Ablaufplan ECA

Embed Size (px)

Citation preview

  • 8/17/2019 Ablaufplan ECA

    1/14

    Arbeitspakete (AP)

    Nr. Beschreibung

    1 Management and integration of the project1.1 Risk and requirements analysis1.2 Defnition o application scenarios1.3 Implementation and maintenance o the groupware system

    1.

    2 Pattern !ecognition A"gorithms2.1 Development o pattern recognition algorithms2.2 Database construction or testing and implementation o the system2.3 Validation and tests

    3 #e$e"opment of "ogica" structure3.1 Analysis and development o so tware project3.2 o tware and database development3.3 Implementation and tests o logial system

    #e$e"opment of ph%sica" structure.1 Analysis and development o hardware project.2 !ardware development.3 !ardware integration and tests o physical system& 'ntegration and testing of the s%stem

    &.1 Development o the integration plan&.2 Development and implementation o testing ramework&.3 Integration o logical and physical structures&. ystem implementation and road map&.& "n#site tests and validation&. $ackaging and defnition o the fnished product

    #irect app"ication in rea" en$ironment.1 %nvironmental Impact $lan.2 &ataloging areas or implementation and testing.3 Development o system use strategy. 'uilding database or system validation.& (esting and validation

    Products and communication media.1 )erging the partial results and public e*pert and amateur workshops

    .2 +uture commerciali,ation strategies and communication channels.3 Demonstration and dissemination system

    . Instruction and training activitiesAuf*and Personenmonate +esamtProjekttre,enMei"ensteine

    Betei"igte Partner-Diamantinense +oundation or Research and %*tension -.+V/)#+D$0.+V/) (echnological Intelligence 1ucleus -.+V/)#1I(0+reie .niversit2t 'erlin -+.'0+ederal .niversity o 3oias -.+30

    %valuation and adaptation o the assumptions in the progress o theresearch project

  • 8/17/2019 Ablaufplan ECA

    2/14

    4 +D$5 1I(5 +.'5 .+36 1I(5 +.'7 +.'8 1I(5 +.'5 .+39 1I(5 .+3: +D$5 1I(5 +.'; .+3

    < +D$5 1I(5 +.'; .+3

  • 8/17/2019 Ablaufplan ECA

    3/14

    Auf*and der Partner

    0MB + (PM)

    #P N'561 62 63 6 6& 6 6 67 68 16

    28 3 2 2 312

    2 1 1

    & 1 1 1

    6 7 6 &2 312 112 2

    6 6 2 6 2122

    6 1 1 2122

    1 16 3 6 8

    73 33 33 3

    1616

    22 3 1 1 2

    2 1 1 13& 23 2 2 2 3

    2 2

    38

    1298

  • 8/17/2019 Ablaufplan ECA

    4/14

    7: >47 77: 4

  • 8/17/2019 Ablaufplan ECA

    5/14

    eit/ und Ab"aufp"an ( eitraum- 3 0ahre)

    4aufender Projektmonat (4M)

    11 12 13 1 1& 1 1 17 18 26 21 22 23 2 2& 2 2 27 28

  • 8/17/2019 Ablaufplan ECA

    6/14

  • 8/17/2019 Ablaufplan ECA

    7/14

    36 31 32 33 3 3& 3

  • 8/17/2019 Ablaufplan ECA

    8/14

  • 8/17/2019 Ablaufplan ECA

    9/14

    &ost#calculation 1 2 3 &

    (otal budget in @

    Partner 9ta, #e$ices :ontracts 5ra$e" ota" :ost 9um

    4=45=8< 465 8=59 ?5 %rrB9 = ;rr-&67

    .+V/) (echnological Intelligence 1ucleus -.+V/)#1I(0 67?5 ?9

  • 8/17/2019 Ablaufplan ECA

    10/14

    7

    roportion 9upport

    4 C %rrB9 ?

    4 C %rrB9 ?

    4 C %rrB9 ?4 C %rrB9 ?

    4589456:8

  • 8/17/2019 Ablaufplan ECA

    11/14

    A$6 $attern Recognition Algorithms3oalsB

    )ethodology

    ResponsibleB (echnology Intelligence 1ucleus -1I(0"perational timeB4st )onth to 77th )onth

    1; (asks $eriod

    6;4 )4 # ) 68

    6;6 )49 # )64

    6;7 Validation and tests )66 # )77

    (he purpose o this package is to per orm the necessary sbe used or the recognition o orest species; (hese algortdata and images collected in the feld and turn it into in oranaly,ed vegetation;

    A literature review o e*isting work in the area will be made; +rommathematical equations and tested the avaliable pattern recognitused or feld devices; &ollected data should be treated with post

    (his in ormation will be validated with real in ormation so that wetechniques applied; (his means that tests are per ormed in areasconventional manner in order to compare the results;

    Development o pattern recognitionalgorithms

    Database construction or testing andimplementation o the system

  • 8/17/2019 Ablaufplan ECA

    12/14

    1ecessary supplies

    +.'

    +.'

    +.'

    udies to develop the algorithms that willos will be used in the treatment o the

    mation about the composition o the

    this review5 will be developed relevantion methods according to the sensors to berocessing and converted into in ormation;

    can test the e ectiveness o thehere a orest inventory is carried out in

    $artnersinvolved

    rom A$4B Defnition oapplication scenarios

    rom A$8B Analysis anddevelopment o hardwareproject

    orm A$:B &ataloging areas orimplementation and testing

    rom A$:B 'uilding database orsystem validation

    rom A$8B all

  • 8/17/2019 Ablaufplan ECA

    13/14

    A$8 Development o physical structure3oalsB

    )ethodology

    ResponsibleB +ederal .niversity o 3oias"perational timeB4st )onth to 64th )onth

    1; (asks $eriod

    8;4 )4 # )=

    8;6 !ardware development )8 # )4:

    8;7 )49 # )6

    Develop the necessary hardware to integrate the sensorsdata5 store and trans er them; It will also be implementedadjustments to the needs o the orest environment;

    (he equipment will be used based on Arduino5 to aggregate the scommunication necessary or the collection and trann erEncia theavailable several devices on the market5 it is not necessary to dewhich model will be made is best suited or the project; It shouldapply to the model;

    Analysis and development o hardwareproject

    !ardware integration and tests o physicalsystem

  • 8/17/2019 Ablaufplan ECA

    14/14

    1ecessary supplies

    1I(

    1I(

    +.'5 1I(

    o be used5 so that the aircra t can collecthe relevant navigation system and the

    nsing systems5 geolocation5 storage andcollected data; ince they are alreadyelop a specifc aircra t5 but the analysis onlso be analy,ed electronic structures that

    $artnersinvolved

    rom A$4B Defnition oapplication scenarios

    rom A$7B Analysis anddevelopment o so twareproject

    rom A$:B &ataloging areas orimplementation and testingFDevelopment o system usestrategy