View
212
Download
0
Category
Preview:
Citation preview
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
1/38
NOTICE OF PUBLIC MEETING
ANDNOTICE OF PUBLIC HEARING
CITY OF MENLO PARK PLANNING DIVISION
NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Menlo
Park, California, is scheduled to review the following item:
Study Session for Compliance Review/St. Anton Partners/3605-3639 HavenAvenue: Study session to review the architectural design of a 393 unit, multi-family residential development relative to the design standards and designguidelines of the R-4-S (AHO) (High Density Residential, Special AffordableHousing Overlay) zoning district. The Planning Commission's review is advisoryonly and will be taken into consideration as part of the Community Development
Director's determination of whether the proposal is in compliance with the R-4-Sdevelopment regulations and design standards. The proposal includesapplication of State Density Bonus Law, which provides a density bonus forproviding on-site affordable units and allows modifications to developmentstandards and/or architectural requirements.
NOTICE IS HEREBY FURTHER GIVEN that said Planning Commission will holda public meeting on this item in the Council Chambers of the City of Menlo Park,
located at 701 Laurel Street, Menlo Park, California, on Monday, October 7,2013, 7:00 p.m. or as near as possible thereafter, at which time and placeinterested persons may appear and be heard thereon. If you challenge this itemin court, you may be limited to raising only those issues you or someone elseraised at the public hearing described in this notice, or in written correspondencedelivered to the City of Menlo Park at, or prior to, the public hearing.
The project file may be viewed by the public on weekdays between the hours of7:30 a.m. and 5:30 p.m. Monday through Thursday and 8:00 a.m. to 5:00 p.m. onFriday, with alternate Fridays closed, at the Department of CommunityDevelopment, 701 Laurel Street, Menlo Park, California. Please call RachelGrossman, Associate Planner, at (650) 330-6737 or email her atrmgrossman@menlopark.orgif you have any questions or comments.
mailto:rmgrossman@menlopark.orgmailto:rmgrossman@menlopark.orgmailto:rmgrossman@menlopark.org7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
2/38
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2 9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
69'-4"
83'-8"
111'-4"
84'-10"
22'
7'
16'-
6"
8'-6"
10'
10'
10'
10'
2'-7"
2'-5"
4'-2"
30'-11"
40'
50'
55'
48'
76
'
2'-8"
18'
8'-6"
5'
16'-6"
8'-6"
92'-7"
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
CONCEPTUAL SITE PLAN A0 25 5
4 Story Building with TuckUnder Parking
Project Entry
HavenAvenue
Amenity With Units Above
4 Story 'Wrap' Building
40' Ingress/EgressP.U.E. & Sewer
Pool Building
Secondary Ingress/Egress
Transformer, typ.
Trash Staging Area, typ.
Trash StagingArea, typ.
Move In/Trash Staging
Shuttle Stop
Parking Structure, refer toBuilding Plans for enlargedplans
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
3/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
Key Map n.t.s.
1. Front Elevation
South
0 8 16
2. Right Elevation
East
1
BUILDING A ELEVATIONS A0 8 16
Material Legend1. 20/30 Stucco
2. 30/30 Stucco
3. Wood-like Siding
4. Metal Railing
5. Vinyl Window
*note: 3' Window Sill, Typ.
6. Metal Deck Edge
7. Wood Post
8. Metal Trim
9. Metal Storefront System
10. Metal Awning
11. Decorat ive L ight Fixture
12. Metal Garage Door
13. Garage Entry Gate
14. Mechanical Screening- Me
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
4/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
Key Map n.t.s.
0 8 16
2
BUILDING A ELEVATIONS A0 8 16
1
1. Rear Elevation
North
2. Left Elevation
West
Material Legend1. 20/30 Stucco
2. 30/30 Stucco
3. Wood-like Siding
4. Metal Railing5. Vinyl Window
*note: 3' Window Sill, Typ.
6. Metal Deck Edge
7. Wood Post
8. Wood-like Trim
9. Metal Storefront System
10. Metal Awning
11. Decorat ive Light Fixture
12. Metal Garage Door
13. Garage Entry Gate
14. Mechanical Screening- Me
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
5/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
Key Map n.t.s.
0 8 16
BUILDING B ELEVATIONS A0 8 16
1. Front Elevation
South
2. Right Elevation
East
Material Legend1. 20/30 Stucco
2. 30/30 Stucco
3. Wood-like Siding
4. Metal Railing5. Vinyl Window
*note: 3' Window Sill, Typ.
6. Metal Deck Edge
7. Wood Post
8. Metal Trim
9. Metal Storefront System
10. Metal Awning
11. Decorat ive Light Fixture
12. Metal Garage Door
13. Garage Entry Gate
14. Mechanical Screening- Me
2
1
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
6/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
Key Map n.t.s.
0 8 16
2
BUILDING B ELEVATIONS A0 8 16
1
1. Rear Elevation
North
2. Left Elevation
West
Material Legend1. 20/30 Stucco
2. 30/30 Stucco
3. Wood-like Siding
4. Metal Railing5. Vinyl Window
*note: 3' Window Sill, Typ.
6. Metal Deck Edge
7. Wood Post
8. Metal Trim
9. Metal Storefront System
10. Metal Awning
11. Decorat ive Light Fixture
12. Metal Garage Door
13. Garage Entry Gate
14. Mechanical Screening- Me
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
7/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811916.400.2072
08.22.2013
KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
Key Map n.t.s.
0 8 16
BUILDING C ELEVATIONS A0 8 16
1
1. Front Elevation
South
2. Right Elevation
East
4. Rear Elevation
North
3. Left Elevation
West
3
4
Material Legend1. 20/30 Stucco
2. 30/30 Stucco
3. Wood-like Siding
4. Metal Railing5. Vinyl Window
*note: 3' Window Sill
6. Metal Deck Edge
7. Wood Post
8. Metal Trim
9. Metal Storefront Sys
10. Metal Awning
11. Decorative Light Fixt
12. Metal Garage Door
13. Garage Entry Gate
14. Metal Trash Rol l-up
15. Mechanical Screenin
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
8/38
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
UP DN
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
RAMP
DOWN
268'-0"
Garage Level 149 Parking Stalls
P0P0
P0
P2F
P2F
P2F
P2D P2D
P1F
P2D
P1C
P1C
P1C
P1C
P1B
P1B
Elec.
Mailroom
Amenity
P2D
Trash
Lobby
8'-6"
Typ.
17'-6"
Typ.
23'-0"
Typ.
440'-1"
Amenity
P1F
5
4
7
13
11
Maintenance
Stor.
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV EV EV
5
4
17' - 6" 23' -0" 17'- 6" 17' -6" 17' -6"23'- 0"1'- 0"1'- 0" 1' -0"
UP DN
AIRSHAFT
AIRSHAFT
AIR
SHAFT
AIRSHAFT
RAMPUP
RAMPUP
RAMP
DOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 1 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
9/38
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
9/2
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
UP
DN
343'-11"
P0
P2F
P2D
P2D
P1C
P1C
P1C
P1C
P1CP1C
P1C
P1C
P1C
P1C
P1B
P1B
P1B
P1BP1B
P1B
P2B
Bike Storage - 190 Spaces
Elec.
Elec.
Mailroom
Amenity
440'-1"
Lobby
Amenity
Trash
Amenity
P1F
EV
EV
5
4
17'- 6" 23'- 0" 17'- 6" 17'- 6" 17'- 6"23'- 0"1'- 0"1'- 0" 1' -0"
UP DN
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAMPUP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 1 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
10/38
UP DN
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
RAMP
DOWN
Open to
Below
Garage Level 266 Parking Stalls
268'-0"
P0P0
P0
P2F
P2F
P2F
P2D P2D
P2D
P2D
P2D
P1C
P1C
P1C
P1B
P1B
P2B
pen o
Below
P2D
Lobby
Trash
8'-6"
Typ.
17'-6"
Typ.
23'-0"
Typ.P1C
440'-1"
7
14 13 13 14
5
Storage
Storage
UP DN
17'- 6" 2 3' -0 " 1 7 '- 6" 1 7 '- 6" 1 7'-6"23'-0"1'-0 "1'-0" 1'-0"
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAMPUP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 2 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
11/38
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
UP
DN
Open to
343'-11"
P0
P2F
P2D
P2D
P2D
P1C
P1C
P1C
P1C
P1CP1C
P1C
P1C
P1C
P1C
P1B
P1B
P1B
P1BP1B
P1B
P2B
P0
P1C
Open to
Below
44
0'-1"
Trash
5
Storage
UP DN
1 7 '- 6" 2 3 '- 0" 1 7' -6 " 17'- 6" 1 7' -6 "23'-0"1'-0 "1'-0" 1'-0 "
AIRSHAFT
AIRSHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 2 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
12/38
UP DN
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
RAMP
DOWN
Garage Level 366 Parking Stalls
440'-1"
268'-0"
P0P0
P0
P2F
P2F
P2FP2D P2D
P2D
P2D
P2D
P1C P2D
P1C
P1C
P1C
P1B
P1B
P2B
P0
P0
P0
P0
P0
P1DP1DP2E
Trash
8'-6"
Typ.
17'-6"
Typ.
23'-0"
Typ.
7
14 13 13 14
5
Storage
Storage
UP DN
17'- 6" 2 3' -0 " 1 7 '- 6" 1 7 '- 6" 1 7'-6"23'-0 "1'-0 "1'-0" 1'-0"
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAMP
UP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 3 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
13/38
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
UP
DN
Fitness
44
0'-1"
343'-11"
P0
P2F
P2D
P2D
P2D
P1C
P1C
P1C
P1C
P1CP1C
P1C
P1C
P1C
P1C
P1B
P1B
P1B
P1BP1B
P1B
P2B
Trash
P0
P1C
P0
P0
P0
P1DP1DP2E
P1C
5
Storage
UP DN
1 7 '- 6 " 2 3 '- 0" 1 7' -6 " 1 7' -6 " 1 7' -6 "23'-0"1'-0 "1'-0" 1'-0 "
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAM
PUP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 3 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
14/38
UP DN
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
RAMP
DOWN
440'-1"
268'-0"
P0P0
P0
P2F
P2F
P2FP2D P2D
P2D
P2D
P1C P2D
P1C
P1C
P1C
P1B
P1B
P2B
P0
P0
P0
P0
P0
P1DP1DP2E
Trash
P2D
8'-6"
Typ.
17'-6"
Typ.
23'-0"
Typ.
7
14 13 13 14
5
Garage Level 466 Parking Stalls
Storage
Storage
UP DN
17'- 6" 2 3' -0 " 1 7 '- 6" 1 7 '- 6" 1 7'-6"23'-0 "1'-0 "1'-0" 1'-0"
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAMPUP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 4 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
15/38
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
UP
DN
Open to Below
440'-1"
343'-11"
P0
P2F
P2D
P2D
P1C
P1C
P1C
P1C
P1CP1C
P1C
P1C
P1C
P1C
P1B
P1B
P1B
P1BP1B
P1B
P2B
Trash
P0
P0
P0
P0
P1DP1DP2E
P1C
Yoga
P2D
P1C
5
Storage
UP DN
17'- 6" 2 3' -0 " 1 7 '- 6" 1 7 '- 6" 1 7'-6"23'-0 "1'-0 "1'-0" 1'-0"
AIRSHAFT
AIRSHAFT
AIRSHAFT
AIRSHAFT
RAMPUP
RAMPUP
RAMPDOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 4 FLOOR PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
16/38
UP DN
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
RAMP
DOWN
Garage Level 596 Parking Stalls
444'-1"
270'-0"
P1DP1DP2E
Roof Access Stair
Flat Roof - Fire Access Throughout
Condenser, Typ.
8'-6"
Typ.
17'-6"
Typ.
23'-0"
Typ.
7x2
1413 8x2 9x2
8
6
7
UP DN
1 7 '- 6 " 2 3 '- 0" 17'- 6" 17'- 6" 1 7' -6 "23'-0"1'-0 "1'-0" 1'-0 "
AIRSHAFT
AIR
SHAFT
AIR
SHAFT
AIRSHAFT
RAMP
UP
RAMPUP
RAMP
DOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners1801 I Street, Suite 200Sacramento, California 95811916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 5 FLOOR PLAN/ROOF PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
17/38
17'-6" 23'-0" 17'-6" 17'-6" 17'-6"23'-0"1'-0"1'-0" 1'-0"
AIR
SHAFT
AIR
SHAFT
RAMP
UP
RAMP UP
UP
DN
Roof Deck -
See Landscape Plan
44
4'-1"
343'-11"
P1DP1DP2E
Roof Access Stair
Roof Access Stair
Flat Roof - Fire Access Throughout
Condenser, Typ.
8
6
7
UP DN
1 7 '- 6 " 2 3 '- 0" 17'- 6" 17'- 6" 1 7' -6 "23'-0"1'-0 "1'-0" 1'-0 "
AIRSHAFT
AIR
SHAFT
AIR
SHAFT
AIRSHAFT
RAMP
UP
RAMPUP
RAMP
DOWN
UP
DN
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING A - LEVEL 5 FLOOR PLAN/ROOF PLAN
80 16
A3
Key -
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
18/38
428'-4"
197'-9"
P1C
125'-5
" P1C
P1C
P1C
P1C
P2D
P2DP2BP2F
P2F P2F
P0
P1B
P1B
Elec. Elec.
Lobby Lobby
Tuck-Under Garage
Trash
Trash
21'-10"
Typ.
10'-1"
Typ.
Mailroom Mailroom
P1C P1CP1CP2DP2D
Stor.Stor.
21'-10"
Typ.
15'-0"
Typ. Bike Storage
122 Total Spaces
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING B - FIRST FLOOR PLAN
80 16
A
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
19/38
428'-4"
197'-9"
P1C
128'-5"
Firewall, typ.
P1C
P1C P1C P1C
P1C
P1C
P2D
P2DP2DP2F
P2F P2F
P0
P2BP1B
P1BOpen to
Below
P1AP1A
P2A
P1B
P1B
P1B
P1B
Trash
Trash
Open to
Below
P2D P1C
P1A P1A P1AP2A P2AP1A
Storage
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING B - SECOND FLOOR PLAN
80 16
A
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
20/38
428'-4"
197'-9"
P1C
128'-5" P1C
P1C P1C P1C
P1C
P1C
P2D
P2DP2DP2DP2F
P2F P2F
P0
P2B
P1B
P1B
P1AP1A
P2A
P1B
P1B
P1B
P1B
P1E P1E
Trash
Trash
P1C
P1A P1A P1A P1AP2A
P2A
P2A
Storage
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013KTGY Group, Inc.Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING B - THIRD FLOOR PLAN
80 16
A
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
21/38
428'-4"
197'-9"
P1C
128'-5" P1C
P1C P1C P1C
P1C
P1C
P2D
P2DP2DP2DP2F
P2F P2F
P0
P2B
P1B
P1B
P1AP1A
P2A
P1B
P1B
P1B
P1B
P1E P1E
Trash
Trash
P1C
P1A P1A P1A P1AP2A
P2A
P2A
Storage
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING B - FOURTH FLOOR PLAN
80 16
A
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
22/38
428'-4"
197'-10"
122'-3"
Roof Access Stair Roof Access Stair
Condenser, Typ.
Flat Roof - Fire Access Throughout
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING B - ROOF PLAN
80 16
A
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
23/38
156'-5"
399'-3"
P3A
P3A
P1B
P1B
P1C P1C
P1C P2DP2DP2D
P2D P2D
P2DP2D
P2D P2D Lobby Lobby
Bike Storage
90 Spaces
Elec.Elec.
Trash
Trash
Tuck-Under Garage
10'-1"
Typ.
21'-10"
Typ.
Mailroom Mailroom
P3A
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING C - FIRST FLOOR PLAN
80 16
A3
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
24/38
156'-5"
402'-3"
P3A
P3A
P3A
P1B
P1B
P1C P1C
P1C P2DP2DP2D
P2D P2D
P2DP2D
P2D P2D
P1G
P1A
P1A
P1C P1C
Trash
Trash
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING C - SECOND FLOOR PLAN
80 16
A3
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
25/38
156'-5"
402'-5"
P3A
P3A
P3A
P1B
P1B
P1C P1C
P1C P2DP2DP2D
P2D P2D
P2DP2D
P2D P2D
P2A
P1A
P1A
P1C P1C
P1EP1E
P2E
Trash
Trash
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING C - THIRD FLOOR PLAN
80 16
A3
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
26/38
156'-5"
402'-5"
P3A
P3A
P3A
P1B
P1B
P1C P1C
P1C P2DP2DP2D
P2D P2D
P2DP2D
P2D P2D
P2A
P1A
P1A
P1C P1C
P1EP1E
P2E
Trash
Trash
Storage
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING C - FOURTH FLOOR PLAN
80 16
A3
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
27/38
145'-1"
402'-5"
Roof Access Stair
Roof Access Stair
Flat Roof - Fire Access Throughout
Condenser, Typ.
MENLO PARK, CALIFORNIAKTGY # 2012-0379St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
BUILDING C - ROOF PLAN
80 16
A3
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
28/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning
17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Bird's Eye Looking North
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
29/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Bird's Eye Lookin
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
30/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Bird's Eye Looking Ea
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
31/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Town Squa
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
32/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Pool Area and Roof
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
33/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Building A at Haven
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
34/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Project Entry
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
35/38
MENLO PARK, CALIFORNIAKTGY # 2012-0379
St. Anton Partners
1801 I Street, Suite 200Sacramento, California 95811
916.400.2072
08.22.2013
KTGY Group, Inc.
Architecture+Planning17922 Fitch
Irvine, CA 92614
949.851.2133ktgy.com
RENDERINGS A
Building A at Entry Drive
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
36/38
9
1
6
6
292'
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
37/38
MENLO PARK, CALIFORNIASt. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
06.05.2013
08.16.2013 2nd SUBMITTAL
MJS Design GroupCannery Lofts
507 30th Street
Newport Beach, CA 92663
(949) 675-9964
0 40'20' 80'
1
2
3
4
5
6
7
8
1
2
3
4
6
7
6
9
8
9
5ROOFTOP TERRACE ENLARGEMENT
Scale: 1/16" = 1'-0"
9
5
6
10
10
10
10
732'
604'
430
'
149'
258'
245'
108'
10
10
10
www.landscapeforms.com Ph: 800.521.2546
Drawing: RG663-01Date: 8/6/2010Dimensionsare inInches[mm]
Bike Rack, Embedded
Product Drawing
SHORT TERM BIKE RACK
N.T.S.10
55'
47'
at BUILDING ENTRIES
11
11
PROPERTY LINE
DIMENSIONS
(TYP.)
7/27/2019 Facetown: Facebook baut eigene kleine Stadt fr Mitarbeiter
38/38
MENLO PARK, CALIFORNIASt. Anton Partners1801 I Street, Suite 200
Sacramento, California 95811
916.400.2072
06.05.2013
08.16.2013 2nd SUBMITTAL
MJS Design GroupCannery Lofts
507 30th Street
Newport Beach, CA 92663
(949) 675-9964
0 40'20' 80'
6' HT. SPLIT FACE BLOCK
4
2
3
1
1
TUBULAR STEEL ENCLOSURE FENCE
Scale: 1/2" = 1'-0"
2
1
TUBULAR
STEELFENCE
4" o.c. MAX.
FENCE POSTS at 8' o.c. MAX.
(COLOR TOMATCH
ARCHRAILINGS)
at 'BACKYARD' POOL
FIRE DEPARTMENT CLEARANCE
TUBULAR STEEL EMERGENCY
VEHICULAR ACCESS SWING GATE
FIRE LANE SIGNAGE
KNOX BOX
EMERGENCY VEHICULAR ACCESS
SWING GATE4
ELEVAT
SCALE:
ADJACENT TUBULAR
STEEL FENCE
6' MIN. HT. DECORATIVE WALL at BACKYARD
(BACK OF SPA WALL AND BBQ COUNTER)
SCALE: 143
40'
DECORATIVE WALL
TILE
ADJACENT TUBULAR STEEL
POOL ENCLOSURE FENCING
SEE DETAIL 2 THIS SHEET.
GLASS ENCLOSURE FENCE
Scale: 1/2" = 1'-0"5
at 'BACKYARD' POOL
5
PERIMETER WALL
Recommended