18
DoB 11th May 1960; Schweizer Sicherheitsüberprüfung für Bundesstellen seit Dezember 2015 EC National (Austrian); Fluent German & English The type who reads the manuals in advance, relishes the challenges, patiently finds the solutions and leaves behind robust systems with everything working smoothly. Wolfgang Prasch Lobärgstrasse 3 3423 Ersigen Bern +4177 976 18 41 [email protected] T h e t y p e w h o r e a d s t h e m a n u a l s i n a d v a n c e , r e l i s h e s t h e c h a l T h e t y p e w h o r e a d s t h e m a n u a l s i n a d v a n c e , r e l i s h e s

CV Wolfgang.Prasch

Embed Size (px)

Citation preview

Page 1: CV Wolfgang.Prasch

DoB 11th May 1960; Schweizer Sicherheitsüberprüfung für Bundesstellen seit Dezember 2015EC National (Austrian); Fluent German & English

The type who reads the manuals in advance, relishes the challenges, patiently finds the solutions and leaves behind robust systems with

everything working smoothly.

The

typLobärgstrasse 33423 ErsigenBern+4177 976 18 41 [email protected]

WOLFGANG PRASCH

Page 2: CV Wolfgang.Prasch

1. SYNTHESIS

INDUSTRIES Government

Telecoms

Bank

UN

TECHNICAL SKILLS Administration and Support SharePoint 2007/2010/2013

SharePoint 2007/2010/2013 scripted installations and migrations

Designing SharePoint farms for up to 300000 User

Installing and maintaining MSSQL 2005/2008/2012

Design and implement SharePoint Document and Records Management System, SharePoint Blogs, Wikis and custom application integration

Designing InfoPath 2007/2010 forms

Nintex Workflow, SharePoint Designer and Visual Studio Workflows

Active Directory Service design

Creating high and low level design documentation

Supporting a large number of Hardware vendors like Dell, IBM and HP including the individual configuration software and sizing of the server platform for medium to large sites

Covering large and small, standard and non-standard installations, migrations, upgrades clustering and SAN.

Architect, plan, and implement solutions for Disaster Recovery and large Multisite Networks.

Designing and running Training Courses for Users, IT Support Staff, and General Managers, using the Presentation and Public speaking skills.

Showing clear dedication and commitment to individual business objectives and responsibilities and to the group as a whole.

Operating with no supervision in complex environments and taking responsibility for substantial aspects of activities

Page 3: CV Wolfgang.Prasch

MANAGEMENT SKILLS

Project Planning:

PRINCE 2; Risk Management; Resource Management; Time Management; Communication Planning; Project Life Cycle; Cost Control; Quality Management; Change Control

LANGUAGES Languages read written spoken

English Fluent Fluent Fluent

German Fluent Fluent Fluent

Page 4: CV Wolfgang.Prasch

2. TRAININGS / CERTIFICATIONSCertifications:Microsoft MCSE NT4/Exchange 5.5/Exchange 2000Novell CNE/CNI

Busy with SharePoint 2010/13 Certifications

Training skills:Train the Trainer; Effective Speaking; Presentation Skills

Page 5: CV Wolfgang.Prasch

3. PROFESSIONAL EXPERIENCE

25/01/2016 EIDGENÖSSISCHES DEPARTEMENT FÜR VERTEIDIGUNG

Senior Sharepoint Consultant

Planning, Design, Support and Administration of various Sharepoint farms and different Platforms

SearchFarm design and integration

Migrations from 2007 to 2013

SharePoint Systems 2007 2013

OS Version 2012

SQL 2008 und 2012

► Sharepoint und Web Application Support

01/12/2013 – 30/1/2016 SWISSCOM LUZERN

Senior Sharepoint Consultant

Planning, Design, Support and Administration of various Sharepoint farms and different Platforms for Large Enterprise customer (Swiss banks, FINMA Bankenaufsicht, Ikea, Swiss Airline/Lufthansa)

Migrations from 2007 and 2010 to 2013

SharePoint Systems, 2007,2010, 2013

OS Versions 2003,2008,2012

SQL 2008 und 2012

► Sharepoint und Web Application Support

01/11/2011 - 25/05/2013 UNHCR GENEVA

Connect & Collaborate Project

Page 6: CV Wolfgang.Prasch

The Connect & Collaborate Project primary objective was to upgrade the complete infrastructure of UNHCR worldwide. Migrating NDS to AD, Groupwise to Exchange, Desktops from XP to Windows 7, and file shares to SharePoint.

► Microsoft Technical Architect / Technical Project Manager

Designing SharePoint 2010/13 farms for 12k usersSupporting and upgrading farmsSharePoint Infrastructure DesignBI, Portal sites, Forms with workflow, Teamsites designSharePoint AdministrationSQL 2008/2012High and Low Level Design for new Active DirectoryHigh and Low Level Design for Exchange 2010Migration Design (Novell NDS/Groupwise to AD and Exchange 2010)Quest Migration tool design and setupManaging new Win 7 Desktop buildsManaging windows 2008 R2 Server builds

01/04/2012 - 30/011/2012 UNITC GENEVA

Connect & Collaborate ProjectThe primary objective was to implement SharePoint for the organisation

► Senior SharePoint Consultant

SharePoint Roadmap for UNITCSharePoint Farm DesignInfrastructure SharePoint DesignSite DesignScripted Installation of SharePoint FarmNintex and Visual Studio WorkflowInfoPath

01/09/2011 - 30/10/2011 GUNVOR TRADE GENEVA

Global Active Directory Project

The primary objective was to consolidate AD into one global ADExchange 2007 /2010Office relocation project from Houston/Texas to Nassau/BahamasNew SharePoint ProjectVarious smaller projects

► Technical Architect / Project Manager

Page 7: CV Wolfgang.Prasch

Designing SharePoint 2010 farmHigh and Low Level Design for new Active DirectoryHigh and Low Level Design for Exchange 2010SharePoint Infrastructure DesignPortal sites, Forms with workflow, Teamsites designManaging new Win 7 Desktop buildsManaging windows 2008 R2 Server buildsSQL 2008

01/07/2009 - 31/07/2011 T-SYSTEMS/SHELL MALAYSIA

Global and Local Sharepoint Projects

Global and local SharePoint projects for Shell 32/64bit mix 2007 and 2010Responsible for deployment, application deployment and support.

► Senior SharePoint Consultant

Responsible for deployment, application deployment and supportExcel ServicesNintex WorkflowVisual Studio WorkflowInfoPathReporting Services SSRS integrated3rd Party applicationsDesigning InfoPath 2007 and 2010 forms including workflows

01/11/2008 - 30/06/2009 OXFORD COUNTY COUNCIL

SharePoint Learning Platform for Schools 350,000 users

Management of supplier and internal resource to implement the Capita SIMS Learning Gateway for Oxford County Council

► Senior Architect / Technical Lead

SharePoint and Exchange 2007 Implementation for 350.000 user

Designing new Active Directory/DNS for 350.000+

Migrating 100.000 user from First Class Mail to Exchange 2007 via IMAP

Transition from Exchange 2003 to 2007 for 10.000+ user

Page 8: CV Wolfgang.Prasch

Continues Risk Evaluation

Extensive Documentation

05/2008 – 10/2008 CAPITA EDUCATION

► SharePoint Consultant

Plan and design SharePoint infrastructure for up to 500.000 users per location

Installing webparts connecting to mssql2005 (Sims.net)

Installing and configuring Active directory provisioning tool

Sharepoint/Moss Branding using Visual Studio .Net 2008/Sharepoint Designer, Photoshop etc. Using SSL for the published sites

01/2008 – 04/2008 SERCO BELGIUM

► Sharepoint/WSS 2007 Consultant

Designing and installing Moss 2007 and WSS 3.0

This includes various Document Management sites, Team Sites and Portals

With the use of virtual servers - VMware and MS Virtual server

Branding using Visual Studio .Net,, Sharepoint Designer, Photoshop etc.

Page 9: CV Wolfgang.Prasch

Moving and consolidate content from different sites

Creating backup routines using scripting

Publishing Sharepoint intranet sites via ISA 2006

Using SSL for the published sites

Documenting all configurations

Knowledge transfer to local admin

01/2007 – 11/2007 HAMPSHIRE COUNTY COUNCIL

► Senior Consultant

Providing 3rd line support for Exchange and Server/Cluster/SAN.

DR planning, especially the Power down/up to ensure a controlled shutdown of all servers MS Clusters (Exchange and file cluster) for a longer power outage using scripting (VBS and batch).

Planning, designing and testing for the upgrade to Exchange 2007.

Designing and installing Moss 2007 and WSS 3.0

This includes various Document Management sites, Team Sites and Portals Branding using Visual Studio.Net, SharePoint Designer, Photoshop etc.

Moving and consolidate content from different sites

Creating backup routines using scripting

Publishing SharePoint intranet sites via ISA 2006

Using SSL for the published sites

04/2006 – 12/2006 FUJITSU (HM REVENUE & CUSTOMS)

► Technical Design Architect

Low level Design of Active Directory

Page 10: CV Wolfgang.Prasch

Low level Design of new Exchange 2003 Organisation

Low level Design for migrating from NT4 to Windows 2003 using Quest tool

Low level Design for migrating from Exchange 5.5 to Exchange 2003 using Quest tool

Compile an Operations Manual for Support

Process and Procedures for Support

Review on Quest ActiveRoles Server

Design of a support model

02/2006 – 03/2006 EDS (RELIANCE SECURITY)

► Quest Migration and Messenger Analyst

Exchange 5.5 /NT 4 to Exchange 2003 migration of a multi site / multi domain /multi Org environment to the new Windows 2003 AD and Exchange 2003 Cluster configuration. Using Quest tools for the migration Installing and configuring the Quest Migration Tools

11/2005 – 01/2006 MICROSOFT SUPPORT EMEA

► Microsoft Messenger Analyst

Microsoft Exchange Support Exchange 5.5, 2000 and 2003 Exchange Migration Support Small Business Server 2000/2003 Clustering of Exchange Internet Information Services ActiveSync / OMA SharePoint 2003

• Resolving customer issues using the tools and systems available• Completing follow-on actions as appropriate, e.g. dispatch

materials, send communications, escalate problems.• Retain ownership of each case until problem is resolved or

resolution is identified Analytical troubleshooting skills.

Page 11: CV Wolfgang.Prasch

10/2005 – 11/2005 LOGICCMG(CLEANAWAY)

► Microsoft Analyst

Planning the migration of MS SharePoint Server and MSSQL to Clustered San on Windows 2003 with MSSQL 2000

Performing the migration Planning a future way of moving updates from a Development

environment to the Testing and later to the Production Cluster Documenting the new environment

05/2005 – 09/2005 VODAFONE UK (FUJITSU)

► Lead designer

Planning the strategic audit prepare various data sources discover the very large corporate network capture all of the information required to build a full picture of

the Vodafone data centre estate matching to link Logical Servers to Physical Servers

03/2005 – 04/2005 THOMAS COOK UK

► Exchange Consultant

Planning the migration from Exchange 5.5 and 2000 mailboxes to Exchange 2003 using the Microsoft Move Mailbox Tools

Performing the migration in a very small team Installation and configuration of Microsoft Identity Integration

Server

11/2004 – 02/2005 EDS/BARCLAYS UK

► Technical Design Authority

Planning AD for User Migration Migrate User from NT4 Server to Windows 2003 using the Aelita\

Page 12: CV Wolfgang.Prasch

Quest Tool in scripted mode Migration Exchange 5.5 and 2000 mailboxes to Exchange 2003

using the Aelita\Quest Tool in scripted mode Installation and configuration of Microsoft Identity Integration

Server Installation and configuration of Live Communication Server Installation and configuration of Microsoft SharePoint Portal

Server

05/2004 – 1/2004 CAPGEMINI VODAFONE UK

► Technical Design Authority

audit the network, servers, workstation, user, groups… Planning new AD Migration from NT4 to Windows XP Migrate from NT4 Server to Windows 2003

12/2003 – 04/2004 CAPGEMINI ERNST & YOUNG THE COAL AUTHORITY

► Technical Design Authority

audit the network, servers, workstation, user, groups… Planning of AD/ designing all essential infrastructure services (e.g.

DNS, DHCP, E-Mail, ISA Server…) Customized standard server and workstation base build for the

deployment Migration from NT4 to windows 2003 and Exchange 5.5 to

Exchange 2003 using the Quest tool Upgrade of file and print servers /migration of MS SQL 2000

Servers and MS ISA Servers and reconfiguration

05/2002 – 11/2003 SEVERN TRENT WATER INTERNATIONAL (MOD PROJECT) WORKING PARALLEL IN BIRMINGHAM AND MILAN

► Technical Design Authority

Planning, purchasing and implementation of a W2k 10 server

Page 13: CV Wolfgang.Prasch

(cluster SAN W2K) Network, implementing VPN’s and firewall-1, Nokia

Changing from Token Ring to Switched Ethernet, utilising the existing wiring structure Implementing Wireless Network for 50% of the users1 W2k professional and Office xp prof.

Windows 2003 with Exchange 2003 Migration from Exchange 5.5 and Unix Sendmail to Exchange

2003 using the Quest Tool Planning, purchasing and implementation of a W2k 6 server

Network, connecting 3 offices implementing VPN’s and firewall-1, Nokia

300 user, W2k professional and Office xp prof. new installation of Exchange for all user developing a disaster recovery procedure

08/2001 – 04/2002 LEWISHAM TOWN COUNCIL, LONDON

► Systems Analyst for Netware Cluster and SAN

Tuning and Troubleshooting a Netware 5.1 Cluster/SAN installation

NDS health check On call support to help them deal with unexpected problems,

providing a level of expertise they may not have on staff, or cover staffing shortfalls.

Designed and implemented a Disaster Recovery. Training of local staff.

02/2001 – 08/2001 INFINITY I/O READING

► Trainer and Course Developer

Training and developing different levels of Fibre Channel Technology and Storage Area Network Course

Providing the insights and expertise needed to develop best solutions for integrating Fibre Channel and Storage Area Network (SAN) technology

06/2000 – 01/2001 DELL UK BRACKNELL

Page 14: CV Wolfgang.Prasch

► DCSE Trainer for SAN and Clustering

Training Blue-Chip Companies in different European Countries Basic and advanced San, Storage Consolidation and Clustering Fibre Channel technology

02/2000 – 05/2000 NOVELL UK BRACKNELL

► Novell Consultant

Planning, implementation and troubleshooting on all Novell Products, including Netware, Groupwise, Webserver, Bordermanager, and NDS.

08/1999 – 01/2000 COMPAQ DUBLIN

► Enterprise Support

3rd level support by telephone for Hardware related Problems on all Compaq Servers

01/1999 – 07/1999 COMPAQ UK & ASIA

International roll-out Universal Pictures

► Site Project Manager

Centre by centre Netware 5 and Groupwise 5 upgrade Client was Polygram/Seagram/Universal Pictures - project was

one of the world’s largest NDS based networks, synchronising all sites in a worldwide tree directory with the hub in Germany.

Supported from the UK and by BT and Cisco, but the sole expert on-site at 10 centres in Japan, 3 in Hong Kong and one each in most other countries of S.E. Asia.

Dotted line manager for each local team in turn, providing training, expertise and leadership during the technical set up, installation, testing and connection phases.

Page 15: CV Wolfgang.Prasch

Solutions found for a huge number of unexpected problems and special case scenarios (for example large local AS400 mainframes with legacy systems, soon to be retired needing emulation solutions).

1997 – 1999 COMPUTERNETWORKS SOUTHAFRICA

► SENIOR NETWORK TECHNICIAN

1993 – 1997 SYSCOMM (COMPUTER TRAINING)

► Novell and Microsoft Trainer