Upload
echtleder
View
217
Download
0
Embed Size (px)
Citation preview
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
1/19
THE STORY OFSALT & WATER
IN MAKINGA T-SHIRT
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
2/19
PRODUCT PROCESS
COTTONCULTIVATION &
GINNING
YARN SPINNING
GREY FABRIC KNITTING
DYED & FINISHED
FABRIC
DYEING &
FINISHING
USE OF
SALT &
WATER
T-SHIRTCUTTING , STITCHING
& FINISHING
T-SHIRT MAKING PROCESS
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
3/19
INPUT OUTPUT OVERVIEW FOR
DYEING
DYEING & FINISHING
ENERGYWATERCHEMICAL INPUTSDyestuffs
SALT Basic Chemicals
Auxiliaries
Electricity
Boiler Fuel
Genset Fuel
OTHERS ITEMS
RAW MATERIALS PRODUCTS
Grey Fabric Dyed &
Finished
Fabric
WASTE WATER GAS EMISSIONS SOLIDWASTE WASTE HEAT Boiler
Genset
Packing
Containers
Raw Materials
Sludge
Ash
Boiler
Genset
Dryers
Effluent
Packing
Lub oil-grease
Accessories
Concentrated Waste Water
with Salt
Wash Water
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
4/19
THE SCENARIO OF
SALT & WATER USAGEn The Whole of Europe is discharging about
200 Million Kilogram of Salt every year in
Textile Dyeing
n The Whole of Tirupur is discharging about80 Million Kilograms of Salt every year in
Textile Dyeing
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
5/19
35 litres200 gramsColouredT-Shirt
15 litresNilWhite
T-Shirt
Water Used
To make
One T-Shirt
Salt Used
To make
One T-Shirt
T-Shirt
SALT & WATER USED IN MAKING
ONE T-SHIRT
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
6/19
n To recover 95% of Water for reuse
from Textile Dyeing Waste Water= 111 Million litres / annum
n To recover 90% of Salt for reuse from
Textile Dyeing Waste Water= 4,50,000 Kgs / annum
Objectives ofSalt & Water Recovery Plant
at PREM , Tirupur, India
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
7/19
The Need
SWITCHER-PREM
SUSTAINABLE DEVELOPMENT
PROGRAMME
AS PART OF
THEIR CORPORATE SOCIAL
RESPONSIBILITY
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
8/19
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
9/19
Treatment Scheme
Segregation at Source
Dye Effluent Wash Effluent
Pre Treatment
Multiple Evaporator
Salt Crystallizer
Primary, Secondary &
Tertiary Treatment
Reverse Osmosis
Plant
2 stage water recovery
Recovered Water
for Reuse
Concentrated
RejectRecovered Salt
For Reuse
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
10/19
Technology of Salt Recovery
n During the Dyeing Process, Glaubers Salt will be usedinstead of Common Salt because it is purer and easierto recover for Reuse
n The concentrated Dye Effluent with Glaubers Salt ispre treated to remove colour
n It is passed through Multiple Evaporators and getsconcentrated
n The concentrated solution is chilled in VacuumCrystallizer and the Glaubers Salt is crystallized
n The crystallized Glaubers Salt is centrifuged and takenfor Reuse in the Dyeing Process
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
11/19
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
12/19
Capital Cost of the Project
Glaubers Salt Recovery Plant Rs. 158 lakhsWith
Multiple Evaporators, Crystallizer
Centrifuge, Structure etc.
Water Recycling Plant Rs. 200 lakhsWithPrimary Treatment Plant,
Secondary Bio Reactor,
Tertiary Treatment Plant,
Two Stage Reverse Osmosis Recycling Plant
TOTAL PROJECT COST Rs. 358 lakhs
USD 8,00,000
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
13/19
The Cost & The Benefits
Inputs Required for Operation
Electrical Power
Steam Energy
Chemicals & Consumables
Man power
Cost of FundsBenefits
Value Recovered Salt
Value of Recovered Water
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
14/19
COST OF OPERATION
FOR SALT RECOVERYn Every Kilogram of Recovered Salt Costs
Rs. 8 more than the cost of buying the Salt
uThis means Every T-Shirt cost goes up
by Rs. 2.00
uTherefore for 2.50 Million Coloured
T-Shirt / annum, it will cost the Company
by Rs 5.00 Million = USD 1,13,600
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
15/19
COST OF OPERATION
FOR WATER RECOVERYn Every Kilo litre of Recovered Water costs Rs. 30
more than the cost of procuring Water
u Every White T-Shirt cost goes up by Rs. 0.45
costing the Company annually for2 Million T-Shirts = Rs 0.90 Million = USD 20,400
u Every Coloured T-Shirt cost goes up by Rs. 1.05
costing the Company annually for
2.5 Million T-Shirts = Rs 2.62 Million = USD 59,500
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
16/19
THE FINAL COST OF
SALT & WATER RECOVERYn The Total annual Additional Cost of
Salt & Water Recovery
= Rs. 8.00 Million = USD 1,80,000n This means finally every T-Shirt costs more
by Rs. 1.77 = USD 0.04
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
17/19
Benefits of this Projectfor the Company
n Meeting the statutory requirements
n Using Glaubers Salt gives better Dyeing Results
n Using Recovered Water gives enhanced Dyeing
Performance in terms of Fastness, Uniformity,Reproducibility and less rejection
n Tackles the Water Shortage problem
n A major step in achieving Zero Liquid Effluent
Discharge
n Satisfying the requirements of SWITCHER &
PREM GROUPS Corporate Social Responsibilities
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
18/19
Benefits of this Projectfor the Environment
n Stops discharging several thousand tons Salt on the
land and water receivers and hence the increase in
the salinity is prevented
n Several thousand tons of salt is Recovered and
Reused
n Stops discharging several million litres of Effluent
n Stops drawing and using several million litres of
water from the nature
n
A major step in implementing SustainableDevelopment Concept
8/14/2019 Frbungsprozess_Salzgehalt und Wasser
19/19