50
VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented by Presented by Olaf LAWRENZ Vice President Supply Chain Management Airbus Material, Logistics and Suppliers Ersatzteilversorgung aus Hamburg für die weltweite Airbusflotte

100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

  • Upload
    vanngoc

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010

Presented byPresented by

Olaf LAWRENZVice President Supply Chain ManagementAirbus Material, Logistics and Suppliers

Ersatzteilversorgung aus Hamburg für die weltweite Airbusflotte

Page 2: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

"A pessimist sees the difficulty in every opportunity;ti i t th t it i diffi lt "an optimist sees the opportunity in every difficulty."

W Churchill

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 2

Page 3: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- InnovationInnovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion

A380 N t k P d kti d L i tik- A380 Netzwerk, Produktion und Logistik

• After SalesB d h it d L ftf h tl i tik- Besonderheiten der Luftfahrtlogistik

- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent.

Weltweites Logistik Netzwerk- Lebenszyklen eines Airbus

- Nachbestellung von ErsatzteilenT t / L i tik

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 3

Page 4: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- InnovationInnovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion

A380 N t k P d kti d L i tik- A380 Netzwerk, Produktion und Logistik

• After SalesB d h it d L ftf h tl i tik- Besonderheiten der Luftfahrtlogistik

- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent.

Weltweites Logistik Netzwerk- Lebenszyklen eines Airbus

- Nachbestellung von ErsatzteilenT t / L i tik

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 4

Page 5: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Innovation• Zwei-Piloten-Cockpit• Twin-Engine für Widebody• Verbundwerkstoffe in Primärstruktur

1972 - A300

• Verbundwerkstoffe in Primärstruktur

• Fly-by-Wire• Familienkonzept

1987 - A320• Familienkonzept• Sidestick-Steuerung

• Extensive Verwendung von Verbundwerk-1991 A330/A340 • Extensive Verwendung von Verbundwerk-stoffen und Aluminiumlegierungen

• Neue Flügeltechnologie • Kabinenkomfort – leise Kabine

1991 - A330/A340A400M

• Erstes durchgehendes Doppeldeck• Werkstoff Glare auf Rumpfbeplankung oben2005 - A380

and

prop

rieta

ry d

ocum

ent.

p p g• Lasergeschweißtes Rumpfunterteil• Dezentralisiertes Hochdruck-Hydrauliksystem

• Vermehrter Einsatz von CFK für Rumpf und Tragflächen

hts

rese

rved

. Con

fiden

tial a

2012 - A350 Vermehrter Einsatz von CFK für Rumpf und Tragflächen

• Reib-Rühr-Schweißtechnik• Größere Fenster für die Passagiere• Flugzeugstruktur- und Bordelektronik Überwachungssysteme

© A

IRBU

S S.

A.S.

All

rig

Seite 5

• RFID-bereit: rotierende Komponenten werden mit Chips ausgestattet,um das Logistikmanagement entsprechend zu unterstützen

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 5

Page 6: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Eine globales Unternehmen

320 Sprachen

6 027

and

prop

rieta

ry d

ocum

ent. 3 Kundenbetreuungszentren

5 Ersatzteilzentren

12 Fertigungsstandorte

310 Flugzeugbetreiber

6,027 ausgelieferte Flugzeuge

52.000 Mitarbeiter

hts

rese

rved

. Con

fiden

tial a

14 Trainingszentren

9 Engineering-Design-Zentren

24/7 Stunden Customer Support (365 Tage im Jahr)50

88 Nationalitäten

160 Vertretungen

317 Kunden250 resident customer support managers

© A

IRBU

S S.

A.S.

All

rig 1 globales Unternehmen24/7 Stunden Customer Support (365 Tage im Jahr)50 Flugsimulatoren

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 6

Page 7: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Unser Markt

St t U

Art der FlugzeugBetreiber

Abhä i

Instandhaltungsphilosophie

Kl i

Flottengröße

Si l Ai l

Flugzeug-modell*

Europa

Regionen

Start UpsBetreiber von

Fracht-flugzeugen

AbhängigUnabhängig

Instand-

Klein (1 – 9 a/c)

Mittel (10 49 a/c)

Single Aisle

Wide Body

Europa

Amerikaflugzeugen

CharterCorporate / VIP/

R i

haltungs-betriebe

(10 –49 a/c)Groß

(>50 a/c)Long Range

A380

Asien / Pazifik

Mittl O t RegierungLow Cost

Traditionelle

A380

A400M

Mittlerer Osten

Lateinamerika

and

prop

rieta

ry d

ocum

ent.

Traditionelle AirlinesMilitärMRTT (Tanker)

/ Karibik

Afrika

hts

rese

rved

. Con

fiden

tial a

*Marktanteil Flugzeuge imBetrieb insgesamt 6.027 Einheiten

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 7

Page 8: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Unsere Kunden weltweit

A I R L I N E S

EFW

LIBYAN ARAB AIRLINES

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 8

Page 9: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Zahlen, Daten und Fakten

Weltweite Versorgung der Airbuskunden mit Ersatzteilen- 3.4 Millionen Teile im Bestand auf 65,990 qm Lagerfläche> 600 Mitarbeiter weltweit

320 000 Kundenaufträge im Jahr24 Stunden Order Desk für alle Kundenaufträge

- 320,000 Kundenaufträge im Jahr

Ersatzteildaten und umfassende Erstbevorratungsleistungeng g- 80 Tage Erstbevorratungskonferenzen in 2009- 125 Tage Beratungsdienstleistungen (Consultancy) pro Jahr

U t tüt 90 V k f k i 2009

and

prop

rieta

ry d

ocum

ent. - Unterstützung von 90 Verkaufskampagnen in 2009

T h i h U ü O fü E il

hts

rese

rved

. Con

fiden

tial a Technische Unterstützung vor Ort für Ersatzteile

- Incident, Working Party Support- Spares-Reps für Indienststellung eines neuen Flugzeugtyps

© A

IRBU

S S.

A.S.

All

rig

p p g g g yp

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 9

Page 10: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

2008 in review2009 und 2010 im Rückblick

Airbus’ Erfolge in 2009 umfassen

• Auslieferung der ersten A320 zusammengebaut in Tianjing, China

• Auslieferung des 4000. Flugzeuges der A320 Familieg g g

• Erstflug A330 Frachter im November

• Erstflug A400M im DezemberErstflug A400M im Dezember

Airbus’ Erfolge in 2010 umfassen

• Auslieferung des 6000 Airbus Flugzeuges im Januar

and

prop

rieta

ry d

ocum

ent. • Auslieferung des 6000. Airbus Flugzeuges im Januar

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 10

Page 11: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- Innovation- Innovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion- A380 Netzwerk, Produktion und Logistik

• After Sales- Besonderheiten der Luftfahrtlogistik- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent. - Weltweites Logistik Netzwerk

- Lebenszyklen eines Airbus- Nachbestellung von Ersatzteilen

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 11

Page 12: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Airbusflotte – in Produktion

A380 Familie

A340 Familie

A350 Familie

A330 Familie

and

prop

rieta

ry d

ocum

ent. A320 Familie

hts

rese

rved

. Con

fiden

tial a

Die gesamte Airbusflotte umfasst 16 Modelle

A300/A310 nicht mehr in der Produktion – Flotte wird

© A

IRBU

S S.

A.S.

All

rig bis mindestens 2050 fliegen !

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 12

Page 13: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

A380 - Das Netzwerk wird größer

Über 103,500 Flugstunden bei über 11,100 Flügen

London

Toronto

New York

LondonParis

S lTokyo

Dubai

Seoul

Hong Kong

B k k

Los AngelesJeddah

Bangkok

Singapore

and

prop

rieta

ry d

ocum

ent.

Auckland

SydneyJohannesburg

hts

rese

rved

. Con

fiden

tial a Auckland

Melbourne

Fast 4 Millionen Passagiere sind schon mit einer der

© A

IRBU

S S.

A.S.

All

rig Fast 4 Millionen Passagiere sind schon mit einer der insg. 26 z.Zt. operierenden A380 geflogen!

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 13

Page 14: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

A380 Produktion

Seitenleitwerk, Stade

Klappen und Vorflügel,Bremen

Stade

VarelNordenham

HamburgBroughton

Filton Sektion 18

BuxtehudeBremenMeaulte

gFilton

Sektion 13, Hamburg

Sektion 18, Hamburg

Toulouse

BremenSt.-Nazaire LaupheimNantes

Madrid (Getafe)

Kabine, Hamburg

Höhenleitwerk und Heckspitze, Getafe

and

prop

rieta

ry d

ocum

ent.

Puerto Real

hts

rese

rved

. Con

fiden

tial a

: Final Assembly Line

: Production SiteFlügel BroughtonCockpit-Sektion,

© A

IRBU

S S.

A.S.

All

rig Flügel, BroughtonTriebwerkaufhängung,ToulouseSektion 15, St. Nazaire

p ,Méaulte

Unterbaugruppen vonSektion 11/12, Méaulte

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 14

Page 15: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

GrößenordnungenGrößenordnungen: A318 / A380

A380 Spannweite: 79,8 mA380 Länge: 73,0 m

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

A318 Spannweite: 34,09 m

© A

IRBU

S S.

A.S.

All

rig

p ,A318 Länge: 31,45 m

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 15

Page 16: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- Innovation- Innovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion- A380 Netzwerk, Produktion und Logistik

• After Sales- Besonderheiten der Luftfahrtlogistik- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent. - Weltweites Logistik Netzwerk

- Lebenszyklen eines Airbus- Nachbestellung von Ersatzteilen

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 16

Page 17: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Airbus Central Entity Organisation

Aircraft Aircraft Sales Customer Services

…angepasst an die Prozesse der Fluggesellschaften

Design/Production

Engineering andMaintenance

Material, Logisticsand Suppliers

Trainings and Flight Operations

and

prop

rieta

ry d

ocum

ent.

Programmes Management des Flugzeug Lebenszyklus

hts

rese

rved

. Con

fiden

tial a

Services andcustomer support

Hauptschnittstelle zu den Kunden und A b t i t i t Di tl i t

Transversal functions

© A

IRBU

S S.

A.S.

All

rig

customer support Angebot von integrierten Dienstleistungen

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 17

Page 18: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Worldwide locations – Customer Support & ServicesWeltweite Standorte – Customer Support & Services

3 Customer support centres

Washington Toulouse Beijing

4 Training centres

Toulouse HamburgBeijing

4 Training centres

MiamiBeijingHamburg

Toulouse

4 Material and logistics centres

3

and

prop

rieta

ry d

ocum

ent.

BeijingWashington Hamburg

3 Warehouses Frankfurt

hts

rese

rved

. Con

fiden

tial a Dubai

SingaporeShanghai

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 18

Page 19: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Weltweites Netzwerk von Lägern

Mehr als 80% der bestellten Teile sind vorrätigMehr als 80% der bestellten Teile sind vorrätig 3,4 Millionen Teile auf Lager auf 65.990 m2 weltweit

HamburggFrankfurt Washington

HamburgFrankfurtWashingtonSingapurPekingShanghaiDubai• 115.000 Teilenummern

• 2.454,000 Ersatzteile

• 134.000 Werkzeuge/ GSE

• 36.000 m2

• 515 Teilenummern

• 600 Ersatzteile

• 4.200 m2

• 71.000 Teilenummern

• 533.000 Ersatzteile

• 2.000 Werkzeuge/ GSE

• 10.000 m2

DubaiHamburgFrankfurtWashingtonSingapurPekingShanghaiDubai

and

prop

rieta

ry d

ocum

ent.

and

prop

rieta

ry d

ocum

ent.

ShanghaiSingapur Peking• 5. 000 Teilenummern

- Hauptsächlich für A380 -

• 43.000 Ersatzteile

• 370 A380 Werkzeuge/GSE115 000 T il• 71.000 Teilenummern17 000 Teilen mmern

hts

rese

rved

. Con

fiden

tial a

hts

rese

rved

. Con

fiden

tial a

• 146 Teilenummern

• 160 Ersatzteile

• 740 m2

• 17.000 Teilenummern

•112.000 Ersatzteile

• 3 150 m2

370 A380 Werkzeuge/GSE

•2.700 m2

• 22.000 Teilenummern

• 237,000 Ersatzteile

• 320 Werkzeuge/ GSE

• 115.000 Teilenummern

• 2.454,000 Ersatzteile

• 134.000 Werkzeuge / GSE

• 36.000 m2

• 515 Teilenummern

• 600 Ersatzteile

• 7.500 m2

• 533.000 Ersatzteile

• 2.000 Werkzeuge / GSE

• 10.000 m2

• 22.000 Teilenummern

• 237.000 Ersatzteile

• 320 Werkzeuge / GSE

• 17.000 Teilenummern

•112.000 Ersatzteile

•3.150 m2• 146 Teilenummern

• 160 Ersatzteile

• 5.000 Teilenummern

- hauptsächlich für A380 -

• 43.000 Ersatzteile

370 A380 Werk e ge/ GSE

© A

IRBU

S S.

A.S.

All

rig©

AIR

BUS

S.A.

S. A

ll rig

740 m2• 3.150 m2• 320 Werkzeuge/ GSE

• 5.800 m2

36.000 m7.500 m g

• 5.800 m2• 740 m2• 370 A380 Werkzeuge/ GSE

• 2.700 m2

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 19

Page 20: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Materialkategorien

Proprietary Spares Supplier Equipment

GSE and Tools Mod & Repair Kits

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 20

Page 21: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Lebenszyklus eines Airbus – Dienstleistungen von Material, Logistics and Suppliers

Flugzeug wird produziertFlugzeug wird entwickelt

g pp

Beratung für Bevorratungs- M t i l &

Empfehlungen Unterstützung bei

Integration der Instandhaltungs-

anforderungen während

Bevorratungsstrategien für

ErsatzteileMaterial &

Logistikschulung und -training von

Kunden

gzur Bevorratung Unterstützung bei

der Beschaffung der Bevorratung

Fl i t i B t i b (I S i )

anforderungen während der Konstruktion

Flugzeugauslieferung

Fl i t i B t i b (I S i )Flugzeug ist im Betrieb (In-Service)Flugzeug ist im Betrieb (In-Service)

and

prop

rieta

ry d

ocum

ent.

Flugzeug Um-und Auf- Nachbestellung

E t t il

hts

rese

rved

. Con

fiden

tial a

rüstungen UngeplanteInstandsetzung

von ErsatzteilenGeplante

Instandhaltung

© A

IRBU

S S.

A.S.

All

rig Transport/ Logistik

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 21

Page 22: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Lebenszyklus eines Airbus – Dienstleistungen von Material, Logistics and Suppliersg ppFlugzeug wird

entwickeltFlugzeug wird produziert

Empfehlungen Beratung für Bevorratungs- Unterstützung bei M t i l &

gzur BevorratungBevorratungs

strategien für Ersatzteile

Unterstützung bei der Beschaffung der Bevorratung

Material & Logistikschulung und -training von

KundenIntegration der

Instandhaltungs-anforderungen währendanforderungen während

der KonstruktionFlugzeugauslieferung

Flugzeug ist im Betrieb (In-Service)

and

prop

rieta

ry d

ocum

ent.

Flugzeug Um-und Auf Nachbestellung

E t t il

hts

rese

rved

. Con

fiden

tial a

Transport/ Logistik

rüstungen GeplanteInstandhaltung

UngeplanteInstandsetzung

von Ersatzteilen

© A

IRBU

S S.

A.S.

All

rig Transport/ LogistikTransport/ Logistik

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 22

Page 23: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Orderkreisläufe in der ErsatzteilversorgungDrei Orderkreisläufe in der After Sales Logistik

Customer

CODCOD1

PlanningPlanningStock

Vi Ai b

2Via local

Organization

Via Airbusfacilities1)

and

prop

rieta

ry d

ocum

ent.

1st tier3

hts

rese

rved

. Con

fiden

tial a

Customer order with stock1

2 Replenishment

© A

IRBU

S S.

A.S.

All

rig

Customer zero stock31) Warehouses for quality inspection / EASA form 1 certification

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 23

Page 24: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Materialfluss von Lieferanten und Airbus Ersatzteillägern an die AirbuskundengHeutiger Materialfluss: Versandwege der Routineaufträge

5 lokale Airbus Läger~ 300 Kunden

Umsatz nach Region~ 400 Hauptlieferanten

(proprietary parts)

5 lokale Airbus LägerTeil der Versorgungskette

für die Serienproduktion

7 Ersatzteilläger weltweit

43k30k

190k37k

Deutschland27 Lieferanten Americas

32%HAM - Hausbruch

HAM FuhlsbüttelWashington

34k

24k

Europe37%

Frankreich204 Lieferanten

0k

0kHAM - Fuhlsbüttel

FrankfurtToulouseSt Nazaire

Paris(cross-dock)

15k

7k11k

0k

13k

Middle East + Africa

12%

England148 Lieferanten

Dubai

Getafe

Filton

and

prop

rieta

ry d

ocum

ent.

7k

0k5kSpanien

22 Lieferanten

Singapore

Shanghai

Asia Pacific Rim, 10%

hts

rese

rved

. Con

fiden

tial a 2k

BejingChina, 9%

Vorgaben der nationalen Luftfahrtbehörden müssen

© A

IRBU

S S.

A.S.

All

rig Vorgaben der nationalen Luftfahrtbehörden müssen beachtet werden !

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 24

Page 25: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Nachbestellung von Ersatzteilen

Customer Order Desk (COD)

and

prop

rieta

ry d

ocum

ent.

24 / 7 Erreichbarkeit> 800.000 Kundenkontakte pro Jahr

hts

rese

rved

. Con

fiden

tial a

p> 320.000 Bestellungen

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 25

Page 26: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Nachbestellung von Ersatzteilen

24/7

EFW

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

15%aller Aufträge

SPEC 2000

41%aller Aufträge

44%aller Aufträge

© A

IRBU

S S.

A.S.

All

rig

Phone, Fax, E-Mail

SPEC 2000

SPEC 2000 InternetOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 26

Page 27: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Prioritäten in der Ersatzteilversorgung

Priorität Beispiel Reaktionszeit

AOG

Priorität Beispiel

Das Flugzeug befindet sich in einer Flughafenstation und kann aufgrund

Reaktionszeit

4 StundenAOG Flughafenstation und kann aufgrund technischer Probleme nicht starten

f

Aircraft On Ground

WSPDas Flugzeug befindet sich in einer

Reparatur, die aufgrund eines fehlenden Ersatzteils nicht fortgesetzt werden kann

max. 24 StundenWork Stoppage

USR Der Sicherheitslagerbestand ist unterschritten Innerhalb von 7

TagenUrgent Stock Replenishment

and

prop

rieta

ry d

ocum

ent.

RTN

Tagen

Kataloglieferzeit d H t ll

U ge t Stoc ep e s e t

hts

rese

rved

. Con

fiden

tial a RTN Bevorratung des Lagers des Herstellers

Routine

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 27

Page 28: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

AOG – Aircraft on Ground

AOGsAOGsZwischenfälle, die einen Weiterflug

unmöglich machen

and

prop

rieta

ry d

ocum

ent.

Kosten eines A320 AOGs für

hts

rese

rved

. Con

fiden

tial a

Kosten eines A320 AOGs für die Airline

geschätzte 4.500 US $ / Std

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 28

Page 29: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

AOG – Aircraft on Ground

513 x Hotel 513 Passagiere : 12 First Class, 42 Business Class, 459 Economy; gebucht von New York nach Dubai

A380:y; g

513 x Transport zum Flughafen und zurück

New YorkStopover

Dubai

513 x Frühstück /Mittag / Abendessen

and

prop

rieta

ry d

ocum

ent.

Alternativer Service von 2 A330 mit einem Stop-Over

N Y k h D b i

hts

rese

rved

. Con

fiden

tial a

Transfer aller Passagierezu alternativen Flügen

Verlust des Images

von New York nach Dubai

© A

IRBU

S S.

A.S.

All

rig

Verlust des ImagesKundenverärgerung

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 29

Page 30: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

AOG – Aircraft on Ground

Wandbildschirm Echtzeitinfo• Nachrichtenkontrolle• Echte AOG Visualisierung

Orders Total / Year

2005XXXX XXXX

2006

Orders today

closed XXX

XXX

Spares Support and Services

Customer Order Desk

AOG-Service

IncidentsMSN Tail-No A/C Type Location Spares Rep. Contact

Orders Total / Year

2005XXXX XXXX

2006

Orders today

closed XXX

XXX

Spares Support and Services

Customer Order Desk

AOG-Service

IncidentsMSN Tail-No A/C Type Location Spares Rep. Contact

Orders Total / Year

2005XXXX XXXX

2006

Orders today

closed XXX

XXX

Spares Support and Services

Customer Order Desk

AOG-Service

IncidentsMSN Tail-No A/C Type Location Spares Rep. Contact

Orders Total / Year

2005XXXX XXXX

2006

Orders today

closed XXX

XXX

Spares Support and Services

Customer Order Desk

AOG-Service

IncidentsMSN Tail-No A/C Type Location Spares Rep. Contact

Spares Support and Services

Customer Order Desk

HMV-Service

Spares Support and Services

Customer Order Desk

HMV-Service

Spares Support and Services

Customer Order Desk

HMV-Service

Spares Support and Services

Customer Order Desk

HMV-Service

Spares Support and Services

Customer Order Desk

HMV-Service

Spares Support and Services

Customer Order Desk

HMV-Service Echte AOG Visualisierung• HMV Ereignis-Management• Orderstatus-Übersicht

open XXX

General Information

- Customer Visits

- Sales campaign

- .........

F2221 XX-XXX A320-200 Lisboa Hein Draft +0011111111111open XXX

General Information

- Customer Visits

- Sales campaign

- .........

F2221 XX-XXX A320-200 Lisboa Hein Draft +0011111111111open XXX

General Information

- Customer Visits

- Sales campaign

- .........

F2221 XX-XXX A320-200 Lisboa Hein Draft +0011111111111open XXX

General Information

- Customer Visits

- Sales campaign

- .........

F2221 XX-XXX A320-200 Lisboa Hein Draft +0011111111111

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Total / Year2005XXXX XXXX

2006

HMV AOG

HMV WSP

SB KITS

XX

XX

Main Maintenance Locations

MSN TAIL CUS LOC FROM TO CHK TYPE PROJ REMARKSA300/A310/-600M0227 EC-HVZ TNT ZX005-BOD 16-Apr-05 16-May-05 C A300B4-203 31102270

M0288 N416FE FDX TAP-LIS 1-Apr-05 6-May-05 C A310-222 31102880

M0524 D-AIDF HLF ZX005-BOD 11-Apr-05 30-Apr-05 C A310-304 31105241 Engine Repair

M0537 EP-MHI IRM ZX005-BOD 2-Jan-05 TBA C A310-300 31105371

M0556 G-MONS MON MON-LTN 15-May-05 27-May-05 C A300B4-605R31105561

M0565 CS-TEX TAP TAP-LIS 26-Apr-05 31-May-05 REPAIR A310-304 31105651 INCIDENT - NLG COLLAPS

M0600 C-GSAT TSC TAP-LIS 8-Apr-05 2-May-05 C A310-308 31106000

M0605 G-OJMR MON MON-LTN 15-Feb-05 22-Mar-05 C A300B4-605R31106051

A320/A321/A319F0392 G-MONX MON MON-LTN 29-Mar-05 16-Apr-05 C A320-212 31203922

F0480 G-MEDA LAJ MON-LTN 17-Apr-05 28-Apr-05 C A320-231 31204800DLH-HAM A/C´sXX

XX

Orderstatus Übersicht• Verbindungen zu AIRTAC

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

F0522 TC-JMA THY SWR-ZRH 18-Apr-05 17-May-05 C8 A321-111 31205220 10Y

F0595 D-AIRS DLH S7I-SNN 18-Apr-05 19-May-05 D1 A321-131 31205950

F0714 G-BXKA JMC MON-LTN 13-Apr-05 20-Apr-05 C A320-214 31207140

F0730 G-BXKC JMC MON-MAN 28-Apr-05 5-May-05 C A320-214 31207300

F1751 6Y-JMJ AJM ZX005-BOD 25-Apr-05 12-May-05 C A320-214 31217510

F2165 F-BBWT NAS ZX005-BOD 1-May-04 31-May-05 RECON A320-214 31221650 Cabin Mod. (VIP)

A340/A330G0048 6Y-JMC AJM ZX005-BOD 21-Feb-05 8-Apr-05 C A340-312 31300481 delay

G0120 D-AERK LTU LTU-DUS 20-Apr-05 11-May-05 C A330-322 31301203

G0214 G-VELD VIR ZX005-TLS 1-Jun-05 25-Jul-05 CONV A340-313 31302140 Cabin Conversion

G0356 OY-VKH MYT SWR-ZRH 8-Apr-05 4-May-05 C4 A330-343 31303560 5Y

G0495 A7-HHH QAF ZX005-BOD 19-May-04 31-Mar-05 CONV A340-541 31304950 delay

G0551 I-LIVM LDI ZX005-BOD 19-May-05 9-Jun-05 C A330-243 31305510

ASSETG0031 F-OITN AIB AEL-MAD 26-Jan-05 20-Mar-05 RECON A340-200 31300311 COMMITMENT LETTER ITEMS

M0660 TBA PIA TBA TBA TBA RECON A310-300 31106602 PIA CONVERSION STEP 2

M0687 TBA PIA TBA TBA TBA RECON A310-300 31106872 PIA CONVERSION STEP 2

M0689 TBA PIA SWR-ZRH TBA TBA RECON A310-300 31106892 PIA CONVERSION STEP 2

AFR-ORY

TAP-LIS

IBM-MAD

L7H-BUD

S7I-SNN

ZX005-BOD

.........

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

A/C´s

.......

XX

XX

XX

XX

XX

XXXXXX

and

prop

rieta

ry d

ocum

ent.

and

prop

rieta

ry d

ocum

ent. Mehrschirm-Arbeitsplätze

• Mehranwendungssichtbarkeit

hts

rese

rved

. Con

fiden

tial a

hts

rese

rved

. Con

fiden

tial a

• Schneller Zugang zur Information

© A

IRBU

S S.

A.S.

All

rig©

AIR

BUS

S.A.

S. A

ll rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 30

Page 31: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Lebenszyklus eines Airbus – Dienstleistungen von Material, Logistics and Suppliersg ppFlugzeug wird

entwickeltFlugzeug wird produziert

Empfehlungen Beratung für Bevorratungs- Unterstützung bei M t i l &

gzur BevorratungBevorratungs

strategien für Ersatzteile

Unterstützung bei der Beschaffung der Bevorratung

Material & Logistikschulung und -training von

KundenIntegration der

Instandhaltungs-anforderungen währendanforderungen während

der KonstruktionFlugzeugauslieferung

Flugzeug ist im Betrieb (In-Service)

and

prop

rieta

ry d

ocum

ent.

Flugzeug Um-und Auf Nachbestellung

E t t il

hts

rese

rved

. Con

fiden

tial a

rüstungen GeplanteInstandhaltung

UngeplanteInstandsetzung

von Ersatzteilen

© A

IRBU

S S.

A.S.

All

rig Transport/ Logistik

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 31

Page 32: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Besonderheiten der Luftfahrtlogistik

Fragmentierte und „long-distance“ Supply Chains

Berücksichtigung von internationalen zoll- und handelsrechtlichen Aspekten

Kapazitätsrestriktionen am Frachtmarkt, besonders für mittel-und übergroße Fracht

Informations- und Kommunikationsprozesse müssen den physischen Transport begleiten

and

prop

rieta

ry d

ocum

ent. physischen Transport begleiten

Hohe Kosten für den Kunden bei Versagen der

hts

rese

rved

. Con

fiden

tial a

gLogistikprozesse

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 32

Page 33: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Transport / Logistik

A380

A350Supply Chain Herausforderungen

Technology Standard

A320

A340B777

A300

A320

B747

B707

and

prop

rieta

ry d

ocum

ent.

The stragegic gapSuper Conny

hts

rese

rved

. Con

fiden

tial a The stragegic gap

© A

IRBU

S S.

A.S.

All

rig

1960 1970 1980 20001990 2010Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 33

Page 34: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Transport / Logistik

In der Luftfahrtindustrie organisieren Kunden üblicherweise ihre Transporte selber

Steigende Anzahl der Beteiligten in der Lieferkette:450 Lieferanten, 50 Spediteure, 400 Kunden5 – 10 Übergaben bei einer Ersatzteillieferung5 10 Übergaben bei einer Ersatzteillieferung

Hartumkämpfter Frachtmarkt, steigende Auslastung

42% der deklarierten AOG Aufträge werden von der Kundenlogistik zu spät abgeholt und verursachen

p g g

and

prop

rieta

ry d

ocum

ent. Kundenlogistik zu spät abgeholt und verursachen Verspätungen von bis zu 2,5 Tagen

F hl kl A i d V t ä it

hts

rese

rved

. Con

fiden

tial a Fehlen von klaren Anweisungen oder Verträge mit

Spediteuren, keine garantierten Lieferzeiten

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 34

Page 35: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Transport / Logistik: Supply Chain zum Kunden

42% aller AOGs

Spediteur Ankunft

aller AOGs werden nicht rechtzeitig abgeholt

Abf ti Spediteur Ankunft beim

KundenBeladung @Frachtführer

Umladen@ Drehkreuz

Ankunft am Flughafen

Nächster Flufhafen Waren-

eingang

Abfertigung bei Airbus

oder Lieferanten

Entscheidender Zeitpunkt um den nächstmöglichen

Lieferanten

Lokaler AgentZoll-abfertigung

Abholug durch lokalen Agenten

gFlug zu erreichen

and

prop

rieta

ry d

ocum

ent.

Kunde verantwortlich für das Transportmanagement

Mit CSL: Airbus verantwortlich für das

hts

rese

rved

. Con

fiden

tial a Transportmanagement

Airbus führt den gesamten Transport durchEin einziger Ansprechpartner 24/7 verfügbar

© A

IRBU

S S.

A.S.

All

rig Ein einziger Ansprechpartner, 24/7 verfügbarFeste Lieferzeiten und Preise

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 35

Page 36: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Ersatzteillogistik A380

Wie viele Teile der neuen A380 sind

Xt Xt L ?

12?Xtra-Xtra Large?

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

20. September 2007Trends in der Ersatzteillogistik Seite 36Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 36

Page 37: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Ersatzteillogistik A380

Wie viele Teile der neuen A380 sind

Xt Xt L ?

Nur ein einziges!

Xtra-Xtra Large?

Nur ein einziges!

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

20. September 2007Trends in der Ersatzteillogistik Seite 37Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 37

Page 38: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

A380 - Logistik

Normaler Frachter Großer Frachter SpezialtransportNormaler Frachter Großer Frachter SpezialtransportA300 / DC8 / MD11F B747ND / A380F Beluga / Antonov

BremsklappeQuerruderFlügelluftleitblech

L-Teile

FrachtertürFahrwerksklappenFlü l itFlügelspitzeHöhenruderVerkleidungV flü l

XL-Teile

and

prop

rieta

ry d

ocum

ent. Vorflügel

Unteres Seitenruder (A380)XXL Teile

hts

rese

rved

. Con

fiden

tial a Unteres Seitenruder (A380)XXL-Teile

N i i i Ai b E t t il i t XXL

© A

IRBU

S S.

A.S.

All

rig Nur ein einziges Airbus Ersatzteil ist XXL

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 38

Page 39: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Wahrscheinlichkeit des Bedarfs

Bestellvolumen

%

Bestellvolumen

Bremsklappe> 99%Querruder

FlügelluftleitblechL-parts

< 1%

FrachtertürFahrwerksklappenFlügelspitzeXL-parts < 1%g pHöhenruderVerkleidungVorflügel

XL-parts

and

prop

rieta

ry d

ocum

ent.

< 0 1%

Vorflügel

Unteres Seitenruder XXL-parts

hts

rese

rved

. Con

fiden

tial a < 0,1%A380

p

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 39

Page 40: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Kosten versus Zeit

Transport von Landeklappen aus dem Lager in Frankfurt nach New Yorkaus dem Lager in Frankfurt nach New York

Maße: 8900 x 2400 x 2400 mm10.000 kg Gewichtg

Luftfracht Luftfracht mitVerladegarantie

CharterBeluga/Antonov

KostenTransit

US $ 45.0003-4 Tage

KostenTransit

Verladegarantie

US $ 85.0001-2 Tage

Beluga/AntonovKostenTransit

US $ 450.0001-2 TageTransit 3 4 Tage

Beispielwerte

Transit 1-2 Tage

Beispielwerte

Transit 1-2 Tage

Beispielwerte

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

Umsatzverlust im Falle eines Flugzeugausfalls

© A

IRBU

S S.

A.S.

All

rig

Umsatzverlust im Falle eines Flugzeugausfallscirca 300-500.000 US $ pro Tag

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 40

Page 41: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Flexible Beförderungsmöglichkeiten

Standard Service Individuelle Lösungen

FCA Prozeß Verladegarantie

g

FCA ProzeßVerantwortung des Kunden

g

Flugzeug CharterLösungen

Airbus Service

Andere logistische

LösungenTransport InternationalTransport International

and

prop

rieta

ry d

ocum

ent. Andere logistische

AnforderungenHandcarried LKW etc

hts

rese

rved

. Con

fiden

tial a Handcarried, LKW, etc.

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 41

Page 42: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- Innovation- Innovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion- A380 Netzwerk, Produktion und Logistik

• After Sales- Besonderheiten der Luftfahrtlogistik- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent. - Weltweites Logistik Netzwerk

- Lebenszyklen eines Airbus- Nachbestellung von Ersatzteilen

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 42

Page 43: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Trends der ErsatzteilversorgungslogistikStarke Diversifizierung und Entwicklungen bei den Kunden

Kein einheitliches Kundenprofilp

Hoher Kostendruck – weniger Lagerung von Teilen und dadurch Anstieg des Anteils der AOG Bestellungen

Nachfrage nach neuen Dienstleistungen – Teileverfügbarkeit nach dem Leasingprinzip zur Reduzierung des Cash-Flows beim Kunden.

B d t d V ä d d M ktBedeutende Veränderungen des MarktesSteigender Anteil älterer Flugzeuge mit noch unbekanntem Bedarfsverhalten

Anstieg der Nachfrage von Out-of-Production Teilen bei gleichzeitigerForderung nach konstanten Preisen und der gleichen Verfügbarkeit wie beiTeilen aus der Serienproduktion

and

prop

rieta

ry d

ocum

ent.

Fehlende Supply-Chain Kompetenz bei Start-ups – Konzentration auf das Kerngeschäft und Auslagerung anderer Aktivitäten

Zukünftige Flugzeugprogramme erfordern individuelle Aktivitäten bei der

hts

rese

rved

. Con

fiden

tial a

Die Kunden erwarten hohe Ersatzteilverfügbarkeit bei

Zukünftige Flugzeugprogramme erfordern individuelle Aktivitäten bei derEinführung

© A

IRBU

S S.

A.S.

All

rig Die Kunden erwarten hohe Ersatzteilverfügbarkeit bei geringen Kosten

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 43

Page 44: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Trends der Ersatzteilzugangskonzepte

Alternative Ersatzteilzugangskonzepte:

Pooling

Flight Hour Services (FHS) - Zugriff auf Airbus vor-Ort

Lagerbestand mit Abrechnung auf Flugstundenbasisg g g

Total Support Package (TSP) - Rundum Sorglos Paket

Airbus Inventory Management

Fl kit O B d E t t il k t

and

prop

rieta

ry d

ocum

ent. Fly away kit – On-Board Ersatzteilpaket

Virtual Warehouse

hts

rese

rved

. Con

fiden

tial a

Individuelle Kundenbedürfnisse und Erwartungen führen

© A

IRBU

S S.

A.S.

All

rig

gzu maßgeschneiderten Konzepten

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 44

Page 45: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Flight Hour Services (FHS) Konzept

AIRBUS FHS FHS Standard Exchange orderAIRBUS FHS Customer Order

Desk

HAMBURG

FHS Standard Exchange order

Drop Airbus FHSC t O d D kHAMBURG

shipments A/L outstationCustomer Order Desk

AIRBUS Logistic PlatformStandard Exchange Unit

Core Unit returnPoolA/L Main base

and

prop

rieta

ry d

ocum

ent.

Drop

Airbus logistic platform

hts

rese

rved

. Con

fiden

tial a Drop

shipments

© A

IRBU

S S.

A.S.

All

rig

A/L outstation

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 45

Page 46: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Airbus Inventory Management (AIM) Konzept

1 Kunde entnimmt Ersatzteil

2 Informationsfluss

Elektronische Nachbestellung an Airbus

wird ausgelöst

Kunde• RFID-Lesegeräte

müssen im Lager

3Physischer

• RFID-Anhänger integriert in das Versandetikett

müssen im Lager installiert werden

• Inventar befindet sich im Hauptersatzteillager des Kunden.

Teileversand vom regionalen Ersatzteillager

Warenfluss

Airbus erhält automatisch eine Nachricht, dass

T il b i

an den Kunden

4 Informationsfluss

and

prop

rieta

ry d

ocum

ent. Teile beim

Kunden angekommen sind

W i K d i ‘AIM T il’ t i t d t Ai b t ti h i A ffüllt il

hts

rese

rved

. Con

fiden

tial a Wenn ein Kunde ein ‘AIM-Teil’ entnimmt, sendet Airbus automatisch ein Auffüllteil

innerhalb der vereinbarten Lieferfrist.

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 46

Page 47: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Agenda

• Airbus Material, Logistics and Suppliers- Innovation- Innovation- Ein globales Unternehmen- Zahlen, Daten und Fakten

• Airbusflotte- Flugzeugfamilien in Produktion- A380 Netzwerk, Produktion und Logistik

• After Sales- Besonderheiten der Luftfahrtlogistik- Organisation- Weltweites Logistik Netzwerk

and

prop

rieta

ry d

ocum

ent. - Weltweites Logistik Netzwerk

- Lebenszyklen eines Airbus- Nachbestellung von Ersatzteilen

hts

rese

rved

. Con

fiden

tial a - Transport / Logistik

• Trends in der Ersatzteilversorgungslogistik

© A

IRBU

S S.

A.S.

All

rig

• ZusammenfassungOlaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 47

Page 48: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Zusammenfassung

Zum Bau von Flugzeugen verfügt Airbus über eine extensive und komplexe Produktionslogistik.extensive und komplexe Produktionslogistik.

Zur Sicherung der Ersatzteilversorgung bedarf es i b t d fl ibl Di t ib ti l i tikeiner robusten und flexiblen Distributionslogistik.

Die wachsende Flotte und permanent steigende Kundenanforderungen erhöhen den Bedarf für maßgeschneiderte Logistiklösungen.

Gegenwärtige Projekte wie A400M und A350

g g g

and

prop

rieta

ry d

ocum

ent.

g g jbeziehen neben der Ersatzteilverfügbarkeit insbesondere Logistikdienstleistungen in die Servicekonzepte mit ein.

hts

rese

rved

. Con

fiden

tial a

Durch One Stop Shopping-Erfordernisse wird Airbus zukünftig Marktpartner mit umfassenden

© A

IRBU

S S.

A.S.

All

rig

zukünftig Marktpartner mit umfassenden Logistiklösungen versorgen.

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 48

Page 49: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

Die Zukunft hat begonnenan

d pr

oprie

tary

doc

umen

t.ht

s re

serv

ed. C

onfid

entia

l a©

AIR

BUS

S.A.

S. A

ll rig

20. September 2007 Seite 49Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 49

Page 50: 100318 Airbus-Product-Supply HAW 2010v2.ppt ... · VDI/DGLR/RAeS Vortrag an der HAW Hamburg, 18.03.2010 Presented byPresented by Olaf LAWRENZ Vice President Supply Chain Management

© AIRBUS S.A.S. All rights reserved. Confidential and© AIRBUS S.A.S. All rights reserved. Confidential andproprietary document.

This document and all information contained herein is the soleproperty of AIRBUS S.A.S.. No intellectual property rights aregranted by the delivery of this document or the disclosure ofits content. This document shall not be reproduced orpdisclosed to a third party without the express written consentof AIRBUS S.A.S. This document and its content shall not beused for any purpose other than that for which it is supplied.

The statements made herein do not constitute an offer. Theyare based on the mentioned assumptions and are expressedp pin good faith. Where the supporting grounds for thesestatements are not shown, AIRBUS S.A.S. will be pleased toexplain the basis thereof.

AIRBUS, its logo, A300, A310, A318, A319, A320, A321,A330, A340, A350, A380, A400M are registered trademarks.g

and

prop

rieta

ry d

ocum

ent.

hts

rese

rved

. Con

fiden

tial a

© A

IRBU

S S.

A.S.

All

rig

Olaf Lawrenz - Airbus Operations GmbH - VP Supply Chain Management -- VDI / DGLR / RAeS Vortrag an der HAW -- 18.03.2010 Seite 50