27
RESUME 2014 1 Name : ZAINAL BIN RIFEN I/C. No : 740821-01-5773 Passport No. : A 12883854 Height : 170 cm Weight : 82 kg Blood Type : ‘B’ Nationality : MALAYSIAN D.O.B : 21 st Aug 1974 Position : PROJECT MANAGER Educational Qualifications 1990 – 1991 Sekolah Menengah Kebangsaan Tasek Utara JB Form 5 (SPM) 1994 Universiti Teknologi Mara Diploma in Metalogy Engineering SUMMARY: Twenty (20) years and over of experience in various type of Industry (heavy Fabrication Yard, Oil and Gas Refinery Plant, Offshore production/compression /wellhead/water injection and Chemicals Plant) both local & international project site locations in the inspection, commissioning and with knowledge in the process operation of a wide variety of equipments such as pressure vessels, pipings, valves, nitrogen pumps and etc. ZAINAL BIN RIFEN

CV - ZAINAL RIFEN

Embed Size (px)

Citation preview

Page 1: CV - ZAINAL RIFEN

RESUME 20141

Name : ZAINAL BIN RIFEN

I/C. No : 740821-01-5773

Passport No. : A 12883854

Height : 170 cm

Weight : 82 kg

Blood Type : ‘B’

Nationality : MALAYSIAN

D.O.B : 21st Aug 1974

Position : PROJECT MANAGER

Educational Qualifications

1990 – 1991 Sekolah Menengah Kebangsaan Tasek Utara JB Form 5 (SPM)

1994 Universiti Teknologi Mara Diploma in Metalogy Engineering

SUMMARY:

Twenty (20) years and over of experience in various type of Industry (heavy Fabrication Yard, Oil and Gas Refinery Plant, Offshore production/compression /wellhead/water injection and Chemicals Plant) both local & international project site locations in the inspection, commissioning and with knowledge in the process operation of a wide variety of equipments such as pressure vessels, pipings, valves, nitrogen pumps and etc.

ZAINAL BIN RIFEN

Page 2: CV - ZAINAL RIFEN

RESUME 20142

Duties and Responsibilities

Read P & ID Drawings and Isometric Drawing, Line up Test Pack Systems, Assist Engineer in Mob and De-Mob of Equipment, Prepare and compile test reports. Responsible and capable of Supervision of personnel in carrying out Nitrogen Helium Leak Testing, Hydro Testing and Pneumatic Testing activities. Identifying work activities detail task and safety tool box talk. Provide guidelines and training to technical personnel’s to upgrade their technical knowledge capabilities.

Organize crews to do line walk and generate punch list for process piping systems or pipeline and to rectify all the issue if system fails. Verify all test records and pre-commissioning check sheets. To implement onshore and offshore commissioning activities. Main controller and communicator during the whole operation of pressurization. Liase with the client regarding any issues and safety procedures or issues during the operation. Experience in handling multi-racial and multi-cultural work force. Safety and quality oriented in project implementation with high regards to project target completion. Ablility to work under pressure especially in critical decision making that involves time element for project completion & emergency situation

Ability to operate the following equipments:

Nitrogen Pump, Helium Booster Unit, Air Compressor, Mass Spectrometer, Ultrasonic Tester, Flooding Pump, Pressurization Pump, Air Dryer, Single stage flooding pumps, Positive Displacements Test Pumps, Nitrogen Converters (10,000 psi or higher), Vacuum Pump, Dew Point Meter and Data Loggers.

Experience Record :

1995-1997 PTIS (M) Sdn Bhd Kuala LumpurPipeline Pre-commissioning Technician

Pre-commissioning projects for various Petronas Gas, Gas Malaysia and EPMI Projects around West Malaysia

1997- 1999 BJ Process & Pipeline Services (S) PLC SingaporePipeline Pre-commissioning Foreman

•Worked on various cross country & sub sea pipeline in Malaysia, Indonesia, Vietnam, China, Myanmar, Brunei and Thailand.

•Pipeline diameter ranged from 16”to 36” and up to 360 km in length•Assisting project supervisor on day to day work scope and hands on work on test equipments

Oct-1998 ACGS (S) Pte Ltd SingaporeNitrogen Helium Leak Testing – UNOCAL / Pailin offshore Thailand

•Performing with 10 crews for 38 Test Packages•Mobilizing and demobilizing testing equipments•Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector

ZAINAL BIN RIFEN

Page 3: CV - ZAINAL RIFEN

RESUME 20143

Mac -1999 BJ Process & Pipeline Services (S) PLC SingaporePipeline and Pre-commissioning Technician – Pogo Benchamas offshore Thailand

•Pre-commissioning for sub sea pipeline•Pipeline diameter 18” and up tot 360km length•Operating and setting such as dew-point meter, SSB receiver, air compressor , filling and flooding pump, gen set, air dryer and vacuum pump

•Mobilizing and demobilizing equipments

Aug-1999 ACGS (S) PLC SingaporeNitrogen Leak Testing – Premier Oil Offshore Indonesia (Natuna Gas & Oil Field)

Specialist Hook-up and de-commissioning crew Assist Project Engineer with pre-engineering Operating hydrostatic testing, nitrogen conditioning, ultra sound work, bolt torquing and tensioning

work and retro jetting

1999 - 2001 Perry CM (M) Sdn Bhd Kuala LumpurPipeline Pre-commissioning Technician

Pre-commissioning for various Gas Malaysia Projects, Petronas Gas Berhad Pipeline diameter range between 6” , 8”, 16” to 18” and up to 42km long Performing on pipeline cleaning, hydrostatic testing and drying Setting and operate equipments such as air compressor, filling pump, squeeze pump, gen-set and

air dryer unit

Sept-2001 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Petronas Carigali Offshore Malaysia (Angsi-A)

Work as a night shift Supervisor In-charge of 4 specialist crews for 34 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Oct-2001 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – UNOCAL / South Pailin offshore Thailand

Work as a night shift Supervisor In-charge of 2 specialist crews for 24 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector Mobilizing and demobilizing equipments

Feb-2002 IKM Asia Testing Pte Ltd Singapore

ZAINAL BIN RIFEN

Page 4: CV - ZAINAL RIFEN

RESUME 20144

Nitrogen Helium Leak Testing – Exxonmobil Onshore Malaysia (Bintang A and B)

Work as a night shift Supervisor In-charge of 2 specialist crews for 24 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector Mobilizing and demobilizing equipments

May-2002 PSL/Pipetech (S) Pte Ltd SingaporeNitrogen Helium Leak Testing – Exxonmobil Onshore Malaysia (Tapis F)

Work as a night shift Supervisor In-charge of 2 specialist crews for 11 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector Mobilizing and demobilizing equipments

July-2002 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Petronas Carigali Offshore Malaysia (Resak) Work as a night shift Supervisor In-charge of 8 specialist crews for 24 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Sep-2002 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Total FinaElf Onshore Indonesia (Tunu-F Gas Field)

Crew Change with Project Engineer In-charge of 6 specialist crews for 8 test packages remaining Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Demobilizing equipments and handover various papers works to client

Oct-Nov – 2002 IKM Testing (S) PTE. LTD.Pneumatic and Nitrogen Helium Leak Testing – ELF Total / Balai offshore Iran

ZAINAL BIN RIFEN

Page 5: CV - ZAINAL RIFEN

RESUME 20145

•Work as a supervisor•In-charge of 5 specialist crews for hydro test, pneumatic test and leak test for 22 test packages•Assist Project Engineer with Pre-Engineering and paper works•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

Dec-2002 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – ExxonMobil Offshore Malaysia (IBA-X)

Work as a night shift Supervisor In-charge of 1 specialist crews for 12 test packages Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Jan - 2003 IKM Testing (S) Pte. Ltd.Nitrogen Helium Leak Testing –Exxonmobil Offshore Malaysia (IBA-X)

•Work as a dayshift supervisor•In-charge of 4 specialist crew for 12 test packages•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

Feb– 2003 Pipetech Pte LtdNitrogen Helium Leak Testing – Maersk Oil Qatar / Block 5 Hyundai Yard Ulsan Korea

•Work as a nightshift supervisor•In-charge of 7 specialist crew for 12 test packages•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

Mac -2003 Halliburton (S) Pte Ltd SingaporeNitrogen Helium Leak Testing – Shell / KBR Onshore Bangladesh (Sangu)

Work as a nitrogen pump operator Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector

Apr - 2003 IKM Testing (S) Pte. Ltd.Pneumatic and Nitrogen Leak Testing – Petronas Carigali Offshore Malaysia (Bekok-C)

•Work as a supervisor•In-charge of 5 specialist crews for hydro test, pneumatic test and leak test for 47 test packages•Assist Project Engineer with Pre-Engineering and paper works•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

May– 2003 PSL Far East Pte LtdNitrogen Helium Leak Testing – Maersk Oil Qatar / Block 5 Hyundai Yard Ulsan Korea

ZAINAL BIN RIFEN

Page 6: CV - ZAINAL RIFEN

RESUME 20146

•Work as a nightshift supervisor•In-charge of 7 specialist crew for 12 test packages•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

Jun-2003 PSL Energy Services Pte Ltd SingaporeNitrogen Helium Leak Testing – UNOCAL Offshore Indonesia (NPU-CPU)

Work as a Supervisor In-charge of 5 specialist leak test crews for 52 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

July- 2003 Halliburton Pipeline & Process ServicesPipeline and Pre-Commissioning -Sarawak Shell Bhd / NISCOMA Project

•Work as a nightshift supervisor•Performing on pipeline cleaning, hydrostatic testing and drying.•Setting and operate equipments such as air-compressor, filling pump, squeeze pump, gen-set and air-dryer unit

Agut -2003 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Petronas Carigali Offshore Malaysia (Bekok-C)

Work as a Supervisor In-charge of 5 specialist crews for hydro-test, pneumatic test and leak test for 47 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Sept -2003 Halliburton (S) Pte Ltd SingaporeNitrogen Pipeline, Umbilical and Electrical Testing – Karratha Offshore Australia (Rock water 2)

Work as a Supervisor Testing Sub Sea station and 18” pipeline Operating single stage flooding pump, positive displacements test pump

Oct -2003 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Petronas Carigali Offshore Malaysia (Labuan ERB West)

Work as a Project Engineer In-charge of 6 specialist crews and pre-engineering for 19 test packages

ZAINAL BIN RIFEN

Page 7: CV - ZAINAL RIFEN

RESUME 20147

Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector

Demobilizing equipments and handover various paper works to client

Nov -2003 PSL Energy Services Pte Ltd SingaporeNitrogen Helium Leak Testing – Talisman Offshore Malaysia (BRC, BKC, BRE and BRA)

Work as a Supervisor In-charge of 3 specialist leak test crews for 15 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Nov 2003 – Jan -2004 Halliburton Far East Pte Ltd SingaporeNitrogen Leak Testing – BP Gas Onshore Rusia ( Saklin )

Work as a night shift Supervisor In-charge of 7 specialist crews for 12 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Jan-2004 Halliburton Far East Pte Ltd SingaporeNitrogen Helium Leak Testing – TotalFinaElf Onshore Indonesia (PCK 3 / EPSC 2)

•Work as a night shift Supervisor•In-charge of 7 specialist crews for 12 test packages•Assist Project Engineer with Pre-Engineering and paper works•Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak Detector•Mobilizing and demobilizing equipments

May 2004 to Mar 2005 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – ENI group onshore Iran (South Pars Field Development Phase 4 &5)

Work as a Supervisor In-charge of 3 specialist leak test crews for 125 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra SoundLeak Detector Mobilizing and demobilizing equipments

Apr-Oct 2004 IKM Testing Asia (S) Pte Ltd IRAN (ASSALUYEH)Nitrogen Leak Testing – Onshore South Pars Field Development Phase 4 & 5

ZAINAL BIN RIFEN

Page 8: CV - ZAINAL RIFEN

RESUME 20148

•Pre-commissioning project for various Hyundai consortium, P.O.G.S & E.I.B.V Group.•Work as a supervisor in day shift•In-charge of 3 specialist crews for hydro test, pneumatic test and leak test for 135 test packages•Operating Nitrogen Pump Unit, Helium Booster unit, Mass Spectrometer and Ultra sound Leak Detector•Mobilizing and de-mobilizing equipments

Aug-2005 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Exxonmobil onshore Malaysia (Guntong E) Work as a night shift Supervisor In-charge of 2 specialist leak test crews for 17 test packages Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Nov 2005 to Feb 2006 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Exxonmobil onshore Malaysia (BRE) Work as a night shift Supervisor Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Apr 2006 to Jun 2006 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Offshore Malaysia (Guntong Project) Work as a night shift Supervisor Assist Project Engineer with Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Jul 2006 to Aug 2006 IKM Asia Testing Pte Ltd SingaporeNitrogen Helium Leak Testing – Offshore Malaysia (Guntong Project)

Work as a Engineer Pre-Engineering and paper works Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Mobilizing and demobilizing equipments

Nov 05’-Jan 2006 IKM Testing Asia (S) Pte Ltd SingaporePneumatic and Nitrogen Helium Leak Testing – Onshore BRE Talisman, SDE Pasir Gudang, Johor

Work as a Supervisor in day shift Handling Strength test and flushing, for 150 test packages Operating Nitrogen Pump Unit, Chart recorder

ZAINAL BIN RIFEN

Page 9: CV - ZAINAL RIFEN

RESUME 20149

Mobilizing and de-mobilizing equipments

Mar 06’-Apr 2006 Halliburton India Pte Ltd IndiaNitrogen Leak Testing – Port Pipava shore, India

Work as a Supervisor in day shift Handling Strength test and flushing Operating Nitrogen Pump Unit, Chart recorder Mobilizing and de-mobilizing equipmentsJun 06’-Sep 2006 BJ Process & Pipeline/EFTECH MALAYSIANitrogen Helium Leak Testing – Offshore BRE Talisman

Work as a Supervisor in day shift Handling Strength test and flushing Operating Nitrogen Pump Unit, Chart recorder Mobilizing and de-mobilizing equipments

Nov 06’-Jan 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Offshore BRE Talisman

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Mar 07 – Apr 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Onshore Pasir Gudang

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

May 07 – Jul 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Offshore Malaysia

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Aug 2007 Efficient Technology SDN BHD MALAYSIA MALAYSIANitrogen Helium Leak Testing – Offshore Cakrawala Choc Brownfield

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

ZAINAL BIN RIFEN

Page 10: CV - ZAINAL RIFEN

RESUME 201410

Oct 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Offshore Malaysia

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Nov 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Offshore Malaysia

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Dec 2007 Efficient Technology SDN BHD MALAYSIANitrogen Helium Leak Testing – Offshore Malaysia

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Jan 08 Efficient Technology SDN BHD MALAYSIA Nitrogen/Helium Leak Testing Work for Kikeh FPSO

Work as a Project Engineer Operating Nitrogen Pump Unit, Helium Booster Unit, Mass Spectrometer and Ultra Sound Leak

Detector Pre-engineering and demobilizing equipments and handover various paper works to client

Jan 08 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia Limited / PTSCNitrogen/Helium Leak Testing Work at Vung Tau, Vietnam

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Feb 08 Efficient Technology SDN BHD MALAYSIA

ZAINAL BIN RIFEN

Page 11: CV - ZAINAL RIFEN

RESUME 201411

Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BO-B/C/D

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

May 08 Efficient Technology SDN BHD MALAYSIA Ramunia Fabricators Sdn. Bhd.Nitrogen/Helium Leak Testing at East Belumut

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

May 08 Efficient Technology SDN BHD MALAYSIA Ramunia Fabricators Sdn. Bhd.Nitrogen/Helium Leak Testing works for D35

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

June 08 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BR-E Northfield Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

June 08 Efficient Technology SDN BHD MALAYSIA Ramunia Fabricators Sdn. Bhd.Nitrogen/Helium Leak Testing works for SUJT-C

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

July 08 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia Limited

ZAINAL BIN RIFEN

Page 12: CV - ZAINAL RIFEN

RESUME 201412

Nitrogen/Helium Leak Testing at BR-E HOOK-UP

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

July 08 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at South Angsi-A Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Sept 08 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn. Bhd.Nitrogen/Helium Leak Testing at BO-A

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Sept 08 Efficient Technology SDN BHD MALAYSIA Malaysia Marine and Heavy Engineering Sdn. Bhd.Nitrogen/Helium Leak Testing at PC4

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Oct 08 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BR-E Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 09 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BO-B/C/D

ZAINAL BIN RIFEN

Page 13: CV - ZAINAL RIFEN

RESUME 201413

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 09 Efficient Technology SDN BHD MALAYSIA PC Myanmar (Hong Kong) Ltd.Nitrogen/Helium Leak Testing at Yetagun Platform

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 09 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn. Bhd.Nitrogen/Helium Leak Testing at BO – A Offshore

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

July 09 Efficient Technology SDN BHD MALAYSIA Murphy Oil Sarawak Co. Ltd.Nitrogen/Helium Leak Testing at BORF (Onshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Oct 09 Efficient Technology SDN BHD MALAYSIA Kencana HL Sdn BhdNitrogen/Helium Leak Testing at CPOC (JKA) (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Oct 09 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BR - A / D / E (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization.

ZAINAL BIN RIFEN

Page 14: CV - ZAINAL RIFEN

RESUME 201414

Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Oct 09 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BO-A Shutdown (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Dec 09 Efficient Technology SDN BHD MALAYSIA Kencana HL Sdn BhdNitrogen/Helium Leak Testing at BK - P / BE - P (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 10 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn BhdNitrogen/Helium Leak Testing at LHDP - A (Onshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 10 Efficient Technology SDN BHD MALAYSIA Shapadu Energy & Engineering Sdn BhdNitrogen/Helium Leak Testing at D35 (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 10 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BR-E Membrane (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans.

ZAINAL BIN RIFEN

Page 15: CV - ZAINAL RIFEN

RESUME 201415

Pre-engineering and handover various paper works to client

Feb 10 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn BhdNitrogen/Helium Leak Testing at MLDP - A (Onshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Apr - July 10 Efficient Technology SDN BHD MALAYSIA Malaysia Marine and Heavy Engineering Sdn BhdNitrogen/Helium Leak Testing at B11K-A (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Aug - Oct 10 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn BhdNitrogen/Helium Leak Testing at KAKG-A (Onshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

May 10 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BO-C Low Volume (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

March 10 Efficient Technology SDN BHD MALAYSIA Shapadu Energy and Engineering Sdn BhdNitrogen/Helium Leak Testing at D35 (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

May 10 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia Limited

ZAINAL BIN RIFEN

Page 16: CV - ZAINAL RIFEN

RESUME 201416

Nitrogen/Helium Leak Testing at BR-B (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

June 10 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BT-A (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

July 10 Efficient Technology SDN BHD MALAYSIA Malaysia Marine and Heavy Engineering Sdn BhdNitrogen/Helium Leak Testing at B11K-A (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2010 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BO - A Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2010 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia LimitedNitrogen/Helium Leak Testing at BR-A / B / C / D Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2010 Efficient Technology SDN BHD MALAYSIA Talisman Malaysia Limited

ZAINAL BIN RIFEN

Page 17: CV - ZAINAL RIFEN

RESUME 201417

Nitrogen/Helium Leak Testing at BK-A Shutdown

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2010 Efficient Technology SDN BHD MALAYSIA EPIC Mushtari Engineering Sdn BhdNitrogen/Helium Leak Testing at CKP MRU

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2011 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn BhdNitrogen/Helium Leak Testing at LHDP-A (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

2011 Efficient Technology SDN BHD MALAYSIA Sime Darby Engineering Sdn BhdNitrogen/Helium Leak Testing at F9JT-A (Offshore)

Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

Jan 2012 Efficient Technology SDN BHD MALAYSIA Shapadu Energy & Eng. Sdn BhdNitrogen/Helium Leak Testing at MLDP-A Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

April 2012 Efficient Technology SDN BHD MALAYSIA Shapadu Energy & Eng. Sdn BhdNitrogen/Helium Leak Testing at Suriya B Work as a Project Manager Coordinate manpower and equipment for mobilization / demobilization. Liaise with client regarding all project plans. Pre-engineering and handover various paper works to client

ZAINAL BIN RIFEN

Page 18: CV - ZAINAL RIFEN

RESUME 201418

2013 Efficient Technology SDN BHD MALAYSIA Pioneer Construction Sdn BhdNitrogen/Helium Leak Testing at CKP MRU Purging• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans.

2013 Efficient Technology SDN BHD MALAYSIA Malaysia Marine & Heavy EngineeringNitrogen/Helium Leak Testing at KNPG-B• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA Malaysia Marine & Heavy EngineeringNitrogen/Helium Leak Testing at Telok A

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA Pioneer Construction Sdn BhdNitrogen/Helium Leak Testing at Bumi B

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA Talisman Limited MalaysiaNitrogen/Helium Leak Testing at BR-E Memguard

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA EJ Joint Venture Sdn BhdNitrogen/Helium Leak Testing at MEPA

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client

ZAINAL BIN RIFEN

Page 19: CV - ZAINAL RIFEN

RESUME 201419

• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA Macrospec Sdn BhdNitrogen/Helium Leak Testing at Damar A

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA Greene’s Energy Asia Pacific Pte Ltd,Nitrogen/Helium Leak Testing at PL-26-HIHI Phase II-(Myanmar)

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2013 Efficient Technology SDN BHD MALAYSIA TNS Pte Ltd,Nitrogen Purging/Helium Leak Testing Shutdown at Yetagun Platfom A/B (Myanmar)

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2014 Efficient Technology SDN BHD MALAYSIA MMHENitrogen/Helium Leak Testing at Tapis-R

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2014 Efficient Technology SDN BHD MALAYSIA MMHENitrogen/Helium Leak Testing at Cendon

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system

ZAINAL BIN RIFEN

Page 20: CV - ZAINAL RIFEN

RESUME 201420

• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2014 Efficient Technology SDN BHD MALAYSIA BADPCNitrogen/Helium Leak Testing at South Acis

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2014 Efficient Technology SDN BHD MALAYSIA MMHENitrogen/Helium Leak Testing at Damar A

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

2015 Efficient Technology SDN BHD MALAYSIA MMHENitrogen/Helium Leak Testing and Bolting at SK316

• Work as a Project Manager• Able to handling various paper works, Line walk and preparation on system• Pre-engineering and demobilizing equipments and handover various paper works to client• Liaise with client regarding all project plans

ZAINAL BIN RIFEN