Group 1 Mappe

Preview:

DESCRIPTION

office building plan

Citation preview

Präsentation BIM

Gruppe 1

Architektur_Lena Gotzl

Tragwerksplanung_Martin Neier

Building Science_Bebe Ivan

Tragstruktur

Aussteifung

Angesetzte Lasten

• Ständige Lasten

• Eigengewicht

• Ausbaulasten

• Fassade

• Variable Lasten

• Nutzlasten

• Intandsetzung

• Schnee

• Wind

Max. Verformungen

Maßgebende Stütze

Stütze: 60 / 25

As,erf = 42,4 cm²

( 8 ø 26 )

STB – Massen lt. FEM Programm

Energy concept

Table of U-values

Area

[m²]

U-value

[W.m-2.K-1]

External walls 7376 0.102

Windows 1196 0.73

Roof 1252 0.188

Ground 332 0.343

Settings

Project

location Wien-Penzing

above sea level [m] 171

cadastral community 14

indoor temperature [°C] 20

heating degree days [Kd] 205

area [m²] 6700

floors 6

Building elementsconstruction Concrete structure

U-Values - range [W.m-2.K-1] 0.102- 0.73

Installations

heating Central

warm water Central

ventilation Mechanical/ natural

lighting Artificial/ daylight

cooling AC/ night

Building

type office

area [m²] 6700

volume [m³] 33437

envelope area [m²] 10156

opaque [m²] 8628

transparent [m²] 1196

against outside [m²] 9824

Heating demand

air change rate [1/h] 6

indoor temperature [°C] 20

outdoor temperature[°C]

-12.6

HWB reference [kWh.m-2.a-1] 12.99

HWB location [kWh.m-2.a-1] 13.19

U-Value average [kWh.m-2.a-1] 0.211

Energy certificate

Class A building

Energy simulation

• all round board shades 0.2 / 1.2 m

• improvement of heating and cooling gains

• natural and artificial ventilations in crucial zones

Heating and Cooling loads

Ventilation concept

• main ventilation fan on the roof

• pipes will be inserted through special chambers

• air that goes in = air that goes out

• Heating, ventilation and air conditioning all together

• fresh air goes in via pipes situated near the windows

Ventilation floor plans

First floor

Ground floor

Ventilation

Ground floor

Upper floor

• each floor will have 4 main fresh air supply/ absorbent pipes

• 0.75 x 2 m is the size of each main pipe

• medium air change rate: 5.81

Illumination

Illumination

First floor

Ground floor

Illumination – ground floor

Isolines

Grayscale Value chart

• led based luminaries

• possibility of manually dimming of

light

• luminance values according to the

norms, even without natural light

Fire safety plans

Ground floor

First floor

Basement

• max area per fire section in normal floor < 1600 m²

• max area per fire section in basement < 800 m²

• exit routes < 40m

Considered aspects: • Assembly points

• Exit routes

• Fire sections

• Staircases

Thank you