Upload
anneke-alman
View
222
Download
1
Embed Size (px)
Citation preview
Status
Günther Rosner KHuK, Bad Honnef, 9/12/11 1
Erster Geburtstag
Günther Rosner KHuK, Bad Honnef, 9/12/11 2
Unterzeichung des völkerrechtlichen FAIR-Abkommens am 4.10.2010 in Wiesbaden durch die Gründungsländer
Deutschland, Finnland, Frankreich, Indien, Polen, Rumanien, Russland, Slowenien, Schweden
BFCNilsson
FAIR Council
Vierkorn-Rudolph
ManagementBoard
Sharkov,Rosner
ResearchRosner
APPAF.C., NN
CBMMüller,Eschke
NuSTARGerl, Herlert
PANDA
Schmidt, Schadmand
Expert C‘ttee Experiments
ChairProject Office
Lehmann
TechnicalDivision
Krämer
TechnicalServicesLautenschläge
r
In-Kind Coordination
Jacoby
Technical Follow-up
E.M.
Project OfficeKolb
Site &Buildings
Hehenberger
M&E Eng. Automation, IT
Ludwig
M&E Eng. Power, Mat.
Sommer
M&E Eng. Thermo, Refrig.
Burgstaller
M&E Eng.Liqu., Gases
Jakobi
Constr. Eng.Building, Geo.
NN
ReportingHaus
AssistantNN
M&E AdvisorHildisch
Civil Eng. Advisor
Gooß
AdministrationRosner
Internal Services
E.N.
ControllingWeißbach
FinanceUrbach
PurchasingNN
PersonnelNN
Directors‘Office
Augustin
LegalAdvisor
NN
CouncilIssues
BeierSecretariat
Azzara, Maas
AFCSkeppstedt
Scientific Council
Martino
IKRBWenninger
MACEvans
FAIR GmbH
Günther Rosner 3KHuK, Bad Honnef, 9/12/11
FAIR-Forschungsabteilung
Günther Rosner KHuK, Bad Honnef, 9/12/11 4
FAIR Scientific Council
MartinoBoard of FAIR Collaborations
NilssonResearch Division
Rosner
APPAF.C., NN
CBM
Müller, Eschke
NuSTARGerl, Herlert
PANDASchmidt,
Schadmand
Expert C‘ttee Experiments
3 APPA, 2 CBM,2 NuSTAR, 2 PANDA
Project OfficeLehmann
Liaison OfficeVarentsov
Third Party Issues
Nicmorus
Chair All Accelerators
Board
Project Steering Board
CBM NuSTAR PANDA
AFC
SIS100
Experiment Coordinators
S&B PO
FAIR Council
IKRB
MAC
ACC PO
FAIR Technical Director
CR
FAIR – S&B
PMO
SubprojectSite & Buildings
FAIR Director Site & Buildings
SubprojectExperimentsFAIR Research
Director
SubprojectAccelerators
EXP PO
HESR CommonSystems
GSI GSI
o o o o
FZJ GSI
SC
BFC
APPA
Project Lead
Chair: FAIR Scientific Director
ECE
FAIR-Projektstruktur
Günther Rosner KHuK, Bad Honnef, 9/12/11 5
6
FAIR-Anlage
Günther Rosner KHuK, Bad Honnef, 9/12/11
CBM
PANDA NuSTAR
Super-FRS
APPA
7
Schnelle BeschleunigungFerrit & MA Kavitäten
Großer Gradient, variable Frequenz
Kompakt & kosteneffektivSupraleitende Magnete
dB/dt ~ 4T/s
Hohe StrahlqualitätElektronen & stochastische Kühlung XHV @ Hoher Strahlintensität
Hochvakuum ~10-13 mbar
Beschleuniger
Günther Rosner KHuK, Bad Honnef, 9/12/11
8
Anti-Proton Annihilation @ DA
Günther Rosner KHuK, Bad Honnef, 9/12/11
PANDA
KHuK, Bad Honnef, 9/12/11 9
Compressed Baryonic Matter
Günther Rosner
SIS100/300
NuSTAR
Günther Rosner KHuK, Bad Honnef, 9/12/11 10
APPA: Paritätsverletzung
Günther Rosner KHuK, Bad Honnef, 9/12/11 11
PS
PNWFS
EE
QG
522/
Mixing coefficient for states with opposite parities:
Energy levels of He-like uranium
2E1 (PNC)
To “compete” with spontaneous decay channels one needs to induce a two-
photon PNC transition by polarised light with intensity 1020 W/cm2
NN
ee
Zee
NN
Select case with small splitting!
APPA: Plasmen
Günther Rosner KHuK, Bad Honnef, 9/12/11 12
Particles / cm-3
Tem
pera
ture
[eV
]
Jupiter
LaserHeating
Sun Surface
Magnetic Fusion
solid statedensity
PHELIXSun Core
Inertial Fusion Energy
XFEL
SIS 18
Ion BeamHeating
SIS 100
Strongly coupled
plasmasIdeal plasmas
FLASH
KHuK, Bad Honnef, 9/12/11 13
Stufenweiser Aufbau
Günther Rosner
Start Version Phase A(SIS100) Phase B
(SIS300)
Modularised Start Version
Module 0 Module 1 Module 2 Module 3 Module 4 Module 5
SIS100 Exp. halls for CBM &
APPA
Super-FRS for
NuSTAR
Antiproton Facilityfor PANDA & options for
NuSTAR
LEB, NESR, FLAIR
for NuSTAR & APPA
RESRfor PANDA, NuSTAR &
APPA
2017/18
KHuK, Bad Honnef, 9/12/11 14
Modularisierte Startversion
Günther Rosner
APPA
CBM/HADES
NuSTAR
PANDAExperimente
M1: APPAM1: CBM/HADESM2: NuSTARM3: PANDA
M0
M1
M2M3
M3
Kosten MSV
Günther Rosner KHuK, Bad Honnef, 9/12/11 15
Beschleuniger inkl. Personal, Module 0 – 3 502 M€
Bau, Module 0 - 3 400 M€
FAIR-Anteil an Experimenten (ohne Super-FRS)* 78 M€
FAIR GmbH Personal & laufende Kosten (bis 2018) 47 M€
Summe Module 0 - 3 1027 M€
in 2005 € (Inflation bis 2018 ca. +50%)
* Gesamtkosten Experimente (ausschließlich Super-FRS):ca. 210 M€ (2005) = 315 M€ (2018)
Zeitlicher Ablauf
Günther Rosner KHuK, Bad Honnef, 9/12/11 16
20122011 2013 201620152014
6
BauanträgeBaustelleneinrichtungAusschreibungen BauBau der Beschleuniger- und DetektorkomponentenFertigstellung RohbauInstallation Beschleuniger und DetektorenDatennahme
7 108
2017 2018 2019
12
6789
1112
10
119
KHuK, Bad Honnef, 9/12/11 17
Zeitlicher Ablauf Experimente• Beendigung F&E Phase
– Entscheidungen bzgl. technischer Alternativen– Bau von Prototypen aller wesentlichen Detektorteile
• Einreichung “Technical Design Reports”– Evaluation durch “Expert Committee Experiments”
• Koordination mit– Bau– Beschleunigern
• Identifikation von kritischen Punkten– Meilensteine– Zeitabläufe– Ergebnisse
• Erstellung von Risiko-Management-Plänen• Sicherung der Drittmittelförderung 2012• Einreichung der Konstruktions-MoUs Ende 2012
Günther Rosner
KHuK, Bad Honnef, 9/12/11 18
Zeitlicher Ablauf Experimente• (Europaweite) Ausschreibungen 2013• Bau der Detektoren 2013-16• Einreichung der Betriebs-MoUs 2016• Einfahren der Experimente 2017/18• Erste Periode Datennahme 2018-21
Günther Rosner
Probebohrungen 31.8.11
Günther Rosner KHuK, Bad Honnef, 9/12/11 19
Baufeldfreimachung 6.12.11
Günther Rosner KHuK, Bad Honnef, 9/12/11 20
Freiflächenplanung
Günther Rosner KHuK, Bad Honnef, 9/12/11 2121
Integration in das Landschaftsbild
Fließende Geländeanschlüsse
Park- und Waldelemente
Anlehnung an nahe NaturdenkmälerRetention / Versickerung
Dachbegrünung
Fassadenbegrünung
Vielen Dank!
Günther Rosner KHuK, Bad Honnef, 9/12/11 22