatronics, KOMAG Institute of Mining Technology, PLM. Jaszczuk, Assistant Professor,Silesian University of Technology, PL

MineView - Web Based Infrastructure und Information Management for MiningD. Buttgereit, Chief Technical Officer, XGraphic Ingenieurgesellschaft mbH, GERR. Hünefeld, Senior Academic Advisor, RWTH Aachen University, GER

Manufacturing Execution System (MES) - Key for more Efficiency in Mining Operations?K.-H. Gerlach, Senior Manager Mining Technologies, Siemens AG, GER

18.30 EndEnde

CO

MM

UN

ICA

TIO

N &

MA

NA

GE

ME

NT

AU

TO

MA

TIO

N

16.00Kaffeepause Coffee Break

16.30

Wednesday, June 3

Abendveranstaltung Dinner Party

FO2 FO2

AACHEN NTERNATIONAL INING YMPOSIAI M S

EndEnde

Ein neuartiges Gebirgsankerungskonzept für Untertagebauwerke unter hohen SpannungszuständenE. Neugebauer, Produktmanager Felssicherungstechnik, Atlas Copco MAI GmbH, A

Schildausbau unter dem Auftreten von Erschütterungen der Gesteinsmassen im polnischen BergbauS. Rajwa, Abteilung Abbauverfahren und Ausbau, W. Masny, Abteilung Abbauverfahren und Ausbau, S. Prusek, Leiter Abteilung für Abbauverfahren und Ausbau, Central Mining Institute, PL

Produktivitätssteigerung durch innovativen LeitungsaufbauM. Jansen, Geschäftsführer &P. Funken, Leiter Entwicklung und Anwendungstechnik, Draka Industrial Cable GmbH, D

Untersuchung der Abtragungseffizienz von Sammelwalzenladern im Çayirhan Kohlebergwerk, Ankara, TürkeiN. Bilim, Research Assistant &I. Ozkan, Research Assistant, Selçuk University, TR

A New Rock Bolting Concept for Underground Excavations under High Stress ConditionsE. Neugebauer, Product Manager Ground Engineering, Atlas Copco MAI GmbH, A

Powered Support in Conditions of Rock Mass Tremor Occurrence in the Polish Coal Mining IndustryS. Rajwa, Dept. Extraction Technologies & Mining Support, W. Masny, Dept. Extraction Technologies & Mining Support,S. Prusek, Head Dept. Extraction Techn. & Mining Support, Central Mining Institute, PL

Increased Productivity thanks to Innovative Cable ConstructionM. Jansen, Sales Manager Mining & Tunneling &P. Funken, Head of R&D, Draka Industrial Cable GmbH, GER

A Model to predict the Performance of Drum Shearers in Coal Mine: An Example from a Çayirhan Lignite Mine, Ankara, Central TurkeyN. Bilim, Research Assistant &I. Ozkan, Research Assistant, Selçuk University, TR

Erfahrungsbericht zum Einsatz von Verpressschläuchen zur Abdichtung von Wasserdämmen auf dem Bergwerk LippeD. Opitz, Projektleiter, Zerna Ingenieure GmbH, DJ. Tuschmann, Oberbergrat, Bezirksregierung Arnsberg, D

Erhöhung der Betriebssicherheiten durch Auswahl geeigneter Bergbauketten mittels SchlagzerreißversuchenG. Philipp, Geschäftsführer &R. Kandzia, Vertriebsleitung Fördertechnik, Thiele GmbH & Co. KG, DA. Pytlik, Leiter Forschung Mechanische Anlagen &M. Szot, Leiter Labor Seile und Schachtfördermaschinen, Glówny Instytut Górnictwa, PL

Ein neues betriebsreifes System zur Glimmbrandfrüherkennung an GurtförderanlagenJ. Wick, Oberbergrat, Bezirksregierung Arnsberg, DW. Bernick, Abteilungsleiter & T. Misz, Abteilungsleiter, RAG Deutsche Steinkohle AG, DB. Vogel, Leiter Marketing & Technologie, GESO GmbH, D

Neues Modell eines Steinkohlebergbaus mit elektro-mechanischen Verteilerzentralen - Bessere Kontrolle der Walzenlader und der Beförderung von FörderkohleJ. Antoniak, Professor, Faculty of Mining and Geology, Silesian University of Technology, PL

Programm 2010 zur Optimierung der Produktivität der OKD Kohlenbergwerke in der Tschechischen RepublikR. Pavlik, Chief Project Manager, OKD a.s., CZK. O´Neil, Bucyrus America, Inc., USA

Experience Report about Using of Injection Hose Systems for Sealing of Subsurface Water Dams at Lippe Coal MineD. Opitz, Project Manager, Zerna Ingenieure GmbH, GERJ. Tuschmann, Inspector of Mines, Bezirksregierung Arnsberg, GER

Increasing Operational Reliability by Selecting Suitable Mining Chains Using Tensile Impact TestsG. Philipp, Managing Director &R. Kandzia, Marketing Director Conveying Systems, Thiele GmbH & Co. KG, GERA. Pytlik, Head Mechanical Research Establishment &M. Szot, Head Rope and Shaft-Winder Testing Laboratory , Glówny Instytut Górnictwa, PL

A New Proved Field-Tested System for Early Detection of Smouldering Fire at Conveyor Belt Equipment in Deep Coal MinesJ. Wick, Inspector of Mines, Bezirksregierung Arnsberg, GERW. Bernick, Head of Department & T. Misz, Head Department,RAG Deutsche Steinkohle AG, GERB. Vogel, Head of Marketing & Technology, GESO GmbH, GER

New Model of Colliery with Power-Mechanical Mine Control Rooms – Better Control of Longwall Shearer Operation and of Run-of-Mine HaulageJ. Antoniak, Professor, Faculty of Mining and Geology, Silesian University of Technology, PL

Productivity Optimization Program 2010 at the OKD Coal Mines in the Czech RepublicR. Pavlik, OKD a.s., Chief Project Manager, CZK. O´Neil, Bucyrus America, Inc., USA

EQ

UIP

ME

NT

EQ

UIP

ME

NT

Kaffeepause Coffee Break

19.30

18.30

16.00

16.30

14.15

FO1 FO1

11.10

Thursday, June 4

10.40Kaffeepause Coffee Break

AACHEN NTERNATIONAL INING YMPOSIAI M S

12.45Mittagessen Lunch

9.15Ein Auftragnehmer-basiertes System für eine dynamische rahmenorientierte BergbauplanungN.M. Ioannidis, Research Associate &I.K. Kapageridis, Assistant Professor,Technological Education Institute of Western Macedonia, GR

Anlagennahes Asset Management im BergbauJ. Arloth, Teamleader Sales zedas®asset, PC-Soft GmbH, D

Maßnahmen zur Bergevermeidung durch Reduzierung des Liegendschnittes in Abbaubetrieben mit schneidender Gewinnung auf den Bergwerken Lippe und Auguste Victoria der RAG AktiengesellschaftJ. Kroker, Betriebsdirektor Produktion, D. Rosinski, Bereichsleiter Abbau BW Lippe &T. Telsemeyer, Bereichsleiter Abbau BW Auguste Victoria,RAG Deutsche Steinkohle AG, D

Walzenlader Automation und Kommunikation - Ein Leitfaden zum automatisierten WalzenladerB. Hackelbörger, Leiter Elektrik- und Elektronik-Entwicklung, Eickhoff Bergbautechnik GmbH, DK. Nienhaus, Institutsleitung &F. Mavroudis, Wissenschaftliche Mitarbeiterin, RWTH Aachen University, D

Führungssysteme für Tiefbau und BergbaumaschinenN. Clarke-Hackston, International Sales Manager &J. Belz, Entwicklung,VMT GmbH, D

Atlas Copco´s LHD Automatisierungssystem für schnelles autonomes Laden und Fördern zur Steigerung der Arbeitssicherheit, Produktivität und Qualitätskontrolle im untertägigen BergbauO. Tryggvesson, Product Manager Automation LHD Products, M. Krasser, Chief Engineer LHD Automation, R&D Automation &C. Swart, Product Line Manager - Automation Systems URE, Atlas Copco Rock Drills AB, S

Automatisierung von Strebbau - Eine Methode für hoch integrierte automatisierte StrebbetriebeS. Mundry, Vice President - Innovation Center Europe &H. Weßelmann, Head of Engineering Center - Automation - Longwall Division, Bucyrus DBT Europe GmbH, D

Shearer Loader Automation and Communication - A Guide to the Autonomous Shearer LoaderB. Hackelbörger, Head of Electric & Electronic Developments, Eickhoff Bergbautechnik GmbH, GERK. Nienhaus, Head of Department &F. Mavroudis, Scientific Assistant, RWTH Aachen University, GER

Guidance Systems for Underground Construction and Mining MachinesN. Clarke-Hackston, International Sales Manager & J. Belz, Development Engineer,VMT GmbH, GER

Atlas Copco's LHD Automation System for High-Speed Autonomous Loading and Hauling for Increased Operator Safety, Productivity and Quality Control in Underground Mining ApplicationO. Tryggvesson, Product Manager Automation LHD Products, M. Krasser, Chief Engineer LHD Automation, R&D Automation &C. Swart, Product Line Manager - Automation Systems URE, Atlas Copco Rock Drills AB, S

Longwall Mining Automation: A Method for highly integrated Automated Longwall SystemsS. Mundry, Vice President - Innovation Center Europe &H. Weßelmann, Head of Engineering Center - Automation - Longwall Division, Bucyrus DBT Europe GmbH, GER

An Agent-Based System Framework for Dynamic Mine SchedulingN.M. Ioannidis, Research Associate &I.K. Kapageridis, Assistant Professor,Technological Education Institute of Western Macedonia, GR

Plant Asset Management in Mining ProcessesJ. Arloth, Teamleader Sales zedas®asset, PC-Soft GmbH, GER

Measures for the Prevention of Mine Waste by reducing the Prostrate Cut in Extraction Operations with Cutting Extraction in the Lippe and Auguste Victoria Mines of the RAG AktiengesellschaftJ. Kroker, Director Operation, D. Rosinski, Senior Mining Engineer Lonwall Lippe Coal Mine T. Telsemeyer, Senior Mining Engineer Longwall Auguste Victoria Coal Mine, RAG Deutsche Steinkohle AG, GER

CO

MM

UN

ICA

TIO

N &

MA

NA

GE

ME

NT

AU

TO

MA

TIO

N

FO1 FO1

15.15Ende End

13.15

Thursday, June 4

Quality Assessment of Development Cycle with Drilling and BlastingS. Kenzap, Senior Engineer / Mining & Mineral Processing,Hatch Limited, CANV.N. Kazakidis, Associate Professor, Laurentian University, CAN

ANV Group Experience of Operation of BelAZ Mine Dump Trucks in Russian Open-Pit MinesS. Muravyev, Technical Director, ANV Group Ltd. , RUS

From Shendong to Bowen Basin - Longwall Shearer for Thick Seam MiningU. Marewski, Director Sales, Eickhoff Bergbautechnik GmbH, GER

Development of Block Caving Mines with Mechanized ExcavationC. Frenzel, Manager Mining Applications, Herrenknecht AG, GERR. Randaxhe, Research Scientist, RWTH Aachen University, GER

Next Generation Longwall Face Conveyor SystemsU. Paschedag, Senior Vice President & Head of Longwall Division, Bucyrus DBT Europe GmbH, GER

Closing RemarksP.N. Martens, Head of the Institute of Mining Engineering I, RWTH Aachen University, GER

Qualitätsbewertung in SprengvortriebenS. Kenzap, Senior Engineer / Mining & Mineral Processing, Hatch Limited, CANV.N. Kazakidis, Associate Professor,Laurentian University, CAN

Erfahrungen der ANV Group beim Einsatz von BELAZ Schwerlast-Trucks im russischen KohlentagebauS. Muravyev, Technical Director,ANV Group Ltd. , RUS

Von Shengdong nach Bowen Basin - Der Einsatz von Walzenladern in dicken FlözenU. Marewski, Leiter Vertrieb, Eickhoff Bergbautechnik GmbH, D

Streckenauffahrung in Blockbruchbau-bergwerken mittels VollschnittmaschinenC. Frenzel, Manager Bergbauanwendungen, Herrenknecht AG, DR. Randaxhe, Wissenschaftlicher Mitarbeiter, RWTH Aachen University, D

Die nächste Generation von Abbaufördersystemen im StrebbauU. Paschedag, Senior Vice President & Head of Longwall Division, Bucyrus DBT Europe GmbH, D

SchlussworteP.N. Martens, Institutsdirektor RWTH Aachen University, D

Institut für Bergbaukunde I,

AACHEN NTERNATIONAL INING YMPOSIAI M S

NOTES

www.aims.rwth-aachen.de

AACHEN NTERNATIONAL INING YMPOSIAI M S

The Institute of Mining

Engineering I

looks forward to seeing you on rd

June 3 , 2009

at 8:00 p.m.

at our dinner party

at the historic

“Aula Carolina“.

The “warm-up“ starts

at 7:30 p.m.

Das Institut für

Bergbaukunde I

freut sich sehr, Sie

am 3. Juni 2009

um 20 Uhr

zu unserer Dinner-Party

in der historischen

„Aula Carolina“

begrüßen zu dürfen.

Das „Warm-Up“ beginnt

um 19:30 Uhr

rd,June 3 2009

Aula CarolinaPontstr. 7-9

sponsored by

Tagungsort

Kármán-Auditorium der RWTH Aachen,

Eilfschornsteinstraße 15, 52056 Aachen

Hörsäle: FO1 und FO2

Kontakt

Institut für Bergbaukunde I

Tagungssekretariat

RWTH Aachen

Wüllnerstraße 2

52062 Aachen

Tel.: +49-(0)241-80 95673

Fax: +49 (0)241-80 92272

E-Mail: [email protected]

Internetseite

http://www.aims.rwth-aachen.de

Einladungen

Eine offizielle Einladung erhält jeder Teilnehmer auf Anfrage. Die Einladung soll den Teilnehmer unterstützen, Zuschüsse für Reise- und Tagungskosten zu beantragen oder ein Visum zu erhalten.

Mit der Einladung verpflichtet sich der Organi-sator zu keiner finanziellen Unterstützung.

Ihre Anfrage für eine offizielle Einladung schicken Sie bitte an das Tagungssekretariat.

Tagungssprachen

Deutsch und Englisch

Simultanübersetzung:

Vision Media Systems GmbH

Jagenbergstraße 13b, 41468 Neuss

Versicherung und Haftung

Die Teilnehmer, Aussteller und Begleitpersonen werden gebeten, sich angemessen zu versichern.

Abendveranstaltung

Aula Carolina, Pontstr. 7-9, 52056 Aachen

am 3. Juni 2009

Das "Warm-Up" beginnt um 19.30 Uhr

Venue

Kármán-Auditorium of the RWTH Aachen University,

Eilfschornsteinstraße 15, 52056 Aachen

Lecture halls: FO1 and FO2

Contact Details

Institute of Mining Engineering I

Symposium Secretariat

RWTH Aachen University

Wuellnerstrasse 2

52062 Aachen, Germany

Tel.: +49-(0)241-80 95673

Fax: +49 (0)241-80 92272

e-mail: [email protected]

Symposium´s Web Site

http://www.aims.rwth-aachen.de

Letters of Invitation

An official letter of invitation will be sent to each participant upon request. Such an invitation is intended to help potential attendees raise funds for travel and registration fee or obtain a visa.

Letters of invitation do not represent a commitment to provide any financial support.

Requests for letters should be sent to the symposium secretariat.

Conference Languages

German and English

Simultaneous Translation Service:

Vision Media Systems GmbH

Jagenbergstraße 13b, 41468 Neuss

Insurance and Liability

It is the responsibility of participants, exhibitors and accompanying persons to be properly and adequately insured.

Dinner Party

Aula Carolina, Pontstr. 7-9, 52056 Aachenrdon June 3 , 2009

The "warm-up" starts at 7.30 p.m.

GENERAL INFORMATION

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

Registration

Those who wish to attend the symposium can register online at the website at www.aims.rwth-aachen.de.

It is also possible to complete the enclosed registration form and return it by mail, fax or e-mail to the symposium secretariat.

A confirmation of registration including the necessary payment details will be sent to you upon registration by mail, fax or e-mail.

Please note that for technical reasons it is not possible to pay by credit card. It is ONLY possible to pay by bank transfer, cheque or in cash at the conference table.

Registration Fee

Participants:thbefore May14 , 2009: 385 EURO

thafter May14 , 2009: 425 EURO

Mining Authorities: 160 EURO

Students: 55 EURO

Presenting Authors: free participation

(one author per paper)

Including:

! Symposium Materials and Proceedings

! Attendee List

! Simultaneous Translation

! Refreshments and Lunch

! Dinner Party at the Aula Carolina

rdRegistration on June 3 , 2009

Registration on the first day of the event is possible at the conference office.

Upon payment of the registration fee (by cheque or cash) you will be issued a receipt.

Cancellation

Cancellations must be sent to us in writing by mail, fax or e-mail.

thFor cancellations received before May 14 , 2009 no participation fee will be charged.

No refunds will be issued after this date; however, it is possible to send a substitute delegate.

REGISTRATION INFORMATION

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

Anmeldung

Sie können sich online auf der Homepage www.aims.rwth-aachen.de anmelden.

Es ist ebenfalls möglich, sich mit der beigefügten Rückantwort anzumelden und diese per Post, Fax, oder E-Mail an das Tagungssekretariat zu schicken.

Eine Anmeldebestätigung mit Hinweisen zur Zahlung des Teilnahmebeitrages und zur Bankverbindung erhalten Sie nach Eingang der Anmeldung per Post, Fax oder E-Mail.

Aus technischen Gründen ist es leider nicht möglich, mit Kreditkarte zu bezahlen. Zahlungen können NUR per Banktransfer, Scheckeingang oder bar im Tagungs-sekretariat entgegen genommen werden.

Tagungsgebühr

Teilnehmer:

bis 14. Mai 2009: 385 EURO

nach 14. Mai 2009: 425 EURO

Bergbaubehörden: 160 EURO

Studenten: 55 EURO

Vortragende: freie Teilnahme

´ (ein Vortragender pro Vortrag)

Inklusive:

! Tagungsmaterial und Tagungsband

! Teilnehmerverzeichnis

! Simultanübersetzung

! Erfrischungen und Mittagessen

! Abendveranstaltung in der Aula Carolina

Anmeldung am 3. Juni 2009

Eine Anmeldung am ersten Tag des Kolloquiums ist im Tagungsbüro möglich.

Dort erhalten Sie gegen Bezahlung der Tagungsgebühr (Scheck oder bar) eine unterschriebene Quittung.

Stornierung

Eine Stornierung ist nur schriftlich per Post, Fax oder E-Mail möglich.

Bei Stornierungen bis zum 14. Mai 2009 werden keine Anmeldegebühren erhoben. Danach wird die volle Tagungsgebühr fällig.

Im Falle einer Verhinderung ist es möglich, einen Ersatz-Teilnehmer zu nennen.

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

Hotel

Classification

Single Room

(per night)

Double Room

(per night)

Aquis Grana Cityhotel

Buechel 32 / Buchkremerstrasse 52016 Aachen Tel.: +49-(0)241-443 0 Fax: +49-(0)241-443 137 e-mail: reservations@hotel-

aquisgrana.com http://www.hotel-aquisgrana.com

*** Superior

Euro 105

Euro 120

***

Mercure Hotel Aachen Am Dom

Peterstrasse 1 52062 Aachen Tel.: +49-(0)241-1801 0 Fax: +49-(0)241-1801 100 e-mail: [email protected] http://www.mercure.com

Euro 95

Euro 148

Hotel Benelux

Franzstrasse 21-23 52064 Aachen Tel.: +49-(0)241-400 03 0 Fax: +49-(0)241-400 03 500 e-mail: [email protected] http://www.hotel-benelux.de

***

Euro 95

Euro 110

Hotel Lousberg

Saarstrasse 108 52062 Aachen Tel.: +49-(0)241-203 31/2 Fax: +49-(0)241-220 47 e-mail: [email protected] http://www.concordehotel-lousberg.de

**

Euro 75

Euro 98

HOTEL INFORMATION

ACCOMMODATION INFORMATION

Übernachtung

Begrenzte Zimmerkontingente stehen für die Zeit vom 2. - 4. Juni 2009 in den genannten Hotels zur Verfügung. Alle Zimmerpreise beinhalten Frühstück.

Hotelreservierung

Es gibt 3 Möglichkeiten, um ein Hotelzimmer zu reservieren:

1. Sie können ein Hotelzimmer reservieren, indem Sie direkt in KONTAKT MIT DEM HOTEL treten.

Bitte verwenden Sie bei der Reservierung das Stichwort "AIMS 2009".

2. Sie können ein Hotelzimmer reservieren, indem Sie ONLINE unter www.aims.rwth-aachen.de buchen

Wenn Sie die Online-Reservierung nutzen, erhalten Sie nach erfolgter Eingabe der benötigten Daten eine Bestätigungsemail. Dies kann bis zu 15 Minuten dauern.

Wir werden Ihre Reservierung umgehend weiterleiten und eine Bestätigung der Hotelreservierung wird Ihnen zugesandt.

3. Sie können ein Hotelzimmer reservieren, indem Sie das RÜCKANTWORT-FORMULAR per Post, Fax oder E-Mail an das Tagungssekretariat schicken.

Wir werden Ihre Reservierung umgehend weiterleiten und eine Bestätigung der Hotelreservierung wird Ihnen zugesandt.

Bitte reservieren Sie rechtzeitig, da die Zimmer begrenzt sind und nach dem 20. April 2009 nicht mehr garantiert werden können.

Zahlungsmöglichkeiten

Die Hotelgebühr wird an der Rezeption Ihres Hotels per Kreditkarte, Scheck oder Überweisung bezahlt.

Bitte informieren Sie sich bei Ihrem Hotel.

Stornierung

Bitte informieren Sie das Tagungssekretariat, falls eine Stornierung notwendig ist.

Bei Stornierung bis zum 30. April 2009 werden keine weiteren Gebühren vom Hotel erhoben.

Danach wird die volle Hotelgebühr fällig.

Accommodation

Blocks of rooms have been reserved at the named hotels for the symposium period, June 2 - 4, 2009. All rates include breakfast and local tax.

Hotel Reservation

There are 3 possibilities to make a hotel reservation:

1. You can book a hotel room by getting directly in CONTACT TO THE HOTEL.

By using the direct contact to the hotel please use the Keyword "AIMS 2009”.

2. You can book a hotel room by using the ONLINE REGISTRATION at www.aims.rwth-aachen.de

By using the Online-Registration you will receive an e-mail after successfully completing the room registration form containing the data you have provided. This can take up to 15 minutes.

We will forward your room reservation and a confirmation will be sent to you directly.

3. You can reserve a hotel room by entering data into the REGISTRATION FORM.

By using the Registration Form please mail, fax or e-mail your room reservation form to the conference secretariat.

We will forward your room reservation and a confirmation will be sent to you directly.

Rooms are limited so you are encouraged to book early, as rates and accommodation

thcannot be guaranteed after April 20 , 2009.

Methods of Payment

Please pay the hotel fee at the reception desk of your hotel by credit card, bank cheque or wire transfer.

Please keep in touch with your hotel.

Cancellation

In the unfortunate case that a reservation must be cancelled, please inform the symposium secretariat.

For cancellations received before thApril 30 , 2009 no hotel fees will be charged

by the hotel.

No refunds will be issued after this date.

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

TRAVEL INFORMATION

Reiseinformation

...mit dem Flugzeug

Flughafen Maastricht-Aachen (NL), Tel.: +31-(0)43-358 9999http://www.maa.nl

Flughafen Lüttich (B), 60 kmTel.: +32-(0)4 234 84 11Http://www.liegeairport.com

Flughafen Köln/Bonn (D), 85 kmTel.: +49-(0)2203-40 40 01http://www.airport-cgn.de

Flughafen Düsseldorf (D), 90 kmTel.: +49-(0)211-421 0http://www.duesseldorf-international.de

Flughafen Brüssel (B), 143 kmTel.: +32-(0)2 753 77 53http://www.brusselsairport.be

Flughafen Weeze (D), 144 km

Tel.: +49-(0)28 37-66 61 11http://www.flughafen-niederrhein.de

...mit dem Zug

In Aachen existieren zwei Bahnstationen:Aachen Hauptbahnhof und Aachen West

Aachen ist an das internationale Schienennetz angebunden. Im zweistündigen Takt fährt der Hochgeschwindigkeitszug THALYS zwischen Paris und Köln über Aachen. Dazu verkehren ICE-Züge von Frankfurt nach Brüssel über Aachen.

Es bestehen direkte Verbindungen zu den Städten Köln, Düsseldorf, Dortmund, Siegen, Frankfurt/Main und Hamm.

An das niederländische Schienennetz ist Aachen mit einer stündlichen Verbindung nach Heerlen angeschlossen.

Information:Deutsche Bahn AGTel: 0180 - 5 99 66 33 (14 ct/Min.)

35 km

http://www.bahn.de

Travel Information

...by plane

Maastricht-Aachen Airport (NL), 35 kmTel.: +31-(0)43-358 9999http://www.maa.nl

Liege Airport (B), 60 kmTel.: +32-(0)4 234 84 11Http://www.liegeairport.com

Cologne/Bonn Airport (GER), 85 kmTel.: +49-(0)2203-40 40 01http://www.airport-cgn.de

Düsseldorf Airport (GER), 90 kmTel.: +49-(0)211-421 0http://www.duesseldorf-international.de

Brussels Airport (B), 143 kmTel.: +32-(0)2 753 77 53http://www.brusselsairport.be

Airport Weeze (GER), 144 km

Tel.: +49-(0)28 37-66 61 11http://www.flughafen-niederrhein.de

...by train

There are two train stations in Aachen: Aachen Hauptbahnhof and Aachen West

Aachen is linked to the international railway network. Every two hours, the high-speed train THALYS operates via Aachen between Paris and Cologne. ICE trains run from Frankfurt to Brussels via Aachen as well.

There are direct connections to the cities of Cologne, Düsseldorf, Dortmund, Siegen Frankfurt/Main and Hamm.

An hourly connection to Heerlen links Aachen to the Dutch railway system.

Information: Deutsche Bahn AGPhone: + 49 1805 - 99 66 33 (14 ct./minute)http://www.bahn.de

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

TRAVEL INFORMATION

...mit dem Auto

Aachen ist über folgende Autobahnen zu

erreichen:

E 314 Antwerpen-Hasselt-Heerlen-Aachen

E 40 (London)-Brüssel-Lüttich-Aachen

A 4 Olpe-Köln-Aachen

A 44/A46 Düsseldorf-Neuss-Aachen

Passkontrolle und Visum

Die Anforderungen an den Reisepass und das Visum sind von Land zu Land unterschiedlich.

Bitte informieren Sie sich bei einem Reisebüro oder der deutschen Botschaft in Ihrem Land.

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

...by car

Aachen is conveniently located with regard to

transport facilities in the direction of Brussels,

Paris and Antwerp:

E 314 Antwerp-Hasselt-Heerlen-Aachen

E 40 (London)-Brussels-Liege-Aachen

A 4 Olpe-Cologne-Aachen

A 44/A46 Düsseldorf-Neuss-Aachen

Passport and Visa

Passport and Visa requirements vary by Country.

Please contact your travel agent or the German Consulate/Embassy in your country for advice.

ADVERTISEMENT INFORMATION

Anzeige im Tagungsband

In Verbindung mit dem Kolloquium bieten wir an, eine Anzeige im Tagungsband zu schalten. Das Schalten einer Anzeige im Tagungsband beinhaltet die Möglichkeit, die Firma während des Kolloquiums kostenfrei bei der Ausstellung zu präsentieren (siehe „Exhibition Information“).

Der Tagungsband erscheint in der Reihe „Aachen International Mining Symposia“ in einer Auflage von 500 Exemplaren und umfasst voraussichtlich rund 800 Seiten.

Technische Daten

Anzeigenformat:

167 mm Breite x 240 mm Höhe - beschnitten

173 mm Breite x 246 mm Höhe - unbeschnitten

Platzierung:

Die Platzierung der Anzeige erfolgt rechtsseitig.

Preis pro Anzeige (farbig oder schwarz/weiß):

600 EURO (zzgl. MwSt)

Dateiformate:

PDF, EPS, JPG, TIF und Dateien aus gängigen Grafik-/Layoutprogrammen.

Auflösung: 300 dpi

Druckvorlagen-Übermittlung:

per E-Mail oder CD per Post

Einsendeschluss: 15. März 2009

Sollten Sie an unserem Angebot interessiert sein, bitten wir Sie, die beigefügte Rückantwort bis zum 15. März 2009 an uns per Post, Fax oder E-mail zurück zu schicken.

Die Rechnung für die Anzeige wird Ihnen nach Veröffentlichung des Tagungsbandes zugesandt.

Advertising in the Proceedings

In conjunction with the symposium we offer the opportunity to advertise in the proceedings and to present your company in an exhibition without any further costs (see “Exhibition Information”).

The proceedings will be published in the "Aachen International Mining Symposia” with an edition of 500 copies in one volume with approximately 800 pages, including figures and tables.

Technichal Requirements

Format of the Advertisement:

167 mm width x 240 mm height - Trim Size

173 mm width x 246 mm height - Bleed Size

Placing:

The advertisements will be inserted right-sided.

Costs (coloured or positive black):

600 EURO (plus VAT)

The invoice for the advertisement will be sent to you after publishing in the proceedings.

File Format:

PDF, EPS, JPG, TIF and current Graphic Programs.

Resolution: 300 dpi

Artwork-Transmission:

e-mail or CD via mail

thDeadline: March 15 , 2009

Those who wish to advertise in the proceedings and/or to attend at the exhibition should complete the enclosed reply form for exhibitors and return it to us until

thMarch 15 , 2009 by mail, fax or e-mail.

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

EXHIBITION INFORMATION

Ausstellung

Die Ausstellungsfläche ist in dem Pausenbereich integriert, so dass die Aussteller ausgezeichnete Möglichkeiten haben, sich mit den Teilnehmern und Vortragenden zu treffen und auszutauschen.Die traditionelle Abendveranstaltung bietet in geselliger Atmosphäre Gelegenheit zu weiteren Gesprächen mit Kunden und Fachkollegen.

Leistungspaket Ausstellung

Die Standgebühr für Aussteller, die eine Anzeige im Tagungsband geschalten haben, ist kostenfrei.

Sollten Sie nicht daran interessiert sein, im Tagungsband zu inserieren, bieten wir Ihnen die Möglichkeit an, die Firma für 250 € pro Meter Standfläche auf dem Kolloquium zu präsentieren (Mindeststandfläche 2 Meter).

Folgende Leistungen beinhaltet das Leistungspaket „Ausstellung“ für eine Person Ihres Hauses:

Ausstellungsfläche je nach Bedarf 1-3 Meter inkl. 1 Tisch und 2 Stühle und Stromversorgung

Stellwände 190 x 98 cm können bereit gestellt werden

Selbstverständlich können Sie auch eigene Stellwände mitbringen.

Teilnahme am Kolloquium

Kaffee, Getränke und Mittagessen

Teilnahme an der Abendveranstaltung

Aufnahme Ihres Firmennamens und Firmenlogos in die Tagungsunterlagen

Aufnahme Ihres Firmennamens und Firmenlogos auf unserer Internetseite nebst Link zu Ihrer Homepage

Vorläufiges Programm

Einsendeschluss: 15. März 2009

Sollten Sie an unserem Angebot interessiert sein, bitten wir Sie, die beigefügte Rückantwort bis zum 15. März 2009 an uns per Post, Fax oder E-mail zurück zu schicken.

!

!

!

!

!

!

!

Exhibition

All morning and afternoon tea breaks will be served in the exhibition area. This will provide excellent opportunities for exhibitors and delegates to meet and talk.The traditional dinner party provides the opportunity to get in contact with customers and colleagues

Service Package Exhibition

The booth fee for exhibitors who have advertised in the proceedings is exempt from charges.

Should you not be interested to advertise in the proceedings, we offer the option to present your company for a booth-fee of 250 € per metre (exhibition space at least 2 meters).

Following services will be rendered for one person of your company:

Exhibition space according to requirements 1-3 meters including 1 table and 2 chairs and power supply

Poster walls are available upon request:Their measurements are 190 x 98 cm.

Of course, you can also use your own display

Participation at the symposium

Refreshment and lunch

Participation at the dinner party

Presentation of your company name and logo in the symposium materials

Presentation of your company name and logo at our website including hyperlink to your homepage

Preliminary Program

!

!

!

!

!

!

!

thDeadline: March 15 , 2009

Those who wish to advertise in the proceedings and/or to attend at the exhibition should complete the reply form for exhibitors

thand return it to us until March 15 , 2009.

AACHEN NTERNATIONAL INING YMPOSIAI M S

www.aims.rwth-aachen.de

Tuesday, June 2

Wednesday, June 3

10.00 am - 6.00 pm Exhibitors set up displays

8.30 am - 6.30 pm

7.30 am - 9.00 am

Exhibitors set up displays

Conference and Exhibition

Thursday, June 43.15 pm

9.00 am - 3.15 pm Conference and Exhibition

Exhibitors remove display

Dienstag, 2. Juni

Mittwoch, 3. Juni

10.00 - 18.00 Uhr Standaufbau

8.30 -18.30 Uhr

7.30 - 9.00 Uhr

Standaufbau

Kolloquium und Ausstellung

Donnerstag, 4. Juni15.15 Uhr

9.00 - 15.15 Uhr Kolloquium und Ausstellung

Standabbau

REPLY FORM ADVERTISEMENT AND EXHIBITION

Wir möchten eine Anzeige im Tagungsband schalten (600€ + MwSt.) /

We would like to advertise in the proceedings (600€ + VAT):yes

Wir wollen kostenfrei auf einer Stellwand werben /

We would like to use a poster wall without any further costs:noyes

Wir benötigen Stellwände der Universität /

We need the poster walls of the university:

Wir benötigen / kommen mit /

We need / come with:

Wir benötigen 1 Tisch und 2 Stühle /

We need 1 table and 2 chairs:

Wir wollen aufbauen am /

We want to set up on:

Wir benötigen Strom /

We need electricity:

1m 2m 3m

We would like to use a poster wall without advertisement for

a booth fee of 250 € + VAT per meter (exhibition space at least 2 meters):

Wir wollen ohne Anzeige an der Ausstellung teilnehmen

(Preis pro 1m Stellwand: 250 € + MwSt., Mindeststandfläche 2 Meter) /

Please return by mail, fax or e-mail to:

RWTH Aachen UniversitySymposium SecretariatInstitute of Mining Engineering IWuellnerstr. 252062 AachenGermany

Tel.: +49-241-80 95673Fax: +49-241-80 92272e-mail: [email protected]

Firma / Company:

Ansprechpartner / Contact Person:

Adresse / Address:

Phone:

e-mail:

Fax:

Telefon /

AACHEN NTERNATIONAL INING YMPOSIAI M S

yes

noyes

noyes

Mittwoch, 3. Juni 2009, 7.30 Uhr - 9.00 Uhr / rdWednesday, June 3 , 2009, 7.30 a.m. - 9.00 a.m.

Dienstag 2. Juni 2009, 10.00 Uhr - 18.00 Uhr / ndTuesday, June 2 , 2009, 10.00 a.m. - 6.00 p.m.

noyes

Deadline

thMarch 15 , 2009

AD

VE

RT

ISE

ME

NT

& E

XH

IBIT

ION

REGISTRATION AND HOTEL RESERVATION

Please register online at www.aims.rwth-aachen.de or

return by mail, fax or e-mail to:

RWTH Aachen University

Symposium SecretariatInstitute of Mining Engineering IWuellnerstr. 252062 AachenGermany

Tel.: +49-241-80 95673Fax: +49-241-80 92272e-mail: [email protected]

First Name:

Position:

Company:

Address:

Phone:

e-mail:

Last Name:

Title:

Fax:

REGISTRATION

HOTEL RESERVATION

I wish to book:

Preferred Category:

Preferred Hotel:

Arrival (day and time):

Departure (day and time):

Special remarks:

Single Room Double Room

Classification

*** Superior

*****

Single Room

Euro 105

Euro 95

Euro 75

Double Room

Euro 140

Euro 110-154

Euro 98

Date, Signature:

The program is subject to change!

AACHEN NTERNATIONAL INING YMPOSIAI M S

***Superior *** **

Aquisgrana Benelux Mercure Lousberg

RE

GIS

TR

AT

ION

& H

OT

EL R

ES

ER

VA

TIO

N

AA

CH

EN

INT

ER

NA

TIO

NA

L M

ININ

G S

YM

PO

SIA

th thMay 26 and 27 , 2010

Aachen, Germany

www.aims.rwth-aachen.de

AIMS 2010

Symposium Secretariat - Institute of Mining Engineering IRWTH Aachen University

Wuellnerstrasse 2 - 52062 Aachen, GermanyTel.: +49-(0)241-80 95673 - Fax: +49 (0)241-80 92272

e-mail: [email protected]

A I M SACHEN NTERNATIONAL INING YMPOSIA

seit 1987

since 1987

High Performance Mine Production

Rockbolting in Mining

Rapid Mine Development

A I M SACHEN NTERNATIONAL INING YMPOSIA

AIMS 2009

AA

CH

EN

INT

ER

NA

TIO

NA

L M

ININ

G S

YM

PO

SIA