Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
H o w BIM-lea n in t e g r a tion e n h a n c e s t h e infor m a tion
m a n a g e m e n t p roc e s s in t h e co ns t r uc tion d e sig n
Mollas ale hi, S, Arac hc hi Ra t h n ay ak e M u diya n s el a g e , AP, Abou Mo e m e n, AA, U n d e r woo d, J, Fle min g, AJ, Kula t u n g a, U a n d Co a t e s ,
SP
1 0.2 4 9 2 8/2 0 1 7/01 3 0
Tit l e H ow BIM-lea n in t e g r a tion e n h a n c e s t h e infor m a tion m a n a g e m e n t p roc e ss in t h e cons t r uc tion d e sig n
Aut h or s Molla s al e hi, S, Arac hc hi Ra t h n ayak e M u diya n s el a g e , AP, Abou Mo e m e n, AA, U n d e r w ood, J, Fl e ming, AJ, Kula t u n g a, U a n d Coa t e s , SP
Typ e Confe r e nc e o r Works ho p It e m
U RL This ve r sion is available a t : h t t p://usir.s alfor d. ac.uk/id/e p rin t/43 9 6 9/
P u bl i s h e d D a t e 2 0 1 7
U SIR is a digi t al collec tion of t h e r e s e a r c h ou t p u t of t h e U nive r si ty of S alford. Whe r e copyrigh t p e r mi t s, full t ex t m a t e ri al h eld in t h e r e posi to ry is m a d e fre ely availabl e online a n d c a n b e r e a d , dow nloa d e d a n d copied for no n-co m m e rcial p riva t e s t u dy o r r e s e a r c h p u r pos e s . Ple a s e c h e ck t h e m a n u sc rip t for a ny fu r t h e r copyrig h t r e s t ric tions.
For m o r e info r m a tion, including ou r policy a n d s u b mission p roc e d u r e , ple a s econ t ac t t h e Re posi to ry Tea m a t : u si r@s alford. ac.uk .
mailto:[email protected]
Lack of communication
and coordination
Design changes
Insufficient documentation
Unbalanced sharing of resources
Poor or missing input information
Unreliable decision making
Construction Design
Problems
Systems or tools
Information
People
Policy and
strategy
Information Management
Challenges
HOW BIM-LEAN INTEGRATION ENHANCES THE INFORMATION MANAGEMENT PROCESS IN THE
CONSTRUCTION DESIGN
Identified construction problems that occur during the design process
AuthorsSajedeh MollasalehiAnushka RathnayakeAhmed Aboumoemen
In terms of methodology, the underlying research is conceptual by nature, and is
underpinned by literature review.
can be traced back to the design process due to many decision making processes and major amount of information exchange in
the design process.
The design process has significant impacts on both overall performance and efficiency of the project and on projects’
time and cost.
Effective design managementis critically important to overcome construction problems that are associated with the design process due to
poor design information management. Many construction problems
Identified IM challenges that need to be addressed in order to improve the overall projects efficiency
• Some of the key challenges within the construction design havebeen highlighted in this paper such as lack of communication and coordination, poor or missing input information, design changes.
• This paper identified some of the key IM challenges within the designprocess which have been summarised into four main categories ofsystems or tools, information, people, and policy and strategy.• These challenges have been linked to the construction design
problems and it is believed by the authors that by improving those, the IM will be accordingly improved.• BIM and Lean would enhance IM. It is believed that the
integration of BIM functionalities (i.e. visualisation)with Lean principles (i.e. reduce variability)enable better IM improvement during the
design process.
benefit IM in terms of reducing
problems associated
• BIM and Lean interaction would
construction design
with the IMproblems.
The IM challenges and their relation to the construction design problems