0 REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y COMPRIS LES VOIRIES URBAINES (51,970 km) Route Nationale N°6 - Régions Ouest et Nord-Ouest du Cameroun PLAN D’ACTION DE RECASEMENT (PAR) REPUBLIQUE DU CAMEROUN Paix - Travail - Patrie *************************** Ministère des Travaux Publics REPUBLIC OF CAMEROON Peace - Work - Fatherland *************************** Ministry of Public Works RAPPORT FINAL Septembre 2016 SFG2312 V2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

0

REHABILITATION DE LA ROUTE BABADJOU – BAMENDA

Y COMPRIS LES VOIRIES URBAINES (51,970 km)

Route Nationale N°6 - Régions Ouest et Nord-Ouest du Cameroun

PLAN D’ACTION DE

RECASEMENT (PAR)

REPUBLIQUE DU

CAMEROUN Paix - Travail - Patrie

***************************

Ministère des Travaux Publics

REPUBLIC OF

CAMEROON Peace - Work - Fatherland

***************************

Ministry of Public Works

RAPPORT FINAL

Septembre 2016

SFG2312 V2P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

1

Contenu

LISTE DES SIGLES ET ABREVIATIONS ................................................................................................... 5

RESUME EXECUTIF ....................................................................................................................... 8

1. CONTEXTE GENERAL DU PROJET .......................................................................... 8 2. OBJECTIFS ................................................................................................................... 8 3. LIMITE DES EMPRISES CONCERNEES PAR LES EXPROPRIATIONS ................. 8 4. CATEGORIES POTENTIELLES DE PAP ................................................................... 9 5. EFFECTIFS DES PAP ET TYPOLOGIE DES BIENS PERDUS ................................... 9 6. PROFIL SOCIOECONOMIQUE DES PAP ................................................................ 10 7. METHODES D’ESTIMATION DES COUTS DE COMPENSATION SUIVANT LA

VALEUR DE REMPLACEMENT .............................................................................................. 11 8. STRATEGIE DE CONSULTATION ........................................................................... 11

8.1. Les consultations individuelles............................................................................................................. 118.2. Les consultations collectives ................................................................................................................ 12

9. ACTEURS DE MISE EN ŒUVRE DU PAR ................................................................ 12 10. COUT ET CALENDRIER DE MISE EN ŒUVRE DU PAR ....................................... 12

I- DESCRIPTION DU PROJET...................................................................................................... 15

1.2.1. Situation Administrative ................................................................................................................. 16

Section Urbaine dans la ville de Bamenda ..................................................................................... 22 3.1.1. La libération de l’emprise ............................................................................................................... 253.1.2. La mise en place des installations de chantier ................................................................................... 253.1.3. Les travaux de réhabilitation de la route .......................................................................................... 253.1.4. La construction des ouvrages d’assainissement ................................................................................. 263.1.5. L’exploitation des zones d’emprunts et carrières ............................................................................... 263.3.1. Infrastructures scolaires ................................................................................................................. 273.3.2. Marchés ........................................................................................................................................ 273.3.3. Infrastructure d’approvisionnement en eau potable (AEP) ................................................................. 283.4.1. Les alternatives considérées ............................................................................................................ 29

III- OBJECTIFS DU PAR ........................................................................................................... 30

IV- ETUDES SOCIO-ECONOMIQUES ..................................................................................... 31

5.1. PRESENTATION DE LA METHODOLOGIE UTILISEE POUR REALISER LA

MISSION ................................................................................................................................... 31 5.1.1. Collecte des données secondaires .................................................................................................... 315.1.2. Les consultations individuelles ........................................................................................................ 325.1.3. Les consultations publiques............................................................................................................. 325.1.4. Eligibilite ...................................................................................................................................... 325.1.5. Estimation des pertes et de leur indemnisation .................................................................................. 32

5.2. CATEGORIES POTENTIELLES DE PAP .................................................................... 34 5.3. EFFECTIFS DES PAP ET TYPOLOGIE DES BIENS PERDUS .............................. 34 5.4. PROFIL SOCIOECONOMIQUE DES PAP .................................................................. 35

5.4.1. Caractéristiques démographiques des PAP ....................................................................................... 355.4.2. Caractéristiques socio-économiques des PAP ................................................................................... 36

5.5. CARACTERISTIQUES SOCIALES ET CULTURELLES DES POPULATIONS DE

LA ZONE D’INFLUENCE DIRECTE DU PROJET ........................................................... 39 5.5.1. Religions ....................................................................................................................................... 395.5.2. Us et coutumes .............................................................................................................................. 39

5.6. SYSTEMES FONCIERS TRADITIONNELS ................................................................ 39 5.6.1. Conflits entre les utilisateurs des ressources ..................................................................................... 40

V- CADRE JURIDIQUE ............................................................................................................ 41

VI- PARTICIPATION COMMUNAUTAIRE ............................................................................. 42

Page 3: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

2

7.1 Stratégie utilisée pour assurer la participation des PAP pendant la phase de

préparation du PAR ................................................................................................................. 42

VII- PROCEDURES DE RECOURS : MÉCANISME DE GESTION DES PLAINTES ............... 44

IX- RESPONSABILITES DE MISE EN ŒUVRE DU PAR ............................................................ 45

X- PROGRAMME DE MISE EN ŒUVRE DU PAR ...................................................................... 46

XI- SUIVI ET EVALUATION ........................................................................................................ 47

XII- COUTS ET BUDGET DE MISE EN ŒUVRE DU PAR .......................................................... 49

ANNEXES ...................................................................................................................................... 51

Annexe 1 : Evaluation des cultures dans le Nord-0uest ..................................................................................... 51 Annexe 2 : Evaluation des Nues Propriétés dans le Nord-0uest ........................................................................ 109 Annexe 3 : Etat des biens dans les Bamboutos ............................................................................................... 119 Annexe 4: Etat des constructions dans la Mezam ............................................................................................ 149 Annexe 5 : Termes de référence .................................................................................................................... 155 Annexe 6 : Note méthodologique .................................................................................................................. 161

Page 4: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

3

NUMEROS ET TITRES DES TABLEAUX PAGES

Tableaun° 1: Localités traversées par le projet 16

Tableau n° 2 : Modalité d’estimation des coûts des biens affectés 32

Tableau n°3: Personnes affectées par le projet (effectifs) 34

Tableau n°4 : Gestion des plaintes 44

Tableau n°5 : Responsables de mise en œuvre du PAR 45

Tableau n°6 : Calendrier de mise en œuvre du PAR 46

Tableau n°7 : Processus de suivi interne de la mise en œuvre du PAR 47

Tableau n°8 : Processus de suivi externe 48

Tableau n°9 : Coûts des évaluations 50

Tableau n° 10 : Coût d’indemnisation par catégorie des Biens impactés 51

NUMEROS ET TITRES DES FIGURES PAGES

Figure 1 : Carte administrative de la zone du projet Babadjou-Bamenda 17

Figure 2 : Itinéraire du projet routier 18

Figure 3: Infrastructure scolaire affectées

27

Figure 4: Pk 3+700. Point d'eau aménagé dans l'emprise

28

Figure 5a : Répartition par âge des PAP de Bamenda

35

Figure 5b : Répartition par âge des PAP de Babadjou

36

Figure 6a : Répartition par catégories de professions des PAP de Bamenda

37

Figure 6b : Répartition par catégories de professions des PAP de Babadjou

37

Figure 7a : Répartition des sexes des PAP de Bamenda

38

Figure 7b : Répartition des sexes des PAP de Babadjou

39

Figure 8 : Pk 13+300 : Jubilé Gospel Center 39

NUMEROS ET TITRES DES PHOTOS PAGES

Photo 1 : Virage du carrefour Babadjou (Toumaka) à redresser 19

Page 5: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

4

Photo 2 : Etat avancé de dégradation de la chaussée à Babadjou Pk15 + 500

19

Photo 3 : Santa : cultures proches de l’emprise 19

Photo 4 : Péage de Santa : encombrement des emprises 19

Photo 5 : Arceaux Welcome to Bamenda P.K.00+00 (début Voie de contournement) 20

Photo 6 : Accès riverains débouchant sur l’axe principal (à aménager) 20

Photo 7 : Allure du tracé à partir carrefour GBHS Junction 20

Photo 8 : Tombes situées à proximité de la route 20

Photo 9 : Maison de haut standing à éviter 21

Photo 10 : Etroitesse de la route et présence d’Eucalyptus autour du tracé 21

Photo 11 : Station Total : pompe et panneau à déplacer 23

Photo 12 : Caniveaux obstrués, ruissellement d’eau sur la chaussée 23

Photo : 13 Congestion du trafic à Nkwen 23

Photo 14 : Aperçu général des emprises entre école des champions et Amour Mezam 23

Photo 15 : Encombrement de la voie à Food Market 23

Photo 16 : PK 2+800 Food market Bamenda 28

Photo 17 : Marché de Kombou - Babadjou 28

Photo18 : Consultation à la Mairie de Santa 32

Photo 19 : Consultation à la Mairie de Babadjou 32

Page 6: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

5

LISTE DES SIGLES ET ABRÉVIATIONS

AOIR : Appel d’offres International Restreint

APD : Avant-Projet Détaillé

APS : Avant-Projet Sommaire

BAD : Banque Africaine de Développement

BM Banque Mondiale

CDCE : Commission Départementale de Constat et d’Evaluation

CPEI : Cellule de Protection de l’Environnement et des Infrastructures

EIE : Etude d’Impact Environnemental

ESI : Evaluation Stratégique de l’Impact environnemental

GIC : Croupe d’Initiative Commune

HIMO : Haute Intensité de Main d’œuvre

IST : Infections Sexuellement Transmissibles

MINDCAF : Ministère des Domaines du Cadastre et des Affaires Foncières

MINDUH : Ministère du Développement Urbain et de l’Habitat

Page 7: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

6

DEFINITIONS DES TERMES

Acquisition (forcée ou involontaire) de terre : Le processus par lequel l’Etat peut déclarer

une terre d’utilité publique ; donc le propriétaire ou l’occupant doit nécessairement la quitter pour une

indemnisation. En règle générale, la politique de réinstallation involontaire est déclenchée parce que

l’activité envisagée nécessite une acquisition par l’Etat à travers une déclaration d’utilité publique de

terres occupées ou exploitées par des personnes pour divers besoins ou activités.

Aménagements fixes. Investissements, autres que des constructions, qui ne peuvent pas

être déménagés lorsqu’une parcelle de terre est expropriée. Il peut s’agir d’un puits, d’une

latrine, d’une fosse septique, etc.

Ayants droit ou bénéficiaires : Toute personne affectée par un projet qui, de ce fait, a le droit à une

compensation. Cela n'est pas limité aux personnes qui, dû au projet, doivent

physiquement être déplacées, mais inclue aussi les personnes qui perdent certaines de leurs

possessions (par exemple une partie des terres qu'elles cultivent) ou l'accès à certaines

ressources qu'elles utilisaient auparavant.

Cadre de Politique de Réinstallation (CPR). Le document qui présente les principes qui

guident le développement d’un Plan d’Action de Réinstallation (PAR), une fois que

l’investissement est assez bien défini pour pouvoir déterminer ses impacts.

Commission de Constat et d’Evaluation des Biens (CCE) : Commission chargée au niveau

national, régional ou départemental par acte du Ministre chargé des affaires foncières de choisir et de

faire borner les terrains affectés par le projet, de constater les droits et d’évaluer les biens mis en

cause, d’identifier leurs titulaires et propriétaires et d’indiquer le périmètre de l’opération.

Compensation : Paiement en liquide ou en nature ou les deux combinés des coûts de tous les biens

(terres, structures, aménagements fixes, cultures, arbres, etc.) perdus en total ou en partie à cause

d’une déclaration d’utilité publique. Cette compensation doit être suffisante pour au moins garantir le

maintien du standard de vie antérieur au projet de la personne ou de la population concernée

Coût de remplacement : Pour les maisons et les structures, le coût de remplacement est le

coût d’une structure neuve, sans y déduire le montant de la dépréciation, ni la valeur de

matériaux de l’ancien bâtiment qui seront récupérés pour la construction de la nouvelle

structure. Pour les terres, cultures, arbres et autres biens, le coût de remplacement est la

valeur règlementaire nationale majorée de l’inflation. Toutefois, le coût des cultures varie en fonction

des saisons (plus faible en saison de forte production). Au Cameroun, souvent équivalent au terme

‘impenses.’ Les politiques de la Banque mondiale requièrent que tous les éléments affectés (terre,

structures, etc.) soient compensés à leur coût de remplacement. Le coût de remplacement d’un

élément est équivalent au montant requis pour le remplacer dans son état initial. Puisqu’il n’y a pas,

dans la plupart des pays emprunteurs, de marchés immobiliers bien établis, le coût de remplacement

des structures devrait être égal au coût de construction/achat d’une nouvelle structure équivalente,

sans que ne soit appliquée une déduction ou une dépréciation. La Banque mondiale accepte une

combinaison de compensations autorisées sous les régimes légaux avec d’autres allocations (dont la

terminologie est variable), afin que le total soit égal au coût de remplacement des éléments affectés.

Date butoir, 04 avril 2016 : Les personnes qui se seront installées sur le site du projet après cette

date butoir ne seront pas éligibles comme ayants droits à une compensation. Cela est nécessaire pour

éviter un afflux de population cherchant à bénéficier du projet.

Déplacement forcé ou déplacement involontaire : déplacement d'une population (ou, de

manière plus générale, de personnes) qui est nécessaire pour la réalisation d'un projet. Dans le cas de

Page 8: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

7

projets réalisés par des organisations de l'État, et qui ont un intérêt public justifiant le déplacement (et

l'expropriation) de la population occupant les espaces en question. Au

Cameroun on utilise plutôt le terme recasement.

Enquête de base ou enquête sociale. Le recensement de population affectée par le projet (PAP) et

l’inventaire de leurs biens perdus (terres, structures, autres biens non déplaçables). Dans les cas

d’opérations qui touchent l’économie des PAP ; les enquêtes couvrent aussi les sources de revenus,

les rentes annuelles familières, et d’autres thèmes économiques y relatifs.

Expropriation involontaire. L’acquisition de terrain par l’Etat à travers une déclaration d’utilité

publique ; ce qui implique la perte de terres, structures, autres biens, ou des droits pour la parte des

personnes affectées (voir PAP).

Impense : Evaluation, en termes monétaire des biens immeubles affectés par le projet. Il s’agit du

coût d’acquisition, de réfection ou de reconstruction d’un immeuble susceptible d’être atteint, en

partie ou en totalité, par un projet. Cette évaluation permet une compensation monétaire des biens

immeubles affectés aux ayants droits. Elle doit, en principe, être équivalente aux dépenses nécessaires

à l’acquisition, à la réfection ou à la reconstruction du bien immeuble affecté. Elle pourrait être

assimilée à la « valeur acquise » ou au « coût de remplacement ».

Personne affectée par un projet (PAP) : Toute personne qui est affectée de manière négative par la

prise de terre pour un projet. Cela inclut la perte totale ou partielle, de façon temporaire ou

permanente, de biens, de moyens de production, d'occupations, des ressources utilisées, ou l'accès à

de telles ressources.

Plan d'action de réinstallation (PAR) : Plan détaillé qui décrit et définit tout le processus de

réinstallation d'une population à la suite d'un déplacement forcé. Basé sur les enquêtes sociales ; le

plan technique détaille les mesures à entreprendre quant à la compensation, la relocation et la

réhabilitation économique dans le cadre d’une opération de réinstallation

Politique de déplacement : Texte qui décrit et définit le cadre institutionnel et légal pour les

déplacements forcés et la démarche à suivre dans un tel cas.

Recasement : Voir Déplacement forcé.

Réinstallation involontaire. L’ensemble des mesures entreprises avec l’intention de mitiger les

impacts négatifs du projet: compensation (indemnisation), relocation (recasement), et

réhabilitation économique. Le terme ‘réinstallation involontaire’ est le terme utilisé dans la

Politique Opérationnelle de la Banque mondiale. Il y a plusieurs synonymes qui ont la même

signification : "déplacement forcé ou involontaire", "déplacement et réimplantation forcés",

"déplacement et réinstallation forcés", "réinstallation involontaire ou forcée", "relocalisation" et

‘recasement’

Page 9: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

8

RESUME EXECUTIF

1. CONTEXTE GENERAL DU PROJET

Initialement conçue comme la route de l’unité nationale dans les années 60, la route Bafoussam –

Bamenda et notamment le tronçon Babadjou – Bamenda qui en est un des maillons, assure la liaison

entre les départements limitrophes des Bamboutos et de la Mezam situés respectivement, dans les

parties francophone et anglophone du Cameroun. La section de la route Babadjou-Bamenda est

l’unique lien entre les grandes métropoles du pays et la région enclavée du Nord-Ouest. Elle constitue

également le chainon manquant du corridor allant vers la frontière du Nigéria qui est considéré

comme la plus grande économie de l’Afrique.

Cette route, aménagée depuis les années 80, est aujourd’hui sujette à une dégradation très avancée.

Elle présente de nombreuses zones accidentogènes (zones d’éboulement , étroitesse de la chaussée,

nids de poule, courbes serrées, falaise...).

Le projet de réhabilitation de la route Babadjou – Bamenda a pour but d’améliorer de manière

sensible, l’état du réseau routier structurant et par là, de sécuriser la mobilité des personnes et des

biens. Il vise aussi à créer des conditions favorisant l’amélioration du cadre de vie dans les zones

traversées.

Le Plan d’Action de Réinstallation du projet de réhabilitation du tronçon de la route Babadjou-

Bamenda concerne 502 personnes affectées par le projet. L’essentiel de cet effectif est impacté à

travers les arbres et cultures se trouvant dans les emprises du projet (405 personnes). Les

constructions et autres infrastructures identifiées appartiennent à 70 personnes et représentent 72,74%

du coût global des indemnisations. La programmation de mise en œuvre des activités du PAR prévoit

la fin du paiement des indemnités aux PAP le 15 octobre 2016 soit trois (03) mois avant le démarrage

effectif des travaux prévu le 14 janvier 2017.

2. OBJECTIFS

Les principaux objectifs du présent plan sont :

de decrire le nombre de constructions, de familles, d’activités économiques, ou d’autres biens à

exproprier ;

de décrire les impacts potentiels du projet dus aux déplacements, les types d’indemnisation

consentis avec les personnes affectées et les coûts y afférents ;

de préciser les critères d’éligibilité des Personnes Affectées par le Projet (PAP) et les mécanismes

de règlement des différends et appels ;

de proposer un calendrier d’exécution et de suivi évaluation précisant les responsabilités

organisationnelles, le niveau de participation communautaire, les aménagements envisageables

sur les sites de réinstallation etc.

3. LIMITE DES EMPRISES CONCERNEES PAR LES

EXPROPRIATIONS

Page 10: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

9

En vue de limiter les préjudices pouvant être causés aux populations propriétaires des biens autour du

projet, la bande d’expropriation a été restreinte aux largeurs des différentes plates-formes de

chaussées. Cette bande varie de 10 m à 25 m selon les sections, avec une forte recommandation

d’une part d’exécuter les travaux en demi-chaussée dans les zones habitées et d’autre part d’éviter les

démolitions supplémentaires lors de l’ouverture des déviations temporaires.

Il convient de préciser que conformément à l’ordonnance N°74-2 du 06 juillet 1974 fixant régime

domanial pour les routes nationales et provinciales, l’emprise de la route autour de la Route Nationale

N°6 serait de 40 m de part et d’autre de l’axe existant. Ce qui suggère que cette emprise (80 m au

total) appartient au domaine public et que toutes les installations s’y trouvant le sont de manière

illégale (excepté autour de la section neuve). C’est en application à la politique opérationnelle de la

Banque Mondiale relative aux déplacements involontaires que ces biens ont été considérés et évalués.

Les autres emprises pouvant être sujettes aux expropriations concernent également les affleurements

rocheux exploitables en carrière, les zones d’emprunt latéritiques, les sites potentiels d’installation de

chantier. L’évaluation des biens y présents est faite en phase d’exploitation desdits sites et leur

indemnisation prévue pour être supportée par l’Exploitant.

4. CATEGORIES POTENTIELLES DE PAP

Les PAP peuvent être classées en 2 catégories.

- Les PAP qui perdent définitivement des biens (Nues propriétés, arbres, cultures, constructions)

parmi lesquelles des personnes âgées de plus de 55 ans considéreés comme personnes

vulnérables du troisème âge. Toutes ces personnes recevront une indemnisation conformément

aux résultats des deux commissions de constat et d’évaluation des biens (annexes 1 à 4).

- Les PAP qui seront temporairement affectées pendant les travaux (66 commerçants recensés et

identifiés au food market de Bamenda par la Communauté Urbaine de Bamenda (cf PV en

annexe 4), et approximativement 25 commerçants ambulants recensés à partir des enquêtes

mais non identifiés des marchés de Babadjou et Kombou compte tenu de leur instabilité). Ce

groupe de PAP recevront une assistance à titre de compensation budgétisée dans le cadre du

présent travail.

5. EFFECTIFS DES PAP ET TYPOLOGIE DES BIENS PERDUS

Au total, 507 personnes seront affectées par le projet dont 232 pour la Mezam et 275 pour les

Bamboutos (tableau 1). Par ailleurs, de ces 507 PAP, 221 sont des personnes agées de plus de 55 ans

dont 17 femmes. En prenant en compte le nombre d’habitations repertoriées comme lieux de fixation

des familles, l’on dénombre douze (12) familles dans les Bamboutos et vingt deux (22) dans la

Mezam, soit au total trente quatre (34) familles affectées par le projet. La taille moyenne d’une

famille dans la Mezam est de sept (07) et dans les Bamboutos de six (06) personnes.

Les biens touchés recensés appartiennent essentiellement à des individus et regroupent les nues

propriétés, les cultures/arbres et les constructions (tableau 1). Il est à noter que les biens

communautaires ont également touchés et ceux recensés concernent : la clôture du l’église ‘’Jubilé

Gospel Center‘’ sera d’ailleurs partiellement touchée au Pk 13 +300, la clôture de trois établissements

scolaires (école publique de Babadjou, école des champions et St Frederic Comprehensive High

School à Bamenda),

Page 11: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

10

Tableau n° 1 : Personnes affectées par le projet (effectifs)

TYPES DE BIENS PERDUS EFFECTIFS DE PAP TYPE DE DROIT

BAMBOUTOS

Nues propriétés 02 Titre foncier

Cultures/arbres 245 Droit coutumier

Constructions (maisons,

commerces, hangars et tombes)

28 Titre foncier

Droit foncier

MEZAM

Nues propriétés 25 Titre foncier

Cultures/arbres 165 Droit coutumier

Constructions (maisons,

commerces, hangars et tombes)

42 Titre foncier

Droit foncier

Total 507

Sources : Rapports des Commissions de constat et d’évaluation

La superficie totale concernée dans les Bamboutos est de 25ha87a02ca recouvrant partiellement la

section de la Route Nationale n°6 classée par décret n°85/134 du 04 février 1985 ainsi que deux

terrains immatriculés objets des titres fonciers n°181 et 2100/Bamboutos établis respectivement au

profit des sieurs TCHOFFO jean et TOUOYEM Charles. Les cultures recensées parmi les pertes sont

essentiellement le maïs et le manioc. Les constructions affectées sont douze (12) habitations, treize

(13) commerces, un (01) hangar et trois (03) clôtures.

Dans la Mezam les terres affectées représentent une superficie de 41ha60a40ca. L’examen selon le

type de construction indique qu’il s’agit des clôtures et hangars dans 65,7% des cas dans la ville de

Bamenda. Les maisons constituent 32,4% des installations affectées. Sur la voie de contournement les

maisons ressortent à plus de la moitié des constructions affectées ; les clôtures et tombes (2 tombes au

total) : 21,1% des cas respectivement

6. PROFIL SOCIOECONOMIQUE DES PAP

Groupes de PAP vulnérables :

Les seuls groupes vulnérables recensés sont des personnes agées de plus de 55 ans. En effet, en

dehors du critère de l’âge avancé qui concerne aussi bien la gent masculine que féminine, il n’a pas

été identifié d’autre catégorie de personnes vulnérables. L’analyse de la répartition des PAP de

Bamenda montre que 3% sont âgés de 0 à 25 ans, 62% appartiennent à la tranche d’âge de 25 à 55 ans

tandis que 35% sont des personnes de plus de 55 ans considérées comme vulnérables. Le cas des PAP

de Babadjou montre une figure où 51% sont des personnes vulnérables âgées de plus de 55 ans, 44%

sont âgés de 25 à 55 ans et 5% de 0 à 25 ans.On peut constater qu’une bonne frange des PAP est

constituée de personnes vulnérables de troisième âge.

Suivant la répartition par sexe, 65% des PAP de Bamenda sont de sexe masculin et 35% de sexe

féminin, tandis que 55% des PAP de Babadjou sont de sexe masculin et 45% de sexe féminin.

En plus des indemnisations liées à la perte spécifique de leurs biens, les personnes agées beneficieront

d’une assistance à la réinstallation (aide au déménagement, assistance sanitaire, assistance psycho-

sociale au cours du processus de réinstallation)

Page 12: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

11

Activités prédominantes :

L’agriculture et les activités libérales telles le petit commerce, la couture, la coiffure, la menuiserie et

autres représentent la principale source de revenue pour les PAP des localités cibles où plus de la

moitié de la population active est impliquée. A titre d’exemple, 64% de la population à Bamenda et

63% à Babadjou sont classées dans cette catégorie.

Le secteur agricole occupe 6% des PAP de Bamenda et 30% de Babadjou et leur indemnisation se

fera en espèce. En effet, le CPR précise qu’il n’y aura pas de terre de remplacement.

Les employés des administrations publiques représentent 16% des PAP de Bamenda et 10% de

Babadjou. La classe des ménagères représente quant à elle 15% des PAP de Bamenda et 22% des

PAP de Babadjou. Les retraités représentent 3% à Bamenda et 2% à Babadjou, tandis que 2% des

PAP de Bamenda sont des élèves et étudiants, qui représentent 3% des PAP de Babadjou.

7. METHODES D’ESTIMATION DES COUTS DE COMPENSATION

SUIVANT LA VALEUR DE REMPLACEMENT

1- La méthode d’estimation des actifs utilisée a été celle par sol (nue-propriété) et mises en valeurs,

lesquelles regroupent en l’occurrence, les cultures et les constructions. ;

2- La nue-propriété a été évaluée selon le taux fixé par la mercuriale fiscale en vigueur actualisée au

taux d’inflation et majorée des coûts de transactions. C’est l’equivalent de la valeur de

remplacement qui est le prix actuel du marché;

3- Les cultures et les arbres ont été expertisés selon les barèmes fixés par le Décret régissant

l’évaluation des cultures expropriées pour cause d’utilité publique préalablement actualisés au

taux d’inflation de 4%. C’est l’equivalent de la valeur de remplacement ;

4- Les constructions (maisons, commerces, hangars et tombes) ont été estimées à leur valeur de

reconstruction à neuf établie par l’expert membre de la commission d’enquête d’expropriation,

majorée des frais divers de transactions. C’est l’equivalent de la valeur de remplacement ;

5- La procédure de recours est celle définie par les textes spécifiques sur l’expropriation et

l’indemnisation, et suivant laquelle toutes les requêtes sont préalablement examinées par la

Commission en charge des enquêtes d’expropriation. Pour toute autre requête ne concernant pas

les questions d’eligibilite des PAP ou les valeurs des biens impactes, il existe un autre de

mecanisme de resolution des plaintes gerees par les services du maitre d’ouvrage.

Afin de raffermir l’efficacité des commissions d’enquête administrative et favoriser leur

fonctionnement rationnel suivant les principes sus rappelés, les mesures ci-après relatives à

l’accomplissement des formalités préalables, concomitantes et postérieures aux travaux des

commissions de constat et d’évaluation ont été scrupuleusement respectées.

8. STRATEGIE DE CONSULTATION

8.1. Les consultations individuelles

Des entretiens semi-directifs ont été réalisés en avril 2016 avec les responsables administratifs et

traditionnels des différentes localités notamment les Sous-Préfets et Maires des

arrondissements/communes de Bamenda 1er Bamenda 2ème Bamenda 3ème Santa et Babadjou, les Fons

et/ou leurs représentants dans les villages Akum mile 1 à mile 9, Santa mile 1 à mile 12, Babadjou,

Page 13: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

12

Bachua, bagninia, Kombou, bametougou, bamedousso et le Délégué du Gouvernement auprès de la

communauté Urbaine de Bamenda.

8.2. Les consultations collectives

Trois réunions de consultations publiques ont été organisées à Bamenda, Santa et Babadjou. Elles ont

regroupé 74 participants dont 03 femmes 70 hommes et 01 jeune Les objectifs des travaux ont été

expliqués aux différents responsables et notamment la nouvelle perspective de développement des

infrastructures qui tend à mettre à la disposition des localités riveraines de grands projets nationaux, un

certain nombre d’infrastructures de base.

9. ACTEURS DE MISE EN ŒUVRE DU PAR

La mise en œuvre du PAR sera assurée par divers acteurs dont les missions sont précisées dans le

tableau suivant.

Tableau n°2 : Acteurs de mise en œuvre du PAR

ACTEURS DE MISE EN

ŒUVRE DU PAR

MISSIONS DANS LA MISE EN ŒUVRE DU PAR

MINTP - Supervision

- Mobilisation des ressources

- Suivi

MINDCAF - Préparation des projets de décrets d’expropriation et

d’indemnisation

CCE - Evaluation des biens

- Gestion des conflits

- Payement des indemnisations

Banque mondiale - Appui technique

- Non objection

- Suivi

CAA - Mise à disposition des ressources finnacières

ONG - Assistance-conseil aux PAP

PAP - Participation dans tout le processus

10. COUT ET CALENDRIER DE MISE EN ŒUVRE DU PAR

Le tableau ci-après donne les coûts des indemnisations des biens impactés par département.

Tableau n°3 : Coûts des évaluations

Page 14: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

13

N° DESIGNATION COUTS

I- BAMBOUTOS

1 Nue-propriétés 3 096 600

2 Cultures / arbres 46 185 802

3 Constructions (maisons, commerces, hangars et tombes) 77 595 635

TOTAL I 126 878 037

II- MEZAM

1 Nue-propriétés 41 914 438

2 Cultures / arbres 36 648 929

3 Constructions (maisons, commerces, hangars et tombes) 266 255 332

TOTAL II 345 818 699

TOTAL I + II 472 696 736

Source : Rapports des Commissions de constat et d’évaluation

Le coût global de mise en œuvre du PAR intègre en dehors du coût des indemnisations:

des imprévus dus aux ajustements d’emprises relatifs aux projets d’exécution actualisés de

l’entreprise et à l’assistance aux commerçants ambulants;

l’assistance au déménagement des personnes vulnérables ;

le fonctionnement des deux Commissions de conciliation ;

une évaluation externe après la mise en œuvre du PAR.

Ce coût global est estimé à 572 696 736 FCFA (cinq cent soixante douze millions six cent quatre-

vingt-seize mille sept cent trente-six) qui sera pris en charge par les fonds de contrepartie du projet.

En détaillant ce coût global d’indemnisation par catégories de biens détruits, nous avons :

Tableau n° 4 : Coût d’indemnisation par catégorie de biens détruits (FCFA)

CONSTRUCTIONS (maisons, commerces, hangars et

tombes)

343 850 967

CULTURES/ARBRES 83 834 731

FONCIERS 45 011 038

Sous Total 472 696 736

Fonctionnement des commissions de conciliation 10 000 000

Evaluation externe 30 000 000

Assistance au déménagement des personnes vulnérables 10 000 000

Imprévus 50 000 000

Les activités prises en compte dans le tableau ci-dessous prennent pour référence la date de

transmission des rapports des commissions de constat et d’évaluation des biens au Ministre en charge

des domaines : le 08 août 2016.

Page 15: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

14

Concenrnant les 66 PAP éligibles à une compensation temporaire, il est relevé dans le CPR (section

4.2.2) qu’il sagit de 66 boutiques appartenant à la Communauté Urbaine de Bamenda (démembrement

de l’Etat) qui les loue à des tiers. La Communauté Urbaine de Bamenda qui est en fait la personne

affectée s’est donc engagée à reloger ses locataires dans d’autres boutiques disponibles pendant la

phase de construction.

Tableau n°5 : Calendrier de mise en œuvre

N° ACTIVITES PERIODE RESPONSABLES

1 Signature du décret d’expropriation 22 août au 30 octobre

2016

PM

2 Décaissement des fonds pour paiement des

PAP

22 août au 15 novembre

2016

MINTP/CAA

3 Assistance-conseil aux PAP 22 août au 06 décembre

2016

ONG

4 Paiement des PAP 22 novembre au 05

décembre 2016

CCE

5 Gestion des réclamations Immédiatement après la

tenue de l’atelier de

restitution des résultats

des commissions

d’évaluations des biens

CCE et GRM pour

le projet

6 Evaluation externe pour confirmer que les

PAP ont établi leurs moyens de

subsistance à un niveau égal ou supérieur à

celui avant le début du projet.

A partir du 15 janvier

2018

Consultant/MINTP

Page 16: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

15

I- DESCRIPTION DU PROJET

I.1. CONTEXTE GENERAL DU PROJET

Initialement conçue comme la route de l’unité nationale dans les années 60, la route Bafoussam –

Bamenda et notamment le tronçon Babadjou – Bamenda qui en est un des maillons, assure la liaison

entre les départements limitrophes des Bamboutos et de la Mezam situés respectivement, dans les

parties francophone et anglophone du Cameroun. La section de la route Babadjou-Bamenda est

l’unique lien entre les grandes métropoles du pays et la région enclavée du Nord-Ouest. Elle constitue

également le chainon manquant du corridor allant vers la frontière du Nigéria qui est considéré

comme la plus grande économie de l’Afrique.

Cette route, aménagée depuis les années 80, est aujourd’hui sujette à une dégradation très avancée.

Elle présente de nombreuses zones accidentogènes (zones d’éboulement , étroitesse de la chaussée,

nids de poule, courbes serrées, falaise...).

Conscient de l’enjeu que représentent les infrastructures routières pour la projection du Cameroun

vers son émergence économique d’une part, et compte tenu d’autre part, des risques auxquels sont

exposés les usagers de certaines routes nationales, le Gouvernement s’est fixé pour objectif

d’améliorer la fluidité du trafic, la sécurité routière et les conditions de vie le long de l’axe Yaoundé –

Bafoussam -Bamenda. Le coût du projet routier est estimé à 211,851 milliards de FCFA dont 59,8%

par la BAD, 27,6% par la Banque Mondiale et 12,5% par le Gouvernement du Cameroun. Le

financement de la Banque mondiale sur la section Babadjou – Bamenda (51,970 km) est parallèle à

celui de la BAD qui couvre la section Yaoundé-Bafoussam- Babadjou sur 212 km. Par ailleurs, afin

d'assurer la pérennisation des investissements programmés, ce volet comporte également un projet de

surveillance et d'entretien des ouvrages d'art, des ouvrages de sécurité et du corps de la chaussée par

le mécanisme GENIS (Gestion par Niveau de Service) qui sera financé conjointement par les

ressources nationales et des bailleurs.

Le projet de réhabilitation de la route Babadjou – Bamenda a pour but d’améliorer de manière

sensible, l’état du réseau routier structurant et par là, de sécuriser la mobilité des personnes et des

biens. Il vise aussi à créer des conditions favorisant l’amélioration du cadre de vie dans les zones

traversées.

Les résultats escomptés par la mise en œuvre du projet, sont entre autres :

la réduction du nombre d’accidents de circulation par l’amélioration de la sécurité et de la

géométrie du tracé ;

l’amélioration des conditions générales de vie du fait de l’existence d’une chaussée

confortable et praticable en toute saison ;

la diminution de la durée de voyage, augmentant au passage le volume des échanges

commerciaux d’une part, et entre les Régions du Centre et l’Ouest Cameroun et d’autre

part avec le Nord-Ouest et les pays avoisinants comme le Nigéria ;

la réduction généralisée du coût des transports.

Les travaux envisagés ont ainsi pour objectifs d’apporter des solutions pertinentes et viables sur le

long terme pour :

permettre la suppression des zones accidentogènes par des solutions adaptées ;

sécuriser la circulation des piétons et leur permettre d’accéder sans risques à leurs maisons ou

aux services sociaux de base ;

faciliter le bon fonctionnement des transports collectifs ;

prévoir une juste indemnisation des personnes et des biens touchés par les travaux envisagés ;

Page 17: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

16

mieux desservir les marchés situés à proximité, aider à leur structuration, améliorer la qualité

de leur assainissement et de leur environnement.

I.2. ZONE D’IMPLANTATION DU PROJET

1.2.1. Situation Administrative

La route Babadjou-Bamenda est un tronçon de la Route Nationale N°6. Le tracé débute avant le

carrefour Babadjou (précisément à la fin de la section réhabilitée en 2013 par Razel). La route suit le

tracé existant passant par les agglomérations de Kombou, Bachua, Santa, Akum et traverse Bamenda

au niveau des voiries urbaines. (Voir plan de localisation, figure 1).

En relation avec les études techniques, le tronçon a été subdivisé en 3 sections (voir figure 2) :

Section 1: Babadjou –Wellcome to Bamenda: 35,050 km ;

Section 2 dite voie de contournement : 5,100 km;

Section Urbaine : 11, 820 km.

Le tronçon Babadjou-Bamenda qui constitue le projet est à cheval entre deux départements : le

département des Bamboutos et celui de la Mezam. Il traverse cinq arrondissements à savoir :

Babadjou, Santa Bamenda I, Bamenda II et Bamenda III. La carte de localisation du projet est

présentée à la page suivante.

A Bamenda, le projet transitera par les 3

arrondissements de la ville :

Bamenda I, où une voie de

contournement est projetée à Bamenda

Nkwen ;

Bamenda III, au niveau du carrefour

Amour Mezam junction en direction de

Finance junction ;

Bamenda II, dans sa phase terminale au

niveau de Hospital Round-About, T-

junction et Veterinary junction.

Tableau n°1: Localités traversées par le projet

Départements Arrondissements

Bamboutos

Mbouda

Batcham

Galim

Babadjou

Mezam

Santa

Bamenda I, II et

IIIème

Bafut

Tubah

Bali

La maîtrise de ce découpage administratif est déterminante pour le choix des membres et la définition

des responsabilités institutionnelles dans le mécanisme de règlement des différends et des recours.

Page 18: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

17

Figure1 : Localisation administrative de la zone du projet Babadjou-Bamenda

Page 19: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

18

Figure 2 : Itinéraire du projet routier

Itinéraire du projet

Page 20: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

19

I.3. DESCRIPTION DU LINEAIRE DES EMPRISES

SECTION 1 : BABADJOU – WELCOME TO BAMENDA

Cette section longue de 35,050 km débute à Babadjou (Pk 0 : vers le carrefour Bafanga), traverse les

agglomérations de Kombou, Santa, Akum et s’arrête à l’entrée de la ville de Bamenda au niveau du

lieu- dit Chek-point ou Welcome to Bamenda.

L’ensemble de l’itinéraire de la route Babadjou –Bamenda est constitué d’une chaussée à 2 x 1 voies,

d’une largeur variant entre cinq (05) mètres et sept (7) mètres, avec des accotements d’une largeur

variant d’un (1) mètre à deux (2) mètres par endroits. Le tracé est marqué par plusieurs carrefours

avec les accès (ou intersections) qui desservent plusieurs villages. L’on observe l’inexistence de la

signalisation routière sur presque la totalité de l’itinéraire.

C’est une route fortement dégradée. On note l’apparition de plusieurs zones de fortes déformations

des couches supérieures de la chaussée, ainsi que plusieurs nids de poule, particulièrement dans les

zones inondées.

Sur la section Babadjou-Welcome to Bamenda, le projet a été conçu sur les emprises suivantes:

du PK 0+00 (Babadjou) au PK 15+00 (Péage Santa) : 25 m (12,5 m x 2);

du Pk 15+00 au Pk 17+100 : 18 m (9 m x 2);

du Pk 17+100 à Wellcome to Bamenda (Pk 35+050) : 10m (5 m x 2);

Photo 1 : Virage du carrefour Babadjou (Toumaka) à redresser

(Cliché Foyet, mars 2016)

Photo 2 : Etat avancé de dégradation de la chaussée à

Babadjou Pk15 + 500 (Cliché Foyet, mars 2016)

Photo 3 : Santa : cultures proches de l’emprise Photo 4 : Péage de Santa : encombrement des emprises

Page 21: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

20

SECTION 2 : VOIE DE CONTOURNEMENT

Cette section longue de 5,100 km est une route en terre qui part du Monument des arceaux Welcome

to Bamenda (quartier Ntanche PK 0+000), passant, par Moyo-corner, Mendakwè, le domaine du

Campus St Louis et prend fin à l’école des champions Pk fin (5+100). Selon les riverains, Il s’agirait

de l’ancien tracé de la voie d’accès à la ville de Bamenda qui avait été abandonné au profit de la route

actuelle qui passe par Up Station.

La route existante est large en moyenne de 5 m. Le tracé est caractérisé par la présence de quelques

habitations, cultures, réseaux (CAMTEL-CDE-ENEO), et cimetière situés à proximité du tracé et qui

méritent d’être sécurisés. En effet, des canalisations d’eau potable sont visibles parfois au niveau des

talus érodés, ou traversant les ouvrages d’assainissement. Elles seraient connectées à la station de la

Camerounaise des Eaux (CDE) qui se trouve au niveau du carrefour Akoumbelle au Pk 2+300.

Autour de cet itinéraire, on observe également des bornes au sol qui matérialisent des parcelles

foncières quand bien même celles-ci ne sont pas exploitées. Ce qui suggère que les acquisitions

foncières au profit du projet estimées à 25 ha 87 a 02 ca pour tout le projet feront l’objet

d’indemnisation. On note par ailleurs que, quelques maisons pourraient être touchées par le projet tout

comme certains arbres (eucalyptus, manguiers, raphia, pins…) et quelques cultures. Des maisons

construites en haut standing sont nombreuses au début et vers la fin du tronçon, elles seront évitées

dans la mesure du possible pour éviter des conflits fonciers importants avec le projet.

Le projet ici est conçu en tracé neuf avec une chaussée de 2x2 voies et emprise totale de 18 m (9 m x

2). C’est la section qui enregistre le plus grand nombre de biens touchés.

Photo 5 : Arceaux Welcome to Bamenda P.K.00+00 (début

Voie de contournement) (Cliché Foyet, mars 2016)

Photo 6 : Accès riverains débouchant sur l’axe principal (à

aménager) (Cliché Foyet, mars 2016)

Photo 7 : Allure du tracé à partir carrefour GBHS Junction

(Cliché Foyet, mars 2016)

Photo 8 : Tombes affectées situées à proximité de la route

(Cliché Foyet, mars 2016)

Page 22: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

21

Photo 9 : Maison de haut standing à éviter (Cliché Foyet,

mars 2016)

Photo 10 : Etroitesse de la route et présence d’Eucalyptus

autour du tracé (Cliché Foyet, mars 2016)

Page 23: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

22

Section Urbaine dans la ville de Bamenda

Cette section bitumée qui traverse la ville de Bamenda constitue un chainon manquant du corridor

Bamenda-Mamfe-Enugu. Longue de 11,810 km, elle part de l’école des Champions à Hospital Round

About passant par Amour Mezam et Vetenary Junction. Les repères traversés sont respectivement :

Les caractéristiques de la route varient considérablement d’une rue à l’autre (route bitumée ou en

pavées, largeur variant de 7 à 16 m…) avec une moyenne de 12 m. Entre l’Ecole des Champions et

l’Agence de voyage Amour Mezam, la route a les caractéristiques d’une 2x2 voies et présente

quelques nids de poules. C’est la section la moins dégradée et le quartier résidentiel où il n’existe

presque pas d’activités avant le carrefour Amour Mezam.

Dans les zones fortement dégradées, notamment à la traversée des zones commerciales de Nkwen,

Vetenary Junction, Food Market, la couche de roulement présente en effet des signes d’usure

significatifs et d’importantes fissures longitudinales, auxquels s’ajoutent de nombreuses zones de

faïençage. La largeur des accotements qui encadrent la chaussée lorsqu’elle existe, est de l’ordre d’un

(1) mètre. Les cours d’eau en milieu urbain sont des lieux de dépôts d’ordures ménagers et

commerciaux ; ce qui est à l’origine du dysfonctionnement des ouvrages hydrauliques.

Dans ces zones, les emprises sont anormalement encombrées par des activités socioéconomiques

diverses, à l’origine du congestionnement du trafic. La traversée de Food Market est une zone critique

car le marché s’étend en bordure de la route à cause des vendeurs à la sauvette, ce qui génère les

arrêts fréquents des usagers sur la chaussée. Celle-ci sert aussi de lieu de dépôt de bacs à ordures

d’Hysacam, favorisant l’insalubrité de l’environnement. C’est aussi le lieu de stationnement des

motos-taxis, ce qui explique les embouteillages fréquents. Comme relevé dans le paragrapge 4 relatif

aux catégories potentielles des PAP, ces groupes seront pris en charge par la Communauté Urbaine

de Bamenda (Food market)), et la Commune de Babadjou (marchés de Babadjou et Kombou)..

L’on note également la présence des stations-services qui jouxtent la route et dont pour deux d’entre

elles, les panneaux publicitaires et éventuellement les auvents nécessiteront d’être reculés. Aucune

compensation n’est envisagée dans ce cas.

Plusieurs infrastructures (écoles, églises, centres de santé, échoppes, garage, agence de voyage) et les

barrières de maisons d’habitations sont situées à proximité du tracé et seront sécurisées pendant les

travaux par le renforcement ou la construction des barrières. Les petites infrastructures seront

protégées et non endommagées pendant la construction et s'il y a des dommages, ils seront évalués et

pris en compte dans le cadre de la rubrique imprévus du budget lié à la mise en œuvre du PAR, mais

ne sont pas soumis à une compensation.

Pour limiter les expropriations, le projet en section urbaine prévoit des chaussées en 2x2 voies sur une

plateforme de :

16 m (8 m x 2) de Amour Mezam à City Chemist Round-about; et

17 m (8,5 m x 2) de City Chemist Round-about à Veterinary Junction :

Page 24: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

23

Photo 11 : Station Total : pompe et panneau à déplacer (Cliché Foyet,

mars 2016)

Photo 12 : Caniveaux obstrués, ruissellement d’eau sur la

chaussée (Cliché Foyet, mars 2016)

Photo : 13 Congestion du trafic à Nkwen (Cliché Foyet, mars

2016)

Photo 14 : Aperçu général des emprises entre école des

champions et Amour Mezam (Cliché Foyet, mars 2016)

Photo 15 : Encombrement de la voie à Food Market (cliché Foyet, mars 2016)

1.4. LIMITE DES EMPRISES CONCERNEES PAR LES EXPROPRIATIONS

Food Market

Page 25: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

24

En vue de limiter les préjudices pouvant être causés aux populations propriétaires des biens autour du

projet, la bande d’expropriation a été restreinte aux largeurs des différentes plates-formes de

chaussées. Cette bande varie de 10 m à 25 m selon les sections, avec une forte recommandation d’une

part d’exécuter les travaux en demi-chaussée dans les zones habitées et d’autre part d’éviter les

démolitions supplémentaires lors de l’ouverture des déviations temporaires.

Il convient de préciser que conformément à l’ordonnance N°74-2 du 06 juillet 1974 fixant régime

domanial pour les routes nationales et provinciales, l’emprise de la route autour de la Route Nationale

N°6 serait de 40 m de part et d’autre de l’axe existant. Ce qui suggère que cette emprise (80 m au

total) appartient au domaine public et que toutes les installations s’y trouvant le sont de manière

illégale (excepté autour de la section neuve). Les arrêtés n° 000266/MINDCAF/SG/D1/D14/D141 et

n°000267/MINDCAF/SG/D1/D14/D141 du 04 avril 2016 déclarant d’utilité publique les travaux de

construction du tronçon de route Babadjou-Bamenda respectivement dans le Département des

Bamboutos, Région de l’Ouest et dans le Département de la Mezam, Région du Nord-Ouest specifient

que la CCE determinera l’emprise suivant l’ampleur des travaux par section. C’est en application à la

politique opérationnelle de la Banque Mondiale relative aux déplacements involontaires que ces biens

ont été considérés et évalués.

Les autres emprises pouvant être sujettes aux expropriations concernent également les affleurements

rocheux exploitables en carrière, les zones d’emprunt latéritiques, les sites potentiels d’installation de

chantier. L’évaluation des biens y présents est faite en phase d’exploitation desdits sites et leur

indemnisation prévue pour être supportée par l’Exploitant.

Page 26: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

25

IMPACTS POTENTIELS DU PROJET

3.1. ACTIVITES QUI ENGENDRENT LE DEPLACEMENT DES PERSONNES ET

DES INFRASTRUCTURES

Les différentes activités qui engendrent le déplacement des presonnes et des infrastructures sont ci-

après présentées.

3.1.1. La libération de l’emprise

Sur le principe, la largeur de la chaussée actuelle va varier selon les sections. Le déplacement des

réseaux (CDE, CAMTEL éventuellement) n’est envisagé que si ces derniers sont retrouvés pendant

les dégagements d’emprise. La démarche en vue de la libération s’est faite en tenant compte de la

DUP en tant que cadrage règlementaire, de l’Etude technique qui a précisé le profil en travers type sur

chaque section ainsi que les travaux de la Commission départementale qui a finalement fixé les

emprises à dégager ainsi qu’il suit : 25 m du PK 0+00 (Babadjou) au PK 15+00 (Péage Santa) ; 18 m

du Pk 15+00 au Pk 17+100 ; 10m du Pk 17+100 à Welcome to Bamenda, 18 m de Welcome to

Bamenda à l’Ecole des champions ; 16 m de Amour Mezam à City Chemestry et 17 m de City

Chemestry à Veterenary Jonction. Il s’agira surtout de nettoyer les abords directs de la route pour

traiter les accotements et renforcer l’assainissement.

3.1.2. La mise en place des installations de chantier

En vue de l’installation des bases vie et chantiers, il s’avèrera nécessaire d’obtenir la mise à

disposition de terrains plus ou moins vastes en fonction de la taille des installations envisagées. Elle

concerne les bases de chantier pour le matériel tel que les engins lourds et véhicules, le stockage des

matériaux et autres agrégats, les citernes à carburants, les centrales à béton armé et d’enrobage, etc. En

général, ces installations ne sont pas situées dans l’emprise mais nécessitent des emplacements

appropriés compte tenu de leurs sensibilités spécifiques. D’autre part, pour un linéaire de plus de 50

km, le projet va à coup sûr imposer l’ouverture d’une base vie fixe et des bases mobiles ou

temporaires. Le Plan de Gestion Environnementale et Sociale du Chantier à produire par l’Entreprise

conformément aux prescriptions de la Notice des Clauses Environnementales et Sociales (NCES) en la

matière, précisera les conditions de choix de ces sites en temps opportun et sera soumis à

l’approbation du Maître d’Ouvrage. Etant donné que les bases vie et chantiers sont temporaires, la

mise à disposition du site pour leurs installations se fait de gré à gré entre les entreprises chargées et

les propriétaires riverains concernés en collaboration avec le chef du village.

3.1.3. Les travaux de réhabilitation de la route

De manière générale, l’aménagement de la route comprendra les étapes suivantes :

le dégagement et le nettoyage des emprises (débroussaillage et curage de certains

caniveaux) : ces activites entraineront la destruction des biens situes dans les emprises;

les terrassements : l’apport et l’étalage des matériaux lorsqu’ils ne sont pas arrosés, peuvent

générer des quantités importantes de poussières à l’origine des infections respiratoires pour

les riverains qui y seront exposés ;

la réhabilitation du corps de chaussée : par apport, étalage et compactage des matériaux

suivant les prescriptions techniques (grave latéritique, grave concassé et béton bitumineux).

L’exploitation des sites d’emprunts lateritiques et des carrieres de roches entrainera la

destruction des biens mis en valeur sur ces sites et l’envol des poussieres au niveau des

carrieres.

Page 27: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

26

3.1.4. La construction des ouvrages d’assainissement

En vue d’améliorer l’assainissement de la route, il est envisagé la construction d’ouvrages

supplémentaires et le remplacement des ouvrages insuffisamment dimensionnés ou défectueux, par

des ouvrages en béton armé de plus longue durée de vie. Il est également prévu la réhabilitation des

ouvrages hydrauliques. Ces investissements s’accompagnent le plus souvent des inondations des

habitations et des champs situés au voisinage de la route. Pour limiter ces effets, des exutoires

temporaires seront aménagés pendant les travaux.

3.1.5. L’exploitation des zones d’emprunts et carrières

Les chambres d’emprunts de latérite et les carrières de roche massive, seront exploitées pour avoir des

matériaux de qualité. La latérite pour les remblais et les couches de chaussées, le gravier pour la

fabrication des couches de base, du béton ou des enrobés. L’exploitation des sites d’emprunts

lateritiques et des carrieres de roches entrainera la destruction des biens mis en valeur sur ces sites et

l’envol des poussieres au niveau des carrieres. A cet effet, pour l’ouverture des sites d’emprunt,

l’exploitation des sites existants sera privilégiée ainsi que ceux dont la destruction du couvert végétal

n’affectent pas les mises en valeur (champs, cultures, etc.). Ces carrières ont été identifiées dans

l’EIES et feront l’objet d’EIES spécifiques selon la réglementation nationale en la matière..Il s’agit

de :

La carrière de Bamougoum dans la région de l’Ouest vers Bafoussam,

La carrière de pierre noire de Bamendankwe. Cette pierre est utilisée principalement dans

la construction comme pierre ornementale ;

la carrière de Bamessingue et

la carrière de Baleng.

3.2. IMPACTS SOCIAUX MAJEURS IDENTIFIES

Les activités à mettre en œuvre dans le cadre du projet et les éléments valorisés de l’e nvironnement

permettent de prédire un certain nombre d’impacts parmi lesquels on peut citer :

les expropriations de biens (champs, bâtiments, tombes…) présents dans l’emprise et des conflits

pouvant en résulter ;

la perte potentielle des revenus des PAP ;

la perte potentielle des biens collectifs ;

une forte perturbation de trafic et des activités économiques pendant les travaux, due au relief qui rend

difficile l’ouverture de déviations provisoires ;

l’abattage des arbres plantés le long de la route et à l’intérieur des emprises fixées par les commissions

de constat et d’évaluation des biens ;

la perturbation des services offerts par les réseaux d’eau et d’électricité au moment de leur déplacement

plus spécifiquement à la traversée des agglomérations, des zones de marché et de la section urbaine ;

la perturbation des activités commerciales autour des localités traversées par le tronçon à aménager

(Babadjou, Santa, Kombou et Bamenda) ;

la privation de la disponibilite de l’eau potable dans la zone du projet du fait de l’augmentation de la

turbidité de l’eau des cours d’eau traversés ;

la pertubation des deplacements des populations due a la mise en place des deviations provisoires ;

l’inondation des maisons et des champs situés au voisinage de la route lors de la construtcion des

ouvrages d’assainissement ;

les accidents liés à l’ouverture des sites d’emprunt et des carrières et à la présence des travaux.

Page 28: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

27

3.3. INFRASTRUCTURES PUBLIQUES ET SERVICES SOCIAUX

SUSCEPTIBLES D’ETRE AFFECTES

3.3.1. Infrastructures scolaires

Trois établissements scolaires seront impactés

dans la zone d’influence directe du projet :

L’école publique de Babadjou, L’école des

champions et St Frederic Comprehensive High

School à Bamenda dont les clôtures seront

partiellement touchées.

Par aileurs la proximité de ces établissements

avec la route pose le problème de sécurisation

du flux piéton généré par le déplacement des

élèves vers ces établissements scolaires. Cette

situation est encore plus accrue sur la section

de route entre Babadjou et Bamenda où il

n’existe pas de trottoirs.

Le projet prévoit d’aménager à cet effet une

passerelle pour piétons à Vetenary junction..

3.3.2. Marchés

Les marchés conventionnels et spontanés situés dans l’emprise de la route sont les suivants :

La zone commerciale autour du centre urbain de Babadjou au Pk 1+800

Le marché de Babadjou au PK 4+000

Le marché de Kombou au Pk 11+700

La zone commerciale autour du péage de Santa 15+900

Le Marché de Santa Mile 12, au PK 22+900

Le marché d’Akum

Food market de Bamenda au PK 15+250 de la section urbaine.

Les localités traversées cultivent et commercialisent des produits agricoles. Ainsi, ce sont implantés par

des structures et autres acheteurs (commerçants, grossistes et détaillants). Bien plus, en raison du potentiel

agricole de certains villages, plusieurs commerçants viennent y collecter les produits vivriers et autres

fruits en fonction de la saison.

Ces derniers sont pauvres en équipements : pas de hangars, étals de fortune. Ils sont presque situés sur la

route. En effet, il est difficile de circuler les jours de marché au cours desquels les populations risquent de

graves accidents.

Si les jours de marché sont connus dans certaines régions du pays, ce n’est pas le cas à l’Ouest où la

semaine compte 8 jours et les jours de marchés sont cycliques.

Figure 3: Infrastructure scolaire affectée

Page 29: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

28

Dans le cadre du projet, les marchés actuels doivent être délocalisés ou encore, des hangars

supplémentaires doivent être construits afin de permettre la libération de la chaussée par les commerçants

les jours de marché. Les ralentisseurs de vitesse doivent être construits à l’entrée de ces derniers et des

garde-corps doivent être aménagés pour les isoler de la route.

Photo 16 : PK 2+800 Food market Bamenda Photo 17 : Marché de Kombou - Babadjou

3.3.3. Infrastructure d’approvisionnement en eau potable (AEP)

L’accès à l’eau potable est assure par le reseau CAMWATER, 13 forages dont 03 fonctionnels, 05 puits et

32 bornes fontaines dont 8 fonctionnelles ainsi que des sources amenagées. Une source d’eau aménagée se

trouve au PK 3+700 et constitue un facteur de dégradation de la chaussée.

En raison des difficultés d’approvisionnement en eau rencontrées par les populations riveraines, cette

source ne sera pas détruite par le projet. Cependant, il est prévu d’une part la sécurisation de la source en

vue de limiter les accidents sur les personnes et d’autre part des ouvrages d’assainissement pour drainer les

eaux souillées hors de la chaussée. Aucun puits ou forage ne sera detruit et/ou mis hors service par le

projet. Le déplacement du réseau d’adduction en eau potable est pris en compte dans le volet technique et

avec la participation de la communaute et autorites locaux.

Figure 4: Pk 3+700. Points d'eau aménagés dans l'emprise

3.4. ALTERNATIVES CONSIDEREES DANS LE BUT DE MINIMISER LA

REINSTALLATION

Page 30: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

29

3.4.1. Les alternatives considérées

Sur l’ensemble du linéaire routier, le parti a été pris de ne procéder à des expropriations que dans les cas

d’absolue nécessité : redressement de tracé, déviations de zones de forte pente, etc.

Aussi, en ce qui concerne l’ouverture des sites d’emprunt, l’exploitation des sites existants sera privilégiée

ainsi que ceux dont la destruction du couvert végétale n’affectent pas les mises en valeur (champs,

cultures, etc.).

Quelques sites de carrières en exploitation ont été identifiés dans la zone des travaux. Il s’agit de :

La carrière de Bamougoum dans la région de l’Ouest vers Bafoussam,

La carrière de pierre noire de Bamendankwe. Cette pierre est utilisée principalement dans

la construction comme pierre ornementale ;

la carrière de Bamessingue et

la carrière de Baleng.

Page 31: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

30

III- OBJECTIFS DU PAR

L’étude s’intéresse à la libération des emprises de la route autour de l’itinéraire Babadjou-Bamenda

pouvant entrainer auprès de populations riveraines et notamment les plus vulnérables :

L’acquisition involontaire des terres ;

La destruction de certains biens ;

La perte des sources de revenus ou des moyens d’existence.

C’est pour limiter ces effets négatifs et permettre que les conditions de vie des populations soient

améliorées ou tout au moins maintenues après la mise en œuvre d’un investissement, que la Banque

Mondiale exige des emprunteurs qui recourent à ses financements qu’ils élaborent pendant la conception

des projets un PAR.

La démarche prescrite en matière d’expropriation et de réinstallation des personnes affectées vise donc

à minimiser dans la mesure du possible, la réinstallation involontaire et l’acquisition des terres, en

étudiant toutes les alternatives possibles et viables dans la conception du projet. Cependant dans les

cas où l'acquisition de terres ne peuvent être évitées, les personnes à déplacées doivent : (i) participer à

la planification et la mise en œuvre des programmes de réinstallation ; (ii) être compensées et assistées

dans leurs efforts pour améliorer leurs moyens d'existence et leur niveau de vie, ou du moins les

rétablir, en termes réels, à leur niveau d'avant le déplacement ou à celui d'avant la mise en œuvre du

projet, selon le cas le plus avantageux.

C’est dans cette optique que les principaux objectifs de la présente étude sont :

de recenser le nombre de constructions, de familles, d’activités économiques, ou d’autres biens à

exproprier ;

décrire les impacts potentiels du projet dus aux déplacements, les types d’indemnisation consentis

avec les personnes affectées et les coûts y afférents ;

de préciser les critères d’éligibilité des Personnes Affectées par le Projet (PAP) et les mécanismes

de règlement des différends et appels ;

de proposer un calendrier d’exécution et de suivi évaluation précisant les responsabilités

organisationnelles, le niveau de participation communautaire, les aménagements envisageables

sur les sites de réinstallation etc.

Page 32: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

31

IV- ETUDES SOCIO-ECONOMIQUES

Ces études visaient à

(1) recenser les occupants actuels de la zone affectée pour établir une base

pour la conception du PAR et pour éviter que d’autres personnes non concernées ne revendiquent

ultérieurement la compensation due au déplacement involontaire ;

(2) définir les caractéristiques générales des ménages à déplacer, y compris une description des systèmes

de production, du travail et de l’organisation des ménages, l’information de base sur les besoins

d’existence comprenant les niveaux de production et les revenus issus des activités économiques formelles

et informelles ainsi que le niveau de vie en général y compris la situation sanitaire de la population

affectée ;

(3) faire l’inventaire des biens des ménages déplacés, évaluer l’importance de la perte

prévue - totale ou partielle – de l’individu ou du groupe et l’ampleur du

déplacement, physique ou économique ;

(4) collecter l’information sur les groupes ou les personnes vulnérables pour qui des

dispositions spéciales peuvent être prises ;

(5) identifier les questions relatives aux différents statuts fonciers dans la zone du projet.

5.1. PRESENTATION DE LA METHODOLOGIE UTILISEE POUR REALISER LA

MISSION

La préparation du PAR a reposé sur la réalisation des activités suivantes:

collecte et traitement des données secondaires ;

réalisation d’une enquête auprès des ménages affectés ;

inventaire des biens collectifs et/ou individuels touchés ;

recensement des populations affectées ; et

consultations publiques auprès des PAP, y compris des autorités ;

l’exploitation des rapports et proces-verbaux des deux Commissions de Constat et d’Evaluation

des biens des départements de la Mezam et des Bamboutos.

5.1.1. Collecte des données secondaires

La collecte de données secondaires a été la première étape ; elle a consisté à recueillir les informations

existantes relatives au milieu humain dans le projet du PAR realisé en avril 2016, et les rapports des

Commissions départementales de constat et d'évaluation des Bamboutos et de la Mezam.

Les catégories potentielles des PAP et le profil socioéconomique qui sont présentés ci-dessous de manière

partielle sont issus de l’analyse des rapports des commissions de constat et d’évaluation des biens.

Page 33: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

32

5.1.2. Les consultations individuelles

Des entretiens semi-directifs ont été réalisés en avril 2016 avec les responsables administratifs et

traditionnels des différentes localités notamment les Sous-Préfets, les Maires, les Fons ou leurs

représentants et le Délégué du Gouvernement auprès de la communauté Urbaine de Bamenda.

5.1.3. Les consultations publiques

Trois consultations publiques ont été organisées à Bamenda, Santa et Babadjou. Elles ont regroupé 74

participants dont 03 femmes, 70 hommes et 01 jeune. Les objectifs des travaux ont été expliqués aux

différents responsables et notamment la nouvelle perspective de développement des infrastructures qui tend

à mettre à la disposition des localités riveraines de grands projets nationaux, un certain nombre

d’infrastructures de base.

Photo18 : Consultation à la Mairie de Santa Photo 19 : Consultation à la Mairie de Babadjou

5.1.4. Eligibilite

L’éligibilité des personnes à l’indemnisation s’est basée sur les critères définis dans le CPR. Ces critères

ont été élaborés conformement aux dispositions de la règlementation camerounaise et à la Directive

opérationnelle 4.12 de la Banque mondiale. La date butoir a été fixée au 04 avril 2016 qui correspond à la

date de signatures des deux déclarations d’utilité publique.

5.1.5. Estimation des pertes et de leur indemnisation

La méthodologie d’évaluation des pertes présentée dans le tableau 5 ci-après a permis de déterminer le

coût de remplacement de celles-ci.

Tableau n°2 : Modalité d’estimation des coûts des biens affectés

BIENS AFFECTES METHODES D’ESTIMATION DES COUTS

La nue-propriété Le paiement du prix du lot de terrain et du coût de son

enregistrement et de son immatriculation

L’évaluation des coûts de terrain a été faite sur la base de la

mercuriale de 2014 majorée de 4%.

Page 34: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

33

BIENS AFFECTES METHODES D’ESTIMATION DES COUTS

Les cultures et

arbres

Les cultures et

arbres pérennes

Le coût de compensation est celui de la culture selon le barème

réglementaire de 2003 ajusté d’un taux d’inflation de 4%

globalement pour la période 2003 à 2016 conformément à la

note méthodologique préalable au travail des deux CCE (cf

annexe 6).

Paiement de l’équivalent du revenu perdu entendu ici comme

manque à gagner à cause de la perturbation de la production

(revenu perdu pendant la période du déménagement et de la

réinstallation + revenu perdu pendant la période d’attente de la

nouvelle première production calculé sur la base de l’indice

des coûts de produits alimentaires sur les marchés)

Les cultures non

pérennes

Le coût de compensation est celui de la culture selon le barème

réglementaire de 2003 ajusté d’un taux d’inflation de 4%.

Paiement de l’équivalent du revenu perdu entendu ici comme

manque à gagner à cause de la perturbation de la production

(revenu perdu pendant la période du déménagement et de la

réinstallation + revenu perdu pendant la période d’attente de la

nouvelle première production calculé sur la base de l’indice

des coûts de produits alimentaires sur les marchés)

Les constructions (habitations,

commerces, hangars, clôtures, tombes)

Valeur de reconstruction à neuf établie par l’expert membre de

la commission d’enquête d’expropriation, majorée des frais

divers de transactions ;

66 commerçants

identifiés au food

market de

Bamenda, et

approximativement

25 commerçants

ambulants non

identifiés des

marchés de

Babadjou et

Kombou

La Communauté urbaine de Bamenda agissant en tant que

démembrement de l’Etat a pris sur elle la responsabilité des

PAP temporaires qui sont ses locataires.

La Communauté urbaine de Bamenda et la Commune de

Babadjou seron fortement impliquées dans le processus

d’information et de sensibilisation de ces groupes de PAP

quant aux restrictions qu’elles subiront.

Afin de raffermir l’efficacité des commissions d’enquête administrative et favoriser leur fonctionnement

rationnel suivant les principes sus rappelés, des mesures relatives à l’accomplissement des formalités

préalables, concomitantes et postérieures aux travaux des commissions de constat et d’évaluation (voir

annexe 5) ont été scrupuleusement respectées.

Page 35: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

34

5.2. CATEGORIES POTENTIELLES DE PAP

Les PAP peuvent être classées en 2 catégories. - Les PAP qui perdent définitivament des biens (Nues propriétés, cultures, constructions)

- Les PAP seront temporairement affectés pendant les travaux (66 commerçants identifiés au food market

de Bamenda, et approximativement 25 commerçants ambulants non identifiés des marchés de Babadjou

et Kombou).

5.3. EFFECTIFS DES PAP ET TYPOLOGIE DES BIENS PERDUS

Au total, les personnes affectées par le projet sont au nombre de 507 soit 232 pour la Mezam et 275 pour

les Bamboutos ainsi réparties dans le tableau 3.

Tableau n° 3 : Personnes affectées par le projet (effectifs)

TYPES DE BIENS PERDUS EFFECTIFS DE PAP TYPE DE DROIT

BAMBOUTOS

Nues propriétés 02 Titre foncier

Cultures/ arbres 245 Droit coutumier

Constructions (maisons, commerces,

hangars et tombes)

28 Titre foncier

Droit foncier

MEZAM

Nues propriétés 25 Titre foncier

Cultures /arbres 165 Droit coutumier1

Constructions (maisons, commerces,

hangars et tombes)

42 Titre foncier

Droit foncier

Total 507

Sources : Rapports des Commissions de constat et d’évaluation

La superficie totale affectée dans le département des Bamboutos est de 25ha, 87a, 02ca recouvrant

partiellement la section de la Route Nationale n°6 classée par décret n°85/134 du 04 février 1985 ainsi que

deux terrains immatriculés objets des titres fonciers n°181 et 2100/Bamboutos établis respectivement au

profit des sieurs TCHOFFO jean et TOUOYEM Charles.

Les cultures recensées parmi les pertes sont essentiellement le maïs et le manioc.

Les constructions affectées sont des maisons et des hangars.

1 Toutes les PAP ayant les mises en valeur liées aux cultures/arbres ne sont pas forcément propriétaires des terres qu’elles exploitent mais, y jouissent plutôt d’un droit coutumier (qui peut être acquis par héritage ou par donation) ; c’est ce qui explique d’ailleurs la différence de chiffres entre les PAP concernées par les nues propriétés et les PAP visées par les mises en valeur. Titre foncier refère au droit foncier.

Page 36: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

35

Dans la Mezam, les terres affectées représentent une superficie de 41ha, 60a, 40ca. L’examen selon le type

de construction indique qu’il s’agit des clôtures et hangars etc dans 65,7% des cas dans la ville de

Bamenda. Les maisons constituent 32,4% des installations affectées. Sur la voie de contournement les

maisons ressortent à plus de la moitié des constructions affectées ; les clôtures et tombes (2 tombes au

total) : 21,1% des cas respectivement

5.4. PROFIL SOCIOECONOMIQUE DES PAP

5.4.1. Caractéristiques démographiques des PAP

Pour des raisons opérationnelles de distinction des bénéficiaires de compensation pour le projet, les PAP

de la zone cibles ont été classées par tranches d’âges de 0 à 25 ans ; de 25 à 55 ans et plus de 55 ans

constituée de personnes du troisième âge considérées dans ce contexte comme vulnérables. A l’issue de

l’enquête démographique, le résumé est présenté par les figures 5a et 5b ci-dessous, qui présentent les

caractéristiques par âge des PAP identifiées dans les maisons touchées.

Figure 5a

Page 37: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

36

Figure 5b

L’analyse de la répartition des PAP de Bamenda montre que 3% sont âgés de 0 à 25 ans, 62%

appartiennent à la tranche d’âge de 25 à 55 ans tandis que 35% sont des personnes de plus de 55 ans

considérées comme vulnérables.

Le cas des PAP de Babadjou montre une figure où 51% sont des personnes vulnérables âgées de plus de 55

ans, 44% sont âgés de 25 à 55 ans et 5% de 0 à 25 ans.

On peut constater qu’une bonne frange des PAP est constituée de personnes vulnérables de troisième âge.

5.4.2. Caractéristiques socio-économiques des PAP

Les caractéristiques socio-économiques reposent essentiellement sur le niveau d’instruction, l’occupation,

l’habitat, la taille d’unité domestique des PAP et la composition des personnes vulnérables.

Classification par secteur d’activité : Les PAP ont été recensées selon la profession qu’ils occupent dans la

société. Il s’agit ici des activités libérales, agricoles, des professions liées à la fonction publique ainsi que

des élèves, des étudiants et des retraités. Les données recueillies ont donc été reportées sur les figures ci-

après.

Page 38: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

37

Figure 6a

Figure 6b

Activités prédominantes :

L’agriculture et les activités libérales telles les petits commerces, la couture, la coiffure, la menuiserie et

autres représentent la principale source de revenue pour les PAP des localités cibles où plus de la moitié de

la population active sont impliquée. A titre d’exemple, 64% de la population à Bamenda et 63% à

Babadjou est classée dans cette catégorie.

Le secteur agricole occupe 6% des PAP de Bamenda et 30% de Babadjou. Les employés des

administrations publiques représentent 16% des PAP de Bamenda et 10% de Babadjou. La classe des

ménagères représente 15% des PAP de Bamenda et 22% des PAP de Babadjou. Les retraités représentent

3% à Bamenda et 2% à Babadjou, tandis que 2% des PAP de Bamenda sont des élèves et étudiants, qui

représentent 3% des PAP de Babadjou.

Page 39: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

38

NOTIFICATIONS :

Les activités commerciales (vendeurs, transporteurs, conducteurs, …) ainsi que les autres activités non-

agricoles (hommes d’affaires, charpentiers, maçons, mécaniciens, couturières, coiffeuses) ont toutes été

regroupées dans le groupe des professions libérales.

Les professions relevant de la fonction publique sont regroupées dans la section Administration Publique.

Analyse de la répartition du genre :

Suivant la répartition par sexe, 65% des PAP de Bamenda sont de sexe masculin et 35% de sexe féminin,

tandis que 55% des PAP de Babadjou sont de sexe masculin et 45% de sexe féminin. Les enquêtes

complémentaires permettront de déterminer le nombre de femmes chefs de ménages, qui pourraient être

éligibles à une aide en qualité de personne vulnérable.

REPARTITION DES PAP DE BAMENDA SELON LE SEXE

HOMMES

FEMMES

Figure 7a A)

Figure 7b

Page 40: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

39

5.5. CARACTERISTIQUES SOCIALES ET CULTURELLES DES POPULATIONS

DE LA ZONE D’INFLUENCE DIRECTE DU PROJET

5.5.1. Religions

Les populations de la zone du projet sont des adeptes de divers courants religieux dont les plus représentés

sont par ordre d’importance, l’Eglise Evangélique du Cameroun (EEC), l’église catholique, l’Eglise

Presbytérienne Camerounaise (EPC), l’Eglise Baptiste Camerounaise (EBC), la mission du plein évangile,

l’église pentecôtiste, les Témoins de Jéhovah et les musulmans.

La clôture du l’eglise ‘’Jubilé Gospel Center‘’ sera d’ailleurs partiellement touchée au Pk 13 +300 et

reconstruite par le projet dans le cadre du contrat de construction.

Figure 8 : Pk 13+300 : Jubilé Gospel Center

5.5.2. Us et coutumes

La religion, les rites traditionnels et les pratiques « mystiques »ont une grande influence sur les rapports

sociaux entre les populations. Les données collectées dans les villages mettent en relief l’existence de sites,

d’arbres (emblématiques et totémiques) et des jours sacrés. Ces arbres sont dotés pense –t-on de « pouvoirs

mystiques » et vénérés pour leurs vertus. Certains dit-on prédisent des évènements heureux ou

malheureux, d’autres sont utilisés pour leur vertu médicinale. Il se dit de ces arbres que lorsqu’une branche

tombe, elle annonce la mort d’un membre de la communauté.

Aucun des sites et arbres sacres n’est situes dans l’emprise de la route.

5.6. SYSTEMES FONCIERS TRADITIONNELS

Dans la zone du projet, en dehors des centres urbains, les terres appartiennent en général au domaine

national. Cependant, les terres sont gérées suivant un régime de droit coutumier ou traditionnel. C’est un

régime de droit naturel où les lois sont tacites et transmissibles de génération en génération. C’est par le

travail qu’on devient propriétaire d’une terre. C’est cette façon de s'approprier les terres qui fixe les droits

des uns et des autres. Parmi ces droits, on peut citer le droit du premier occupant et le droit d’usage.

Page 41: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

40

Selon le système de tenure foncière de la zone du projet, les champs de culture vivrière sont des terrains

communautaires alors que les cultures de rente et les arbres fruitiers occupent des terrains familiaux.

Dans le departement des Bamboutos, les femmes ont acces à la terre aussi bien par droit de succession, que

d’achat. Dans la Mezam, les femmes n’ont pas de droit coutumier sur les terres. Toutefois elles peuvent y

acceder par achat.

Dans la section de la route appartenant au departement des Bamboutos, la plupart des proprietaires terriens

ne disposent pas de titre foncier. En effet, sur les 28 proprietaires recenses, deux seulement disposent d’un

titre foncier chacun. Dans la Mezam, 25 des 42 proprietaires terriens recenses disposent chacun d’un titre

foncier.

5.6.1. Conflits entre les utilisateurs des ressources

Les conflits dans cette zone sont nombreux et de plusieurs types :

Conflits entre agriculteurs et éleveurs du petit bétail dus à la réduction des surfaces de pâturage;

Conflits entre agriculteurs liés à la divagation des animaux domestiques ;

Conflits entre agriculteurs pour l’utilisation de l’espace agricole.

La gestion de ces conflits est assurée en premier ressort par les chefs traditionnels et, en cas de persistance,

par diverses instances d’arbitrage créées par le gouvernement au niveau local (sous-préfecture, préfecture,

gendarmerie, etc.).

Page 42: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

41

V- CADRE JURIDIQUE

Les procédures d’expropriation, d’indemnisation et de réinstallation sont encadrées au Cameroun par un

ensemble de textes juridiques régissant la protection de l’environnement (physique et humain), le foncier,

les expropriations proprement dites, ainsi que les indemnisations y compris la réinstallation involontaire.

Le cadre juridique a été largement décrit dans le CPR et les principaux portent sur le foncier, les

expropriations et les indemnisations.

La zone d’implantation du projet a été définitivement définis par les arrêtés

n°000266/MINDCAF/SG/D1/D14/D141 et n°000267/MINDCAF/SG/D1/D14/D141 du 04 avril 2016

déclarant d’utilité publique les travaux de construction du tronçon de route Babadjou-Bamenda

respectivement dans le Département des Bamboutos, Région de l’Ouest et dans le Département de la

Mezam, Région du Nord-Ouest.

Page 43: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

42

VI- PARTICIPATION COMMUNAUTAIRE

7.1 Stratégie utilisée pour assurer la participation des PAP pendant la phase

de préparation du PAR

Conformément aux exigences de la PO 4.12, l’élaboration de ce Plan d’Action a suivi une approche

participative qui consiste à informer les personnes affectées par le projet des options possibles pour leur

compensation.

Un processus de consultations, tantôt collectives tantôt individuelles, a accompagné de bout en bout, les

différentes étapes d’élaboration de ce PAR. Ce processus a consisté à informer les PAP du projet, à

recueillir leurs avis et préférences sur les choix possibles quant à leur compensation.

Il est apparu de l’avis général que, l’axe routier Babadjou-Bamenda est entièrement dépassé et doit être

reconstruit. Aucune opposition n’a été enregistrée à la réalisation du projet, excepté un chantier de

bâtiment R+2 où les travaux poursuivent leur cours au niveau du Pk 0+650 de la voie de contournement.

Le mauvais état de la route est mal ressenti par les populations qui en subissent les conséquences,

notamment sur la perte de biens et de parents dans les accidents de circulation, le prolongement des temps

de voyage, le ralentissement de leurs activités et leur santé. Le projet en cours appelle une réalisation

rapide pour pallier cette situation qui au fil du temps devient tout à fait intenable sur le terrain.

Chaque riverain du projet concerné par les expropriations a été enquêté pendant la période du 31 mai au 1er

août 2016, ils sont tous informés de la nécessité de libérer les emprises et leurs avis ont été pris en compte.

Le choix des barèmes appliqués a été orienté vers ceux les plus récemment appliqués par le MINDUH du

Nord-Ouest et qui ont apporté satisfaction aux populations.

Pour l’accompagnement des PAP, la Communauté Urbaine de Bamenda continuera les sensibilisations, de

même qu’un Consultant ou ONG indépendant sera mis à disposition par le Maitre d’Ouvrage pour assurer

le suivi du PAR.

7.2 Stratégie proposée pour assurer la participation pendant la mise en œuvre

du PAR

La stratégie proposée à cet effet permet de faciliter la participation des personnes aussi bien au cours

des enqêtes d’expropriation qu’en phase de mise en œuvre du PAR.

Les travaux des commissions chargées de l’enquête d’expropriation ont été suivat les prescriptions de

la note méthodologique en annexe précédés :

1. d’une publicité adéquate, à la diligence des Préfets de la Mezam et des Bamboutos, par

voie d’affichage à la Préfecture, au Service Départemental des Domaines, à la Mairie, à la

Sous-préfecture et à la Chefferie du lieu de situation du terrain ainsi que par tous autres

moyens jugés nécessaires en raison de l’importance de l’opération ;

2. de la communication aux personnes affectées, par tous moyens pertinents laissant trace, du

dossier soumis à enquête publique, des principes devant régir le processus d’expropriation

et d’indemnisation, des options qui leur sont offertes et des droits se rattachant à la

réinstallation involontaire le cas échéant.

Pendant la phase de mise en œuvre, des rencontres d’information seront tenues pendant toute l’opération

de réinstallation avec les différents PAP.

Page 44: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

43

Ces rencontres seront tenues, soit collectivement, soit individuellement, selon la nécessité.

La diffusion des informations et la consultation du public se feront pendant ces réunions.

Les objectifs de cette campagne d’information sont les suivants :

Susciter l’adhésion, la coopération et la participation des personnes affectées et des communautés aux

activités prévues dans le plan de réinstallation;

assurer la transparence dans toutes les étapes de la mise en œuvre du plan de réinstallation ;

informer toutes les catégories de personnes affectées sur les restrictions potentielles d’accès qu’elles

pourraient subir pendant les travaux : accès aux marchés, accès à quelques infrastructures sociales de

base (écoles, points d’eau, offices réligieux) ;

faciliter tout autre aspect du programme.

Pour mettre en marche ces programmes, le Maître d’Ouvrage instituera un programme social sous la

responsabilité de l’expert socio environnementaliste de la Cellule BAD/BM et avec l’assistance d’une

ONG à recruter our appuyer la mise en œuvre du PAR ; le but étant d’assurer les actions suivantes (qui ne

sont pas limitées) :

s’assurer que les autorités locales sont bien informées de tous les aspects de l’opération et y collaborent;

Organiser avec les PAP leur déménagement /réinstallation sur les nouveaux sites;

Fournir toute assistance nécessaire aux PAP pendant la période de déménagement et réinstallation;

Assurer que toutes les familles rétablissent leur situation sociale et leur revenu antérieur au déplacement

dans des délais raisonnables.

Toutes ces actions devront être menées en étroite collaboration avec la Communauté urbaine de Bamenda

et la commune de Babadjou.

Page 45: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

44

VII- PROCEDURES DE RECOURS : MÉCANISME DE

GESTION DES PLAINTES

Les procédures de recours reposeront sur l’arrangement à l’amiable. La justice ne constituera que l’ultime

recours. Le tableau ci-après définit les responsabilités dans la gestion ainsi que les types de plaintes.

Tableau n°4 : Gestion des plaintes

TYPE DE PLAINTES RESPONSABLES DE LA MISE EN ŒUVRE

DU MECANISME

Contestation de l’éligibilité Commission départementale

Contestation sur l’évaluation Comité de conciliation

Commission départementale

Contestation sur l’ayant droit légitime Comité de conciliation

Commission départementale

Contestation des coûts des indemnisations Commission départementale

Page 46: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

45

IX- RESPONSABILITES DE MISE EN ŒUVRE DU PAR

La responsabilité de la mise en œuvre du PAR incombe à divers auteurs énumérés dans le tableau 5 ci-

dessous.

Tableau N° 5 : Responsables de mise en œuvre du PAR

ACTEURS DE MISE EN

ŒUVRE DU PAR

MISSIONS DANS LA MISE EN ŒUVRE DU PAR

MINTP, Maître d’ouvrage - Supervision

- Mobilisation des ressources

- Gestion des plaintes

- Suivi et evaluation

MINDCAF - Préparation des projets de décrets d’expropriation et

d’indemnisation

CCE - Evaluation des biens

- Gestion des appels concernant l'admissibilité et le montant de

l'indemnisation

- Payement des indemnistions

Banque mondiale - Appui technique

- Non objection quand necessaire

- Suivi

CAA - Mise à disposition des ressources financières

ONG - Assistance-conseil aux PAP

PAP - Participation dans tout le processus

Page 47: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

46

X- PROGRAMME DE MISE EN ŒUVRE DU PAR

Les activités prises en compte dans le tableau ci-dessous prennent pour référence la date de transmission

des rapports des commissions de constat et d’évaluation des biens au Ministre en charge des domaines : le

08 août 2016.

Tableau n°6 : Calendrier de mise en œuvre du PAR

N° ACTIVITES PERIODE RESPONSABLES

1 Signature du décret d’expropriation 22 août au 30 octobre 2016 PM

2 Décaissement des fonds pour paiement des

PAP

22 août au 15 novembre

2016

MINTP/CAA

3 Assistance-conseil aux PAP 22 août au 06 décembre

2016

ONG

4 Paiement des PAP 22 novembre au 05

décembre 2016

CCE

5 Gestion des réclamations Immédiatement après la

tenue de l’atelier de

restitution des résultats des

commissions d’évaluations

des biens

CCE et GRM pour le

projet

6 Evaluation externe pour confirmer que les PAP

ont établi leurs moyens de subsistance à un

niveau égal ou supérieur à celui avant le début

du projet.

A partir du 15 janvier 2018 Consultant/MINTP

Page 48: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

47

XI- SUIVI ET EVALUATION

11.1. SUIVI INTERNE

Compte tenu de la portée sociale des opérations de déplacement des PAP, son processs doit être suivi et

évalué régulièrement. Pour une maîtrise optimale de l’opération, un suivi interne doit être effectué par les

services du Maître d’Ouvrage. Le tableau 7 ci-après déroule ce processus de suivi interne.

Tableau n°7 : Processus de suivi interne de la mise en œuvre du PAR

N° ACTIVITES PERIODE RESPONSABLES INDICATEURS

1 Signature des décrets

d’expropriation et d’indemnisation

22 août au 30 octobre

2016

Unité de Gestion

Cellule BAD/BM

Décrets signés

2 Décaissement des fonds pour

paiement des PAP

22 août au 15

novembre 2016

Unité de Gestion

Cellule BAD/BM

Fonds

disponibles

3 Paiement des PAP 22 novembre au 05

décembre 2016

Unité de Gestion

Cellule BAD/BM

PV de paiement

des PAP

Assistance-conseil aux PAP 22 août au 06

décembre 2016

ONG Rapports

d’activités de

l’ONG

4 Gestion des reclamations Immédiatement après

la tenue de l’atelier

de restitution des

résultats des

commissions

d’évaluations des

biens

Unité de Gestion

BAD/BM

Cellule de prote tion

de l’Environnement

du MINTP

Rapports de

gestion des

réclammations

5 Evaluation externe A partir du 15 janvier

2018

Unité de Gestion

BAD/BM

Cellule de prote tion

de l’Environnement

du MINTP

Rapports

d’évaluation

11.2. EVALUATION (SUIVI EXTERNE)

L'évaluation utilise les documents issus du suivi interne et externe, et en supplément, les évaluateurs

procèdent à leurs propres analyses de terrain par enquêtes auprès des intervenants et des personnes

affectées par le projet. L'évaluation des actions de compensation entreprises au sein des projets sera menée

par des auditeurs compétents choisis sur la base de critères objectifs (voir tableau 8). Cette évaluation sera

entreprise en deux (2) temps:

immédiatement après l'achèvement des opérations de paiement des compensations afin de

déterminer si les PAP ont été entièrement payées avant le démarrage effectif des travaux

deux ans après l'achèvement des opérations de compensation pour voir si les PAP jouissent d’un

niveau de vie égal ou supérieur à celui qu’elles avaient auparavant.

Page 49: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

48

Tableau n°8 : Processus de suivi externe

N° ACTIVITES PERIODE RESPONSABLES INDICATEURS

1 Evaluation générale de la

conformité de l'exécution avec

les objectifs et méthodes précisés

dans le cadre de politique de

réinstallation

Fin du projet Consultant Rapports

2 Evaluation de la mise en œuvre

du PAR

- A mi-parcours

- A la fin du

processus

Consultant Rapports

3 Evaluation des procédures mises

en œuvre pour les

indemnisations et le

déplacement.

- A mi-parcours

- A la fin du

processus

Consultant Rapports

4 Evaluation de l'impact des

programmes de réinstallation sur

les revenus, les niveaux de vie,

et les moyens d'existence

2 ans après paiement

des indemnisations

(fin du projet)

Consultant Rapports

5 Evaluation des actions

correctives à prendre

éventuellement dans le cadre du

suivi, et évaluation des

modifications à apporter aux

stratégies et méthodes utilisées

pour la réinstallation

- A mi-parcours

- A la fin du

processus

Consultant Rapports

13.4. INDICATEURS DE SUIVI

Afin de déterminer dans quelle mesure les objectifs sont atteints, les indicateurs vérifiables suivants

serviront à mesurer la performance du PAR :

le nombre de PAP effectivement payés;

le nombre de requêtes sur le total de cas de compensation ;

les délais de résolution des plaintes ;

le nombre de plaintes des communautés locales.

A cet effet, chaque individu aura un dossier de suivi de ses indemnisations où seront enregistrés sa situation

initiale, tous les usages et améliorations subséquents de biens par le projet et le montant, la nature ou la forme de

compensation convenu et perçu.

Par ailleurs, le Maitre d’ouvrage maintiendra une base de données complète sur chaque individu touché par les

exigences foncières du projet y compris la réinstallation, la compensation, les impacts sur les terres et autres

actifs affectés ;

Page 50: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

49

XII- COUTS ET BUDGET DE MISE EN ŒUVRE DU PAR

12.1. COUTS

Suivant la PO 4.12 et la réglementation nationale en matière d’expropriation notamment la loi N°85/009

du 04 juillet 1985 relative à l’expropriation pour cause d’utilité publique et aux modalités

d’indemnisations toutes les victimes des expropriations seront payées avant le démarrage effectif des

travaux. Les programmations budgétaires sont faites dans ce sens.

L’évaluation des biens a été faite suivant la réglementation nationale d’une part et suivant la note

méthodologique élaborée selon les modalités d’estimation des coûts de compensation suivant la valeur de

remplacement d’autre part. Cette note dont une copie est jointe en annexe, a été transmise aux

Gouverneurs des régions de l’Ouest et du Nord-Ouest pour application par les commissions

départementales de constat et d’évaluation des biens (Mezam et Bamboutos). Le PAR ne considère ici que

les évaluations faites selon la note méthodologique transmise qui répond aux principes énoncés dans le

CPR. Le tableau ci-après donne les coûts des évaluations resume par département.

Tableau n°9 : Coûts des indemnisations

N° DESIGNATION COUTS

BAMBOUTOS

1 Nue-propriétés 3 096 600

2 Cultures /arbres 46 185 802

3 Constructions (maisons, commerces, hangars et tombes) 77 595 635

TOTAL I 126 878 037

MEZAM

1 Nue-propriétés 41 914 438

2 Cultures /arbres 36 648 929

3 Constructions (maisons, commerces, hangars et tombes) 266 255 332

TOTAL II 345 818 699

TOTAL I + II 472 696 736

Source : rapports des commissions de constat et d’évaluation

Pour l’évaluation définitive du coût global du PAR, les rubriques suivantes ont été considérées en dehors

du coût des indemnisations:

des imprévus dus aux ajustements d’emprises relatifs aux projets d’exécution actualisés de l’entreprise

et à l’assistance ponctuelle pour cause déplacement temporaires des commerçants ;

l’assistance au déménagement des personnes vulnérables ;

le fonctionnement des Commissions de conciliation ;

une évaluation externe après la mise en œuvre du PAR.

En détaillant ce coût global d’indemnisation par catégories de biens détruits, nous avons :

Page 51: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

50

Tableau n°10 : Coût d’indemnisation par catégorie des Biens impactés

CONSTRUCTIONS (maisons, commerces, hangars et tombes) 343 850 967

CULTURES/ARBRES 83 834 731

FONCIERS 45 011 038

Sous Total 472 696 736

Fonctionnement des commissions de conciliation 10 000 000

Evaluation externe 30 000 000

Assistance au déménagement des personnes vulnérables 10 000 000

Imprévus 50 000 000

Total 572 696 736

Le coût global de mise en œuvre du PAR est estimé à 572 696 736 FCFA (cinq cent soixante douze

millions six cent quatre-vingt seize mille sept cent trente-six). Il sera pris en charge par les fonds de

contrepartie du projet.

Les réseaux (CAMTEL, CAMWATER, ENEO) seront déplacés avant le démarrage des travaux

prévus le 14 janvier 2017.

Concernant les 66 PAP éligibles à une assistance ponctuelle pour déplacement temporaire, il est

relevé dans le CPR (section 4.2.2) qu’il sagit de 66 boutiques appartenant à la Communauté Urbaine

de Bamenda (démembrement de l’Etat) qui les loue à des tiers. La Communauté Urbaine de Bamenda

qui est en fait la personne affectée s’est donc engagée à reloger ses locataires dans d’autres boutiques

disponibles pendant la phase de construction. S’agissant des exploitants de téléphonie mobile (call

box) qui utilisent les comptoirs en matériaux provisoires, des nouveaux emplacements leur seront

attribués pendant la phase des travaux.

Page 52: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

51

ANNEXES

Annexe 1 : Evaluation des cultures dans le Nord-0uest

CROP EVALUATION IN SANTA, BAMENDA I, BAMENDA II AND

BAMENDA III. 2

Assessment report for crops found on the right way of the Rehabilitation of the Babadjou-Bamenda

Escarpment Bypass and the Bamenda Urban Road in Mezam Division, North West Region, in execution

of the instructions of the Prime Minister, Head of Government contained in letter No 00133/cf/CAB/PM

of 17th May 2016 relating to the application of the methodological note.

MEMBERS OF THE TECHNICAL SUB COMMISSION OF THE EVALUATION OF

CROPS

1. NGWANG GEORGE NFOR - Chairperson

2. NKWATOH MARY -

Member

3. ATEWELE VIRGILUS ACHE - Member

4. BRIDGET ATUH MBAFOR -

Member

SANTA SUBDIVISION

1)Name of Owner of the Crops : Takah Peter ID Card No 113344476

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL 4%

Increas

e

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Guava

trees

2 25000 50000 0 0 0 50000

2 Eucalypt 1 10000 10000 10000

2 Seules les cultures pérennes sont concernées par les indemnisations, les cultures saisonnières et annuelles faisant l’objet de récolte avant le début des travaux. En outre, les populations seront informées par le Maître d’Ouvrage au moins six (06) mois à l’avance du début des travaux. En plus les DUP déjà mises à la disposition des autorités traditionnelles suspendent toute activité ou nouvelle en œuvre dans les emprises des tronçons routiers à aménager.

Page 53: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

52

us trees

TOTAL 60 000 62 400

2)Name of Owner of the Crops : Achu Mandi Churchill ID Card No 1143221291

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalypt

us trees

0 0 0 3 10000 30000 30000

2 Plantains 0 0 0 3 1000 3000 3000

TOTAL 33 000 34 320

3) Name of Owner of the Crops :Khan Henry Chi ID Card No114623801

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Plantains 0 0 0 4 1000 4000 4000

2 Coffee

7year

1 25000 25000 0 0 0 25000

3 Eucalypt

us trees

0 0 0 4 10000 40000 40000

4 Bananas 0 0 0 6 800 4800 4800

5 Guava

Trees

2 25000 50000 0 0 0 50000

TOTAL 123 800 128 752

4) Name of Owner of the Crops: Fonkwo Florence Akwen ID Card NO 117901744

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear

trees

1 3500

0

35000 0 0 0 35000

2 Guava

Trees

1 2500

0

25000 0 0 0 25000

3 Plantains 4 1500 6000 8 1000 8000 14000

4 Bananas 8 1200 9600 4 800 3200 12800

TOTAL 86 800 90 272

Page 54: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

53

5) Name of Owner of the Crops :Fondap Pupupa Samuel ID Card No 108295587

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total Cost Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalypt

us trees

2 20000 40000 0 0 0 40000

2 pear

Trees

2 35000 70000 0 0 0 70000

3 Guava

Trees

2 25000 50000 0 0 0 50000

TOTAL 160 000 166 400

6) Name of Owner of the Crops :Ngwa Joseph Nyawosi ID Card No 112660258

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalypt

us trees

0 0 0 6 10000 60000 60000

2 Guava

Trees

1 25000 25000 0 0 0 25000

3 mango

Trees

1 35000 35000 0 0 0 35000

4 Pear

Trees

2 35000 70000 0 0 0 70000

5 Bananas 0 0 0 5 800 4000 4000

6 Plantains 0 0 0 4 1000 4000 4000

TOTAL 198 000 205 920

7) Name of Owner of the Crops :Kan Tizi Emmanuel ID Card No 115425168

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCF

A)

(F. CFA)

1 Pear

trees

1 35000 35000 0 0 0 35000

Page 55: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

54

TOTAL 35 000 36 400

8)Name of Owner of the Crops : Masama Lilian Wgoh ID Card No 1153912907

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA

)

(F. CFA)

1 Guava

trees

5 25000 125000 0 0 0 125000

TOTAL 125 000 130 000

9) Name of Owner of the Crops :Sunkwe Rachel ID Card No104780222

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA

)

(F. CFA)

1 Guava

Trees

1 25000 25000 0 0 0 25000

2 Bananas 20 1200 24000 10 800 8000 32000

TOTAL 57 000 59 280

10) Name of Owner of the Crops:Taboh Stephen ID Card NO 118132895

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCF

A)

(F. CFA)

1 Eucalypt

us trees

0 0 0 6 10000 60000 60000

2 Pear

Trees

2 35000 70000 0 0 0 70000

3 Bananas 4 1500 6000 8 1000 8000 14000

4 Guava

Trees

1 25000 25000 0 0 0 25000

TOTAL 169000 175 760

11) Name of Owner of the Crops Nkam Margaret Nkoh ID Card No114030112

Page 56: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

55

N0 TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCF

A)

(F. CFA)

1 Pear

trees

1 35000 35000 0 0 0 35000

2 Guava

Trees

1 25000 25000 0 0 0 25000

TOTAL 60 000 62 400

12)Name of Owner of the Crops : Joseph Wanke Fru Ngwa ID Card No 113344376

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total Cost (FCFA)

(FCFA) (F. CFA)

1 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 35 000 36 400

13) Name of Owner of the Crops Tembong Olivier Che ID Card No113981212

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total Cost (FCFA)

(FCFA) (F. CFA)

1 Guava Trees 3 25000 75000 0 0 0 75000

2 Mango Trees 1 35000 35000 0 0 0 35000

3 Eucalyptus

trees

0 0 0 6 10000 60000 60000

TOTAL 170 000 176 800

14)Name of Owner of the Crops :Tembong Benjamin Tandeka ID Card No 110747000

Page 57: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

56

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total Cost (FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 2 10000 20000 20000

2 Pear Trees 3 35000 105000 0 0 0 105000

3 Plantains 0 0 0 4 1000 4000 4000

4 Bananas 10 1200 12000 15 800 12000 24000

TOTAL 153 000 159 120

15) Name of Owner of the Crops :Forsuh Joseph ID Card No 111029526

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total Cost (FCFA)

(FCFA) (F. CFA)

1 Bananas 20 1200 24000 30 800 24000 48000

TOTAL 48 000 49 920

16) Name of Owner of the Crops :Larry Hanse Longmangem ID Card NO

111510427

N0 TYPE OF

CROP

MATURED IMMATURED GRAND TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pears trees 2 35000 70000 0 0 0 70000

2 Plantains 60 1500 90000 0 0 0 90000

3 Guava Trees 3 25000 75000 0 0 0 75000

4 Eucalyptus

trees

1 20000 20000 2 10000 20000 40000

TOTAL 275 000 286 000

17) Name of Owner of the Crops:Lum Helen Chingum ID Card NO

113975457

N0 TYPE OF

CROP

MATURED IMMATURED GRAND TOTAL

(FCFA)

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA) (F.

CFA)

Page 58: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

57

1 Pears trees 2 35000 70000 0 0 0 70000

2 Mango Trees 1 35000 35000 0 0 0 35000

3 Guava Trees 1 25000 25000 0 0 0 25000

TOTAL 130 000 135 200

18) Name of Owner of the Crops Ngafor Laurencia Numbusi ID Card No 1190734937

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit Cost Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 20 10000 200000 200000

2 Mango Trees 1 35000 35000 0 0 0 35000

3 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 270 000 280 800

19) Name of Owner of the Crops: Mboni John Afah ID Card NO

108960375

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Raffia Palm 5 3000 15000 0 0 0 15000

2 Pear Trees 2 35000 70000 0 0 0 70000

3 Bananas 50 1200 60000 30 800 24000 84000

TOTAL 169 000 175 760

Page 59: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

58

20) Name of Owner of the Crops :Teneng Samuel Tanghe ID Card No 1173234842

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 2 10000 20000 20000

TOTAL 20 000 20 800

21)Name of Owner of the Crops : Ateyim Samuel Nfortem ID Card No 1140301446

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Coffee

(12years)

3 25000 75000 0 0 0 75000

2 Guava Trees 2 25000 50000 0 0 0 50000

3 Other

Cultivated

Trees.(Cypre

ss)

5 10000 50000 0 0 0 50000

4 Orange 1 35000 35000 0 0 0 35000

5 Kolanut tree 1 50000 50000 0 0 0 50000

6 Plantains 10 1500 15000 12 1000 12000 27000

TOTAL 287 000 298 480

22) Name of Owner of the Crops :Forjndam Edwin Muluh ID Card No115391493

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

12 20000 240000 0 0 0 240000

TOTAL 240 000 249 600

23) Name of Owner of the Crops: Fon Ignatius ID Card NO 115147228

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Page 60: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

59

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Coffee Trees 7 25000 175000 0 0 0 175000

2 Guava Trees 2 25000 50000 0 0 0 50000

TOTAL 225 000 234 000

24) Name of Owner of the Crops :Mboni Achu George ID Card No 110380889

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Kolanut

trees

1 50000 50000 0 0 0 50000

2 Guava Trees 2 25000 50000 0 0 0 50000

3 Eucalyptus

trees

0 0 0 4 10000 40000 40000

4 Mango Trees 3 35000 105000 0 0 0 105000

TOTAL 245 000 254 800

25) Name of Owner of the Crops :Muluh Christopher Nkem ID Card No 1181327474

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost (FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 4 10000 40000 40000

2 Pears Trees 1 35000 35000 0 0 0 35000

3 Coffee 8

years

4 25000 100000 0 0 0 100000

4 Guava Trees 2 25000 50000 0 0 0 50000

TOTAL 225 000 234 000

26) Name of Owner of the Crops:Muluh Victor Achiri ID Card NO 110530722

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

(FCFA)

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total Cost

(FCFA) (F. CFA)

1 Improved

Palm Trees

1 35000 35000 0 0 0 35000

2 Paw-paw 1 3000 3000 0 0 0 3000

Page 61: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

60

3 Guava Trees 3 25000 75000 0 0 0 75000

4 Bananas 12 1200 14400 0 0 0 14400

TOTAL 127 400 132 496

27) Name of Owner of the Crops:Ngu Churchchill Ndum ID Card NO

109774456

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 GuavaTrees 3 25000 75000 0 0 0 75000

2 Eucalyptus

trees

0 0 0 5 10000 50000 50000

3 Bananas 15 1200 18000 0 0 0 18000

TOTAL 143 000 148 720

28) Name of Owner of the Crops: Nitcheud Jean Theodore ID Card NO 114846429

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Mango

trees

2 35000 70000 0 0 0 70000

TOTAL 70 000 72 800

29) Name of Owner of the Crops :Akenji Achu Fidelis ID Card No 113682240

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 19 10000 190000 190000

TOTAL 190 000 197 600

30)Name of Owner of the Crops : Chofor Linus Mukong ID Card No 1194866224

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

Page 62: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

61

1 Bananas 25 1200 30000 15 800 12000 42000

TOTAL 42 000 43 680

31) Name of Owner of the Crops :Samuel Fon ID Card No 110162154

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear Trees 1 35000 35000 0 0 0 35000

2 Guava Trees 2 25000 50000 0 0 0 50000

3 Bananas 15 1200 18000 0 0 0 18000

TOTAL 103 000 107 120

32) Name of Owner of the Crops: Awa Paul Pyziendah ID Card NO115391489

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear Trees 2 35000 70000 0 0 0 70000

2 Bananas 20 1200 24000 15 800 12000 36000

TOTAL 106 000 110 240

33) Name of Owner of the Crops :Nchang Frida ID Card No 1187110102

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Plume trees 1 50000 50000 0 0 0 50000

2 Coffee Trees 3 25000 75000 0 0 0 75000

3 Eucalyptus

trees

0 0 0 2 10000 20000 20000

4 Bananas 20 1200 24000 0 0 0 24000

TOTAL 169000 175760

34) Name of Owner of the Crops:Mbah Khan ID Card NO 1178444881

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Page 63: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

62

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Plantains 10 1500 15000 5 1000 5000 20000

TOTAL 20 000 20 800

Page 64: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

63

35) Name of Owner of the Crops :Mbuh Kan Zacheaus ID Card

No117741864/113975075

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Guava Trees 6 25000 150000 0 0 0 150000

2 Eucalyptus

trees

0 0 0 9 10000 90000 90000

TOTAL 240000 249 600

36 Name of Owner of the Crops: Odilia Wokoh Penn ID Card NO

108627712

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 10 10000 100000 100000

2 Guava Trees 5 25000 125000 0 0 0 125000

TOTAL 225000 234 000

37) Name of Owner of the Crops: Masop Justine ID Card NO 104184603

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Plantains 15 1500 22500 16 1000 16000 38500

2 Pear Trees 1 35000 35000 0 0 0 35000

3 Mango Trees 1 35000 35000 0 0 0 35000

TOTAL 108 500

112 840

Page 65: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

64

38) Name of Owner of the Crops :Beban Agens ID Card No 114846159

N0 TYPE OF

CROP

MATURED IMMATURED GRAN

D

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 9 10000 90000 90000

TOTAL 90 000 93 600

39)Name of Owner of the Crops : Chinje Pius Nchotu ID Card No

114624458

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Plume Trees 1 50000 50000 0 0 0 50000

2 Bananas 6 1200 7200 4 800 3200 10400

3 pear trees 2 35000 70000 0 0 0 70000

TOTAL 130 400 135 616

40) Name of Owner of the Crops :Pieneli Maurice ID Card No 110380825

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Plantains 20 1500 30000 15 1000 15000 45000

2 Eucalyptus

trees

0 0 0 9 10000 90000 90000

TOTAL 135 000 140 400

Page 66: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

65

41) Name of Owner of the Crops: Forpah Jean Pekesu ID Card NO 114030097

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 5 10000 50000 50000

TOTAL 50 000 52 000

42) Name of Owner of the Crops :Timbong Divine Niji ID Card No 114846130

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Guava Trees 1 25000 25000 0 0 0 25000

2 Bananas 5 1200 6000 0 0 0 6000

3 Eucalyptus

trees

0 0 0 10 10000 100000 100000

TOTAL 131 000 136 240

43) Name of Owner of the Crops: Fobah Thomas Mambap ID Card NO1146243052

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 pear Trees 1 35000 35000 0 0 0 35000

2 Eucalyptus

trees

0 0 0 5 10000 50000 50000

3 Plantains 6 1500 9000 14 1000 14000 23000

TOTAL 108 000 112 320

Page 67: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

66

44) Name of Owner of the Crops :Rose Lum Fombasoh ID Card No 117265889

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 pear Trees 3 35000 105000 0 0 0 105000

TOTAL 105 000 109 200

45) Name of Owner of the Crops: Tewa Johana ID Card NO 1126603726

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Guava Trees 2 25000 50000 0 0 0 50000

TOTAL 50 000 52 000

46) Name of Owner of the Crops :Chosmbom Chi Gehmoh ID Card No 11507478

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear trees 2 35000 70000 1 5000 5000 75000

TOTAL 75 000 78 000

Page 68: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

67

47)Name of Owner of the Crops; Tazo-oh Clovis Nempah ID Card No115722012

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Guava Trees 2 25000 50000 0 0 0 50000

2 Eucalyptus

trees

0 0 0 8 10000 80000 80000

TOTAL 130 000 135 200

48)Name of Owner of the Crops; Bafuke Alooysius ID Card No 110697329

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

1 20000 20000 0 0 0 20000

2 Mangoe

Tree

1 35000 35000 0 0 0 35000

3 Guava Trees 1 25000 25000 0 0 0 25000

4 Pear Trees 1 35000 35000 0 0 0 35000

5 Eucalyptus

trees

0 0 0 3 10000 30000 30000

TOTAL 145000 150 800

49) Name of Owner of the Crops: Ngu Clement ID Card NO 1027387185

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Kolanut trees 1 50000 50000 0 0 0 50000

2 Pear Trees 1 35000 35000 0 0 0 35000

3 Guava Trees 3 25000 75000 0 0 0 75000

4 Eucalyptus

trees

0 0 0 3 10000 30000 30000

TOTAL 190000 197 600

50) Name of Owner of the Crops :Jenet Lum Suh ID Card No 1179463375

Page 69: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

68

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pears Trees 1 35000 35000 1 5000 5000 40000

2 Guava Trees 3 25000 75000 0 0 0 75000

3 mango Trees 1 35000 35000 0 0 0 35000

4 Bananas 6 1200 7200 0 0 0 7200

5 Eucalyptus

trees

0 0 0 5 10000 50000 50000

TOTAL 207 200 215 488

51)Name of Owner of the Crops : Kan Payne Elroy Moses ID Card No115851015

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 18 10000 180000 180000

TOTAL 180 000 187 200

52) Name of Owner of the Crops :Asongwe Rudol Fon ID Card No106237842

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Guava Trees 1 25000 25000 0 0 0 25000

2 Bananas 25 1200 30000 15 800 12000 42000

TOTAL 67 000 69 680

Page 70: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

69

53) Name of Owner of the Crops: Achu Sergenta Anyim ID Card NO1181326903

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear Trees 2 35000 70000 0 0 0 70000

2 Bananas 15 1200 18000 10 800 8000 26000

TOTAL 96 000 99 840

54) Name of Owner of the Crops :Lemupah Anthony ID Card No 111326268

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 20 1200 24000 15 800 12000 36000

2 Pears Trees 2 35000 70000 4 5000 20000 90000

3 Eucalyptus

trees

0 0 0 17 10000 170000 170000

TOTAL 296000 307 840

55) Name of Owner of the Crops:Catholic Church C\o Parish Priest ID Card NO

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

(FCFA)

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA) (F.

CFA)

1 Eucalyptus

trees

11 20000 220000 0 0 0 220000

TOTAL 220000 220 000

Page 71: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

70

56) Name of Owner of the Crops :Ngwashi Joseph ID Card No107652558

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear Trees 2 35000 70000 0 0 0 70000

2 Eucalyptus

trees

0 0 0 17 10000 170000 170000

3 Mango Trees 1 35000 35000 0 0 0 35000

TOTAL 275 000 286 000

57) Name of Owner of the Crops: Lomago Jean ID Card NO 114556964

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear trees 2 35000 70000 0 0 0 70000

2 Mango Trees 1 35000 35000 0 0 0 35000

3 Bananas 20 1200 24000 0 0 0 24000

TOTAL 129000 134 160

58) Name of Owner of the Crops :Mboni Achu Geroge ID Card No 1103808894

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 21 10000 210000 210000

TOTAL 210 000 210 000

Page 72: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

71

59)Name of Owner of the Crops;Apara Gilbert ID Card No 111326121

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 17 10000 170000 170000

2 Pears Trees 1 35000 35000 0 0 0 35000

TOTAL 205 000 213 200

60) Name of Owner of the Crops: Augustine Meretong Mofon ID Card NO 11510135585

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 12 10000 120000 120000

3 Guava Trees 1 25000 25000 0 0 0 25000

TOTAL 145 000 150 800

61) Name of Owner of the Crops :Ngezong Carine Puo ID Card No 112660233

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Bananas 14 1200 16800 6 800 4800 21600

2 Pears Trees 1 35000 35000 1 5000 5000 40000

3 Guava Trees 1 25000 25000 1 10000 10000 35000

4 mango Trees 1 35000 35000 0 0 0 35000

TOTAL 131 600 136 864

Page 73: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

72

62)Name of Owner of the Crops : Mengot Abongangi ID Card No 1179460330

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 7 10000 70000 70000

2 Guava Trees 1 25000 25000 0 0 0 25000

3 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 130 000 135 200

63) Name of Owner of the Crops :Ngon Desmono Puo ID Card No1139728566

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

Trees

6 20000 120000 0 0 0 120000

TOTAL 120 000 124 800

64) Name of Owner of the Crops: Mary Maribah ID Card NO 1106044820

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear Trees 1 35000 35000 0 0 0 35000

2 Guava Trees 1 25000 25000 0 0 0 25000

3 Mango Trees 1 35000 35000 0 0 0 35000

4 Bananas 12 1200 14400 5 800 4000 18400

TOTAL 113 400 117 936

Page 74: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

73

65) Name of Owner of the Crops :Vincent Fosuh Akenji ID Card No 1093252493

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 coffee 8years 5 25000 125000 0 0 0 125000

2 Pears Trees 1 35000 35000 0 0 0 35000

3 Eucalyptus

trees

0 0 0 8 10000 80000 80000

TOTAL 240 000 249 600

66) Name of Owner of the Crops :Mamoufa Tchiofo Mirille ID Card No 115391311

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 12 10000 120000 120000

TOTAL 120 000 124 800

SUB TOTAL A 9 725 624

Nine Million Seven hundred and Twenty Five thousand Six Hundred and Twenty

Four Francs CFA

Page 75: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

74

Bamenda I

67) Name of Owner of the Crops: Ngeh Akanga Jeremiah ID Card NO 107741108

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

4%

Increase

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

2 20000 40000 0 0 0 40000

2 Pear Trees 2 35000 70000 0 0 0 70000

3 Guava Trees 1 25000 25000 0 0 0 25000

4 Plantains 0 0 0 5 1000 5000 5000

5 Bananas 4 1200 4800 8 800 6400 11200

TOTAL 151 200 157248

68) Name of Owner of the Crops :Abongni Grace Tabifor ID Card No 114157575

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 1 10000 10000 10000

2 Pears Trees 1 35000 35000 1 5000 5000 40000

3 Guava Trees 1 25000 25000 1 10000 10000 35000

4 mango Trees 0 0 0 1 5000 5000 5000

5 Bananas 15 1200 18000 20 800 16000 34000

6 improved

Palm Trees

(2years)

0 0 0 5 10000 50000 50000

TOTAL 174 000 180960

Page 76: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

75

69) Name of Owner of the Crops : Grace Lemnue ID Card No 115050497

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 improved

Palm Trees

(2years)

0 0 0 1 10000 10000 10000

2 Bananas 4 1200 4800 6 800 4800 9600

TOTAL 19 600 20 384

70) Name of Owner of the Crops :Atefu Gladys ID Card No113906084

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 improved

Palm Trees

(2years)

0 0 0 1 10000 10000 10000

2 Eucalyptus

trees

0 0 0 2 10000 20000 20000

4 Bananas 0 0 0 4 800 3200 3200

5 Plantains 1 1500 1500 0 0 0 1500

TOTAL 34 700 36 088

71) Name of Owner of the Crops: Victorine Nsunji ID Card NO 113691947

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear Trees 2 35000 70000 0 0 0 70000

TOTAL 70 000 72 800

72) Name of Owner of the Crops :Tanue John ID Card No115007849

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

Page 77: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

76

(FCFA) (F. CFA)

1 Eucalyptus

trees

8 20000 160000 12 10000 120000 280000

2 Pears Trees 0 0 0 1 5000 5000 5000

3 Eucalyptus

trees

0 0 0 2 10000 20000 20000

4 Mango Trees 1 35000 35000 0 0 0 35000

5 Raffia Palm 1 3000 3000 0 0 0 3000

TOTAL 343 000 356.720

73) Name of Owner of the Crops:Azinwi Mforcham Angela ID Card NO 117193833

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 pear Trees 1 35000 35000 0 0 0 35000

2 Eucalyptus

trees

2 20000 40000 0 0 0 40000

3 Guava Trees 1 25000 25000 2 10000 20000 45000

TOTAL 120 000 124.800

74) Name of Owner of the Crops :Forsuh Samuel Ndam ID Card No

117741864

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 GuavaTrees 1 25000 25000 0 0 0 25000

3 Eucalyptus

trees

2 20000 40000 2 10000 20000 60000

TOTAL 85 000 88 400

75) Name of Owner of the Crops: Akemche Ahmadou Abih ID Card NO 117806801

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 11 10000 110000 110000

Page 78: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

77

TOTAL 110 000 114.400

76) Name of Owner of the Crops :Peter Ambe ID Card No 111491349

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pears Trees 1 35000 35000 0 0 0 35000

2 Plume Trees 1 50000 50000 0 0 0 50000

3 Bananas 20 1200 24000 40 800 32000 56000

4 Eucalyptus

trees

0 0 0 5 10000 50000 50000

TOTAL 191 000 198.640

77) Name of Owner of the Crops; Akosung George Nde ID Card No116060175

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Guava Trees 2 25000 50000 0 0 0 50000

2 Pears Trees 1 35000 35000 0 0 0 35000

3 Eucalyptus

trees

4 20000 80000 7 10000 70000 150000

5 Kolanut

Trees

1 50000 50000 0 0 0 50000

6 Raffia Palm 9 3000 27000 0 0 0 27000

7 Bananas 3 1200 3600 5 800 4000 7600

TOTAL 319 600 332.384

78) Name of Owner of the Crops :Tanue Valantine Genjang ID Card No 1091391547

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

1 20000 20000 0 0 0 20000

2 Mangoe

Tree

2 35000 70000 0 0 0 70000

Page 79: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

78

TOTAL 90 000 93 600

79) Name of Owner of the Crops: Ndinteh Agnes Ngwafuh ID Card NO 111752520

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

3 20000 60000 0 0 0 60000

2 Mango

Trees

2 35000 70000 0 0 0 70000

3 Guava Trees 1 25000 25000 0 0 0 25000

4 Raffia Palms 9 3000 27000 0 0 0 27000

TOTAL 182 000 189.280

Page 80: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

79

80) Name of Owner of the Crops :Tatchoula Michel ID Card No 109634742

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalytus

Trees

4 20000 80000 8 10000 80000 160000

TOTAL 160 000 166.400

81) Name of Owner of the Crops: Tangie Forwah Fehus ID Card NO115050974

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

4 20000 80000 0 0 0 80000

TOTAL 80 000 83 200

82) Name of Owner of the Crops :Louis Che Wanka ID Card No 113366787

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

9 20000 180000 12 10000 120000 300000

2 Mango

Trees

2 35000 70000 0 0 0 70000

3 Kolanut

Trees

1 50000 50000 0 0 0 50000

4 Pear Trees 3 35000 105000 0 0 0 105000

TOTAL 525 000 546.000

83) Name of Owner of the Crops:Manka Rose ID Card NO114873803

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

Page 81: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

80

CFA)

1 Eucalyptus

trees

4 20000 80000 4 10000 40000 120000

TOTAL 120 000 124.800

84) Name of Owner of the Crops :Mengwi Nicline Nformenih ID Card No 108116265

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Kolanut

Trees

1 50000 50000 0 0 0 50000

2 Eucalyptus

trees

0 0 0 2 10000 20000 20000

TOTAL 70 000 72 800

85) Name of Owner of the Crops:Takwi Aloysius Ngafor ID Card NO 114871407

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pera Trees 1 35000 35000 0 0 0 35000

2 Mango

Trees

1 35000 35000 0 0 0 35000

TOTAL 70 000 72 800

Page 82: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

81

86) Name of Owner of the Crops : Tsaga Monrice C\o Tsida Edouard ID Card No

108639471

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear Tress 1 35000 35000 0 0 0 35000

TOTAL 35 000 36 400

87)Name of Owner of the Crops : Genjang Akosung Joseph ID Card No 117180774

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Improved

Palm Trees

(9years)

1 35000 35000 0 0 0 35000

2 Raffia Palm 1 3000 3000 0 0 0 3000

3 Bananas 4 0 0 5 800 4000 4000

TOTAL 42 000 43 680

88) Name of Owner of the Crops: Tsida Edouard ID Card No 108639471

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 2 1200 2400 4 800 3200 5600

2 Eucalyptus

trees

2 20000 40000 1 10000 10000 50000

TOTAL 55 600 57 824

Page 83: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

82

89) Name of Owner of the Crops: Djakon Epse Nouba ID Card NO 1180668255

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 10 1200 12000 8 800 6400 18400

TOTAL 18 400 19 136

90) Name of Owner of the Crops :Wanki David Takwi ID Card No116167041

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 12 10000 120000 120000

TOTAL 120 000 124.800

91) Name of Owner of the Crops:Suh Assah Numfor John ID Card NO 111336109

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 44 10000 440000 440000

2 Plume Trees 1 50000 50000 0 0 0 50000

3 Pear Trees 2 35000 70000 0 0 0 70000

4 Bananas 16 1200 19200 8 800 6400 25600

5 Guava Trees 1 25000 25000 0 0 0 25000

6 Mango

Trees

1 35000 35000 0 0 0 35000

TOTAL 645 600 671.424

92) Name of Owner of the Crops :Chi Paul Chung C\o Chief Cletus Tamjong Neba ID Card

No110802910

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Page 84: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

83

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

Trees

14 20000 280000 0 0 0 280000

2 Pears Trees 2 35000 70000 0 0 0 70000

3 Bananas 30 1200 36000 20 800 16000 52000

TOTAL 402 000 418.080

93) Name of Owner of the Crops:Monic Fusah C\o Tanue Andrew ID Card

NO108038732

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

Trees

15 20000 300000 0 0 0 300000

2 Pears Trees 1 35000 35000 0 0 0 35000

3 Bananas 30 1200 36000 8 800 6400 42400

4 Raffia Palms 3 3000 9000 0 0 0 9000

TOTAL 386 400 401.856

Page 85: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

84

94) Name of Owner of the Crops :Woko Neghue Martin ID Card No1180176225

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 30 1200 36000 0 0 0 36000

2 Guava Trees 2 25000 50000 0 0 0 50000

3 Eucalyptus

trees

0 0 0 28 10000 280000 280000

TOTAL 366 000 380.640

95) Name of Owner of the Crops: Sitcheu Elie ID Card NO 1114844278

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 40 1200 48000 0 0 0 48000

2 Mango Trees 1 35000 35000 0 0 0 35000

TOTAL 83 000 86 320

96) Name of Owner of the Crops :Ateh Christina Ndikum ID Card No 1112667260

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear tree 3 35000 105000 0 0 0 105000

2 Raffia Palm 6 3000 18000 0 0 0 18000

3 Improved

Palm Trees

9years

3 35000 105000 0 0 0 105000

TOTAL 228 000 237.120

Page 86: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

85

97)Name of Owner of the Crops :Njimented Martin Penn ID Card No110601484

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Raffia Palm 1 3000 3000 0 0 0 3000

2 Eucalyptus

trees

11 20000 220000 0 0 0 220000

3 Pear Trees 1 35000 35000 0 0 0 35000

4 Eucalyptus

trees

0 0 0 4 10000 40000 40000

TOTAL 298 000 309.920

98) Name of Owner of the Crops Tamanchambi Peter Forsuh ID Card No 118168337

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 35 000 36 400

99) Name of Owner of the Crops:Muluh Mary Pie ID Card NO 1078415710

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Raffia Palm 11 3000 33000 0 0 0 33000

2 Guava 6 25000 150000 0 0 0 150000

3 Eucalyptus

trees

4 20000 80000 0 0 0 80000

4 Mango Trees 1 35000 35000 0 0 0 35000

5 Pear trees 2 35000 70000 0 0 0 70000

TOTAL 368 000 382.720

100) Name of Owner of the Crops: Nde Clement ID Card NO 105970978

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Page 87: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

86

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 10 10000 100000 100000

2 Pears Trees 2 35000 70000 0 0 0 70000

TOTAL 170 000 176.800

101) Name of Owner of the Crops Fri Elizabeth C\o Stephen Abongwa Akembe ID

Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

5 20000 100000 0 0 0 100000

2 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 135 000 140.400

102) Name of Owner of the Crops:Tchagoue Jean Peter ID Card NO 1093450093

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Pear trees 4 35000 140000 0 0 0 140000

2 Bananas 16 1200 19200 8 800 6400 25600

3 Eucalyptus

trees

0 0 0 12 10000 120000 120000

TOTAL 285 600 297.024

103) Name of Owner of the Crops :Asowngwe Roseline Ngenjang ID Card

No1107342640

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

Page 88: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

87

(FCFA) (F.

CFA)

1 Eucalyptus

trees

6 20000 120000 0 0 0 120000

TOTAL 120 000 124.800

104) Name of Owner of the Crops:Bonny ID Card NO 17193838

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

8 20000 160000 0 0 0 160000

2 Raffia Palm 1 3000 3000 0 0 0 3000

TOTAL 163 000 169.520

105) Name of Owner of the Crops :Pius Mbeh ID Card No 1179463241

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

6 20000 120000 6 10000 60000 180000

TOTAL 180 000 187.200

Page 89: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

88

106) Name of Owner of the Crops :Amaboh Gerude Ngum ID Card No 1175414313

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Mango

Trees

2 35000 70000 0 0 0 70000

2 Eucalyptus

trees

7 20000 140000 0 0 0 140000

TOTAL 210 000 218.400

107) Name of Owner of the CropsJustine Tita Buowutid ID Card No 111484127

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear Trees 1 35000 35000 0 0 0 35000

2 Bananas 30 1200 36000 15 800 12000 48000

3 Guava 3 25000 75000 0 0 0 75000

4 Orange

Trees

1 35000 35000 0 0 0 35000

5 Mango

Trees

2 35000 70000 0 0 0 70000

6 Eucalyptus

trees

0 0 0 18 10000 180000 180000

TOTAL 443 000 460.720

108) Name of Owner of the Crops:Nduma Micheal Ntobua ID Card NO 117839850

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Plantains 4 1500 6000 0 0 0 6000

2 Guava 4 25000 100000 0 0 0 100000

3 Mango

Trees

1 35000 35000 0 0 0 35000

TOTAL 141 000 146.640

109) Name of Owner of the Crops: Abongwa Solange Ndosiri ID Card NO 109811224

Page 90: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

89

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Mango

Trees

4 35000 140000 0 0 0 140000

2 Pears Trees 1 35000 35000 0 0 0 35000

3 Bananas 15 1200 18000 10 800 8000 26000

TOTAL 201 000 209.040

110) Name of Owner of the Crops Lemsi Ngey ID Card No 1169349081

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 11 10000 110000 110000

2 Raffia Palm 3 3000 9000 0 0 0 9000

TOTAL 119 000 123.760

111) Name of Owner of the Crops:Akenji Ngwa Martin ID Card NO 107488448

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Pear trees 1 35000 35000 0 0 0 35000

2 Raffia Palm 6 3000 18000 0 0 0 18000

3 Eucalyptus

trees

0 0 0 13 10000 130000 130000

4 Guava 2 25000 50000 0 0 0 50000

5 Mango

Trees

1 35000 35000 0 0 0 35000

6 Eucalyptus

trees

7 20000 140000 0 0 0 140000

TOTAL 408 000 424.320

112) Name of Owner of the Crops :Ngwen Martina ID Card No 103954820

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

Page 91: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

90

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 32 10000 320000 320000

TOTAL 320 000 332.800

113) Name of Owner of the Crops:Joseph Forbiteh NdumuID Card NO 111901102

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 21 10000 210000 210000

TOTAL 210 000 218.400

114) Name of Owner of the Crops :Fube Ako Anthong ID Card No 108973490

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Mango Trees 1 35000 35000 0 0 0 35000

2 Eucalyptus

trees

12 20000 240000 0 0 0 240000

3 Guava

Trees

6 25000 150000 0 0 0 150000

4 Raffia Palms 5 3000 15000 0 0 0 15000

TOTAL 440 000 457.600

Page 92: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

91

116) Name of Owner of the Crops :Moudjieu Tichanko Charlotte ID Card No

1116282137

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 18 10000 180000 180000

2 Bananas 15 1200 18000 0 0 0 18000

TOTAL 198 000 205.920

117) Name of Owner of the Crops:Ngwingori Mary Acho ID Card NO 118168189

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Bananas 20 1200 24000 6 800 4800 28800

2 Pear Trees 2 35000 70000 0 0 0 70000

3 Raffia Palm 6 3000 18000 0 0 0 18000

TOTAL 116 800 121.472

118) Name of Owner of the Crops: Joseph Fobiteh Ndum ID Card NO 111901102

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 42 10000 420000 420000

TOTAL 420 000 436.800

Page 93: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

92

119) Name of Owner of the Crops Tamanjong Landry ID Card No 1098875503

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 20 10000 200000 200000

2 Raffia Palm 25 3000 75000 0 0 0 75000

TOTAL 275 000 286.000

120) Name of Owner of the Crops:Tchokomeni Billy Carter ID Card NO 116174165

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 33 10000 330000 330000

2 Eucalyptus

trees

7 20000 140000 0 0 0 140000

TOTAL 470 000 488.800

121) Name of Owner of the Crops :Doris Awahmungwe Dloye ID Card No 1193287776

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 29 10000 290000 290000

2 Bananas 20 1200 24000 10 800 8000 32000

3 Pear Trees 2 35000 70000 0 0 0 70000

TOTAL 392 000 407.680

Page 94: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

93

122) Name of Owner of the Crops: Tamachambi Regine Ngenue ID Card NO 11094003

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 36 10000 360000 360000

2 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 395 000 410 .800

123) Name of Owner of the Crops :Philomena Ngekwi Akenji ID Card No 113858778

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 29 10000 290000 290000

2 Bananas 20 1200 24000 10 800 8000 32000

TOTAL 322 000 334.880

124) Name of Owner of the Crops :Nahsang Mirabelle Tanikuru ID Card No

1183659477

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

2 Raffia

Palms

5 3000 15000 0 0 0 15000

TOTAL 15 000 15 600

Page 95: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

94

125) Name of Owner of the Crops:Mum Protus Muma ID Card NO 107984186

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Raffia

Palms

10 3000 30000 0 0 0 30000

2 Mango

Trees

1 35000 35000 0 0 0 35000

3 Eucalyptus

trees

1 20000 20000 0 0 0 20000

4 Bananas 30 1200 36000 10 800 8000 44000

TOTAL 129 000 134.160

126) Name of Owner of the Crops: Nkwenti Samuel ID Card NO 1119010245

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 22 10000 220000 220000

TOTAL 220 000 228.800

127) Name of Owner of the Crops Tanue Nicolas ID Card No 118362790

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

6 20000 120000 0 0 0 120000

TOTAL 120 000 124.800

Page 96: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

95

128) Name of Owner of the Crops: Takwi Micheal ID Card NO

109574470

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Kolanut

Trees

2 50000 100000 0 0 0 100000

2 Eucalyptus

trees

1 20000 20000 0 0 0 20000

TOTAL 120 000 124.800

129) Name of Owner of the Crops :Taniform Akoh Max ID Card No 111052319

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Kolanut

Trees

1 50000 50000 0 0 0 50000

2 Eucalyptus

trees

6 20000 120000 22 20000 44000

0

560000

3 Raffia Palm 6 3000 18000 0 0 0 18000

4 Pear Trees 2 35000 70000 0 0 0 70000

TOTAL 698 000 725.920

130) Name of Owner of the Crops: Patience Meshy Ngwa ID Card NO 113858838

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 25 10000 25000

0

250000

2 Kolanut

Trees

2 50000 100000 0 0 0 100000

3 Pear Trees 2 35000 70000 0 0 0 70000

4 Mango Trees 1 35000 35000 0 0 0 35000

5 Bananas 40 1200 48000 20 800 16000 64000

7 Guava Trees 2 25000 50000 0 0 0 50000

Page 97: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

96

TOTAL 569 000 591.760

131) Name of Owner of the Crops : Abongwa Alfred Ndey ID Card No 118328175

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Mango Trees 1 35000 35000 0 0 0 35000

2 Eucalyptus

trees

0 0 0 11 10000 11000

0

110000

3 Coffee

8years

2 25000 50000 0 0 0 50000

4 Raffia Palms 24 3000 72000 0 0 0 72000

TOTAL 267 000 277.680

132) Name of Owner of the Crops :Ngwesah Frida ID Card No 114328743

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 47 10000 47000

0

470000

TOTAL 470 000 488.800

133) Name of Owner of the Crops:Catholic Church Bamendakwe C\o Parish Priest ID Card NO

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

2 Eucalyptus

trees

12 20000 240000 65 10000 65000

0

890000

TOTAL 890 000 925.600

134) Name of Owner of the Crops: Forche Bernard ID Card NO1186234043

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

Page 98: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

97

CFA)

1 Eucalyptus

trees

45 20000 900000 0 0 0 900000

TOTAL 900 000 936.000

135) Name of Owner of the Crops : Ndoye Samuel Forsah ID Card No 107404036

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

17 20000 340000 0 0 0 340000

2 Raffia Palm 6 3000 18000 0 0 0 18000

3 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 393 000 408.720

136) Name of Owner of the Crops:Jean Colbert ID Card NO

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

6 20000 120000 20 10000 200000 320000

2 Bananas 20 1200 24000 0 0 0 24000

TOTAL 344 000 357.760

Page 99: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

98

137) Name of Owner of the Crops :Jank Fonje Joseph ID Card No 111150974

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Raffia Palm 5 3000 15000 0 0 0 15000

2 Bananas 10 1200 12000 0 0 0 12000

TOTAL 27 000 28 080

138) Name of Owner of the Crops: Mosongong Joseph C\o Musongong Josephine ID Card NO 117778199

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 66 10000 660000 660000

3 Bananas 13 1200 15600 0 0 0 15600

TOTAL 675 600 702.624

Page 100: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

99

139) Name of Owner of the Crops : Mbah Mourice ID Card No 117315008

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 47 10000 470000 470000

2 Bananas 3 1200 3600 0 0 0 3600

3 Pear Trees 2 35000 70000 0 0 0 70000

4 Guava Trees 1 25000 25000 0 0 0 25000

TOTAL 568 600 591344

140) Name of Owner of the Crops :Fokou Pascal ID Card No 107608668

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 8 10000 80000 80000

2 Bananans 17 1200 20400 0 0 0 20400

3 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 135 400 140.816

141) Name of Owner of the Crops : Temchiambi Kaley ID Card No 111246977

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

30 20000 600000 0 0 0 600000

TOTAL 600 000 624.000

Page 101: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

100

142) Name of Owner of the Crops:Florence Ateh Achunche ID Card NO 111752975

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

2 20000 40000 0 0 0 40000

2 Pear Trees 3 35000 105000 0 0 0 105000

3 Bananas 6 1200 7200 0 0 0 7200

TOTAL 152 200 158.288

143) Name of Owner of the Crops :Thomas Asonji Ngwa ID Card No 116101721

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 25 10000 250000 250000

TOTAL 250 000 260.000

144) Name of Owner of the Crops: Ndoye Roseline Awasiri ID Card NO 117667045

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 10 10000 100000 100000

2 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 135 000 140.400

Page 102: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

101

145) Name of Owner of the Crops :Asangbe Charles Takwi ID Card No 107567553

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 40 10000 400000 400000

2 Guava Trees 1 25000 25000 0 0 0 25000

3 Pear Trees 3 35000 105000 0 0 0 105000

4 Bananas 10 1200 12000 0 0 0 12000

5 Raffia Palm 15 3000 45000 0 0 0 45000

TOTAL 587 000 610.480

146) Name of Owner of the Crops :Pa Clement Ndibah ID Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 47 10000 470000 470000

TOTAL 470 000 488.800

147) Name of Owner of the Crops:Talah Emmanuel ID Card NO 107984186

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 13 10000 130000 130000

TOTAL 130 000 135.200

Page 103: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

102

148) Name of Owner of the Crops: Lukong Cornelius Fai ID Card NO 113934394

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Other

Cultivated

Trees.(Cypress)

3 10000 30000 30 5000 150000 180000

TOTAL 180 000 187.200

149) Name of Owner of the Crops Kinsah ID Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 52 10000 520000 520000

TOTAL 520 000 540.800

150) Name of Owner of the Crops: Aziwo Tatanda ID Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 42 10000 420000 420000

4 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 455 000 473.200

Page 104: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

103

151) Name of Owner of the Crops :Kamdem Adra ID Card No 1148045062

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 39 10000 3900

00

390000

3 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL

425000

442.033

152) Name of Owner of the Crops: Lontsi Nobert ID Card NO 1109404553

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 28 10000 2800

00

280000

TOTAL 280 000 291.200

153) Name of Owner of the Crops : Woko Therese ID Card No 110860927

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 25000 25000 0 0 0 25000

2 Pear Trees 2 35000 70000 0 0 0 70000

TOTAL 95 000 98 800

Page 105: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

104

154) Name of Owner of the Crops :Akwi Linda Fogham ID Card No 1103371912

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

8 20000 160000 0 0 0 160000

TOTAL 160 000 166.400

155) Name of Owner of the Crops:Neba Valentine Neba ID Card NO109668023

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 29 10000 290000 290000

TOTAL 290 000 301.600

156) Name of Owner of the Crops: Christopher Tanue C\o Abongwa Mirabell Tanikuru ID Card NO

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

8 20000 160000 0 0 0 160000

2 Pear Trees 1 35000 35000 0 0 0 35000

TOTAL 195 000 202.800

Page 106: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

105

157) Name of Owner of the Crops : Takwi Bananabas Taniform ID Card No 1175202965

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 2 10000 20000 20000

2 Raffia Palm 3 3000 9000 0 0 0 9000

3 Pear Trees 2 35000 70000 0 0 0 70000

4 Plantains 30 1500 45000 0 0 0 45000

TOTAL 144 000 149.760

158) Name of Owner of the Crops:Sirri Florence ID Card NO 1109662621

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 30 10000 300000 300000

2 Pear Trees 2 35000 70000 0 0 0 70000

TOTAL 370 000 384.800

Page 107: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

106

159) Name of Owner of the Crops : Alonje Gabriel Abongwa ID Card No 1163982109

N

0

TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total Cost Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalypt

us trees

0 0 0 11 1000

0

1100

00

110000

2 Bananas 10 1200 12000 0 0 0 12000

3 Pear

Trees

2 35000 70000 0 0 0 70000

4 Guava

Trees 3 25000 75000 0 0 0 75000

TOTAL 267 000 277.680

160) Name of Owner of the Crops: Kinsah Valentine ID Card NO

N

0

TYPE

OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit

Cost

Total Cost Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalypt

us trees

0 0 0 38 1000

0

3800

00

380000

TOTAL 380 000 395.200

SUB TOTAL B 25 749 705

Twenty Five Million Seven hundred and Forty Nine thousand seven Hundred and

Five Francs CFA

Page 108: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

107

Bamenda II

161) Name of Owner of the Crops : Nkwen Bingo Hospital C\o Tosam Ncham Epharim ID Card No 115305646

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL 4% Increase

Qty Unit Cost Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

1 20000 20000 71 10000 710000 730000

2 Guava Trees 2 25000 50000 0 0 0 50000

TOTAL 780 000 811.200

162) Name of Owner of the Crops :Tafor Anna Maka ID Card No113987402

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit Cost Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 25 10000 250000 250000

TOTAL 250 000 260. 000

163) Name of Owner of the Crops: Ngen Fai Valentin ID Card NO 106314485

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit Cost Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 mango trees 4 35000 140000 0 0 0 140000

2 Eucalyptus

trees

0 0 0 16 10000 160000 160000

3 Guava Trees 2 25000 50000 0 0 0 50000

TOTAL 350000 364.000

SUB TOTAL C : 1 435 200

One Million Four Hundred Thirty Five thousand Two Hundred Francs CFA

Page 109: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

108

Bamenda III

164) Name of Owner of the Crops :Awa Davide ID Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL 4% Increase

Qty Unit Cost Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F. CFA)

1 Eucalyptus

trees

0 0 0 15 10000 150000 150000

2 Pear tree 1 35000 35000 0 0 0 35000

3 Orange

Trees

0 0 0 1 5000 5000 5000

TOTAL 190 000 197 600

165) Name of Owner of the Crops :St Joseph Metropolitan Achdiocese Bamenda ID Card No

N0 TYPE OF

CROP

MATURED IMMATURED GRAND

TOTAL

Qty Unit Cost Total

Cost

Qty Unit

Cost

Total

Cost

(FCFA)

(FCFA) (F.

CFA)

1 Eucalyptus

trees

0 0 0 52 10000 52000

0

520000

TOTAL 520 000 540. 800

SUB TOTAL D : 738 400

Seven Hundred and Thirty Eight thousand Four hundred Francs CFA

Page 110: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

109

Annexe 2 : Evaluation des Nues Propriétés dans le Nord-0uest

EVALUATION AND VERIFICATION COMMISSION FOR THE REHABILITATION OF THE

BABADJOU – BAMENDA ROAD AND BAMENDA ESCARPMENT BYPASS AND THE

BAMENDA URBAN ROAD IN MEZAM DIVISION NORTH WEST REGION.

ASSESSMENT REPORT FOR LANDS IN EXECUTION OF THE METHODOLOGICAL NOTE

TRANSMITTED BY LETTER No: 00133/CF/CAB/PM OF 17TH MAY 2016.

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

1 SUH ASSAH

NUMFOR JOHN

(111336109)

L C nº: 7705 DIRECT

REGISTRATION

3150 121 10000 1210000 32670 310668 1553338

2 ATEH L C nº: 12101 DIRECT 2044 31 10000 310000 8370 79593 397963

Page 111: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

110

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

CHRISTINA

NDIKUM

(111266726)

REGISTRATION

What

ype of

land is

lost (3

WOKO

THERESE

(110860927)

L C nº: 12955 DIRECT

REGISTRATION

911 131 10000 1310000 35370 336343 1681713

4 ABONGNI

GRACE

TABIFOR

(114157575)

L C nº: 7183 DIRECT

REGISTRATION

3727 186 10000 1860000 50220 477555 2387775

5 TCHANGOUE

JEAN PIERRE

L C nº: 7592 DIRECT

REGISTRATION

1239 153 10000 1530000 41310 392828 1964138

Page 112: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

111

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

(109345009)

6 ENOH JOHN

CHU

(117379900)

IN PROCESS

FOR

REGISTRATION

B662/2015

DIRECT

REGISTRATION

577 20 10000 200000 5400 51350 256750

7 PETER AMBE

(111491349)

L C nº: 7673 DIRECT

REGISTRATION

4245 197 10000 1970000 53190 505798 2528988

8 MBA MAURICE

(117315008)

L C nº: 4516 PARTITIONING

FROM

L C Nº: 2589

612 126 10000 1260000 34020 323505 1617525

9 FORCHE

AMUNGWA

L C nº: 2333 DIRECT

REGISTRATION

2056 92 10000 920000 24840 236210 1181050

Page 113: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

112

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

EMMANUEL

C/O UNAS

LEMSI NGEU

(116934908)

10 ABONO

HUMPREY

(113650244)

L C IN

PROCESS

BAM I nº: 771

CRP nº: 61

VOL.: 25

DIRECT

REGISTRATION

1331 84 10000 840000 22680 215670 1078350

11 FUNDOH PIUS

KISANG

L C nº: 7786 DIRECT

REGISTRATION

1811 24 10000 240000 6480 61620 308100

Page 114: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

113

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

12 NDUMU

MARTIN NGU

(111628198)

L C nº: 6813 DIRECT

REGISTRATION

1510 77 10000 770000 20790 197698 988488

13 Mrs Judith

YABUA DJIMO

(109856379)

L C nº: 8496 DIRECT

REGISTRATION

960 133 10000 1330000 35910 341478 1707388

14 NKWENTI

DAVIDSON

ACHU

L C nº: 7473 DIRECT

REGISTRATION

2949 76 10000 760000 20520 195130 975650

15 GNINPEA JEAN

DANIEL

L C nº: 13107 DIRECT

REGISTRATION

914 30 10000 300000 8100 77025 385125

Page 115: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

114

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

(114658810)

16 CHOMILO

SHINWEN

SIMON

(116394877

L C nº: 7157 DIRECT

REGISTRATION

1125 608 10000 6080000 164160 1561040 7805200

17 ABONGWA

CHRISTOPHER

C/O ODETTE

TANNE

NGENUE

(1146572533)

L C nº: 6422 DIRECT

REGISTRATION

3012 10 10000 100000 2700 25675 128375

18 NDIKUM L C nº: 11460 PARTITIONING 1000 4 10000 40000 1080 10270 51350

Page 116: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

115

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

CHRISTIAN CHI

PASSPORT nº:

498704264 USA

FROM

L C Nº: 7156

19 AZIWO

TATANJA NIBA

(109487373)

L C nº: 8012 DIRECT

REGISTRATION

1641 15 10000 150000 4050 38513 192563

20 AWA

NKAMANYANG

MOSES

(109487582)

L C nº: 8787 DIRECT

REGISTRATION

3826 180 10000 1800000 48600 462150 2310750

21 CHICK ERIC

(117347833)

L C nº: 8788 DIRECT

REGISTRATION

3827 136 10000 1360000 36720 349180 1745900

Page 117: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

116

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

22 LUKONG

CORNELIUS FAI

( 113934394)

L C nº: 7067 TOTAL

ALIENATION

3094 129 10000 1290000 34830 331208 1656038

23 AMAH

PUNGONG Nee

GRACE KISOB

(110069877)

L C nº: 7823 DIRECT

REGISTRATION

2465 195 10000 1950000 52650 500663 2503313

24 AKENJI FON

IGNATIUS

(108021407)

OR

ECOLE DES

L C nº: 4711 DIRECT

REGISTRATION

10342 504 10000 5040000 136080 1294020 6470100

Page 118: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

117

NO NAME AND

SURNAMES

(ID NUMBER)

LAND

CERTIFICATE

NUMBER

ORIGIN OF

PROPERTY

TOTAL

SURFACE

AREA OF

PLOT

SURFACE

AREA TO BE

EXPROPRITED

(A)

PRICE

PER

SQUARE

METER

(B)

AMOUNT

(C) =

(A x B)

INFLECTION

VALUE

(2.7%)

(D) =

2.7%(C)

ANCILLARY

VALUE

(25%)

(E) =

25%(C+D)

TOTAL

AMOUNT

CFA

(F) =

(C+D+E)

CHAMPION C/O

TAMACHAMBI

epse NYINGHO

REGINE

NGENUE

(110940030)

25 NJI LINUS

CHITABANG &

NTUM

ANDERSON NJI

(107813960)

L C nº: 4522 DIRECT

REGISTRATION

153 3 10000 30000 810 7703 38513

TOTAL 58521 3265 250000 32650000 881550 8382888 41.914.438

Page 119: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

118

BEING FORTY-ONE MILLION NINE HUNDRED AND FOURTEEN THOUSAND FOUR HUNDRED AND

THIRTY-EIGHTY FRANCS CFA.

Page 120: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

119

Annexe 3 : Etat des biens dans les Bamboutos

ETAT DES BIENS DANS LES BAMBOUTOS : les détails sur les quantités de ces biens sont disponibles en version HARD et mis à la disposition de la

Cellule BAD/BM

ETAT D’EXPERTISE CONSOLIDE DES BIENS MIS EN CAUSE DANS LE CADRE DU PROJET DE RECONSTRUCTION DE LA ROUTE BABADJOU-

BAMENDA

(Selon les prescriptions de la Banque mondiale)

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

1

ASSOCIATION des

témoins de Jeovah rép par

LONTIO

- 0 52000 0 52 000

2 BECHELE 107920684 0 408096 0 408 096

3 BEKWANG Régine 110304597 0 201760 0 201 760

4 BOUGNA 114367752 0 0 4395600 4 395 600

5 BOUGNIA Cathérine 111488956 0 2600 0 2 600

6 BUSCHY Gérome

LANOE 110323370 0 276016 0 276 016

7 CHIA MARY NAMBU 117645971 0 10920 0 10 920

8 CHOLONG Martin 114558079 0 52000 0 52 000

9 DAGUEHO Helen 118412984 0 140400 0 140 400

10 DAKO josephine 109196316 0 299780 0 299 780

Page 121: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

120

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

11 DAPEU NDASSANG

LOUISE 110879584 0 0 3528000 3 528 000

12 DEMBENG Anatole 106018026 0 229216 0 229 216

13 DESAP DZINTA

Chrispose (111301018) 111301018 0 148200 0 148 200

14 DIFFO Célestin 110601459 0 53144 0 53 144

15 DJEUDJI Félicité 114030155 0 374504 0 374 504

16 DJEUTA DAVID 112258057 0 1376000 1 376 000

17 DJIHO YEMELI Louis

Robert 113051564 0 1135200 1 135 200

18 DJIMELA GILBERT 108109795 0 2154600 2 154 600

19 DJIPAP pascal 109159621 0 4738230 4 738 230

20 DJOWE Joseph 111301196 0 5720 0 5 720

21 DOUANLA Richard 112308757 0 330928 0 330 928

22 DOUNLA SYLVIE 113046917 0 134992 0 134 992

23 DZE Pascal (117662527) 117662527 0 372424 0 372 424

24 DZEULA Félicien 116381197 0 199056 0 199 056

25 DZEUTA Gaelle Prudence 111462742 0 12480 0 12 480

26 DZEUTOUO Eric 109159801 0 439816 0 439 816

27 DZOUMABOU 1136428526 0 104000 0 104 000

28 FOBAH Jean 117844138 0 33488 0 33 488

29 FOBASSO Boniface 115380795 0 16380 16 380

Page 122: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

121

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

30 FOKONG Boniface 117374340 0 2437785 2 437 785

31 FOKOU VINCENT 110304907 0 333788 0 333 788

32 FOLAK 110641939 0 24960 0 24 960

33 FOMA Victor 117374050 0 17264 0 17 264

34 FOMANO Bernard 108240902 0 1287000 0 1 287 000

35 FOMEA Daniel 107921614 0 498420 0 498 420

36 FOMENA DANIEL 107921614 0 184080 0 184 080

37 FONTSA Etienne 118933969 0 88400 0 88 400

38 FOPA Jeannette 1185660296 0 454480 0 454 480

39 FOPPA Marguérite 113643839 0 82368 0 82 368

40 FOTIO ANTONY 113976949 0 3333000 3 333 000

41 FOTOUO KAMTA

Romuald 110643297 0 690040 0 690 040

42 FOTSA Donatienne 110579222 0 96980 0 96 980

43 FOUGANG Barnabé 108021001 0 146120 0 146 120

44 FOUGANG Etienne 105918160 0 40560 0 40 560

45 FOUKOU Barnabé 110641540 0 519584 0 519 584

46 FUYEM LOZE 119329411 0 26520 0 26 520

47 GOUEMAZON Sylvie 118239473 0 146640 0 146 640

48 GOUEPEGUEU Henriette

(113051810) 113051810 0 176228 0 176 228

49 HAWE IBRAHIM 110323385 0 96200 0 96 200

Page 123: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

122

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

50 KAFFO Bertrand 108478850 0 905400 905 400

51 KAFFO Boniface 110995970 0 59696 0 59 696

52 KAÏPA LACMAGO Guy

Roger 1076148943 0 393952 0 393 952

53 KALEWOU Roger

Ledoux 117374410 0 257920 0 257 920

54 KAMLONG Richard 111301138 0 62400 0 62 400

55 KAMTA Zavier 118132187 0 238160 0 238 160

56 KEMTSOP KENGNE

Judith 117271702 0 106080 0 106 080

57 KENE Véronique 116784348 0 59852 0 59 852

58

KENMTA Fidèle rép par

NGUENLEWOU

MICHAEL FLOUBERT

1194868954 0 57200 0 57 200

59 KEUBOU Marie 1189336565 0 1321920 1 321 920

60 KITIO TENGWE

Appoline D 119074114 0 382720 0 382 720

61 KOGLI Joseph 112659094 0 907632 907 632

62 KOGNODJUI Jeanne 117662510 0 40560 0 40 560

63 KONGMOGNIE Florence 112659388 0 55744 0 55 744

64 KONLAC Jean 111666403 0 72800 0 72 800

65 KOULE Pierre

(106832413) 106832413 0 558064 0 558 064

Page 124: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

123

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

66 KOUMATOUO Marceline 113599693 0 194740 0 194 740

67 KOUONLAK Therese 110304935 0 141024 0 141 024

68 KOUTI Alexis Blaise 108566885 0 673816 0 673 816

69 KUETE Claude 115585636 0 100984 0 100 984

70 KUETE Raymond 109159984 0 9152 0 9 152

71 KUITSOUH Jean Baptiste 116653298 0 11960 0 11 960

72 KUO Renette Celine 108663402 0 107380 0 107 380

73 LACMAGO Bernard 109506308 0 5266800 5 266 800

74 LACMANGO Norbert 114014018 0 58240 0 58 240

75 LACTOUO Johanne 105915390 0 73840 0 73 840

76 LAFOUE Modestine 112414443 0 33540 0 33 540

77 LAKLONG Thomas 113642723 0 428584 0 428 584

78 LAKMAGO Bernard 109506308 0 627848 0 627 848

79 LAKMAGO Bernard 109506308 0 394784 0 394 784

80 LALOCK Antoinnette 110300202 0 161044 0 161 044

81 LALONG Simo 113642713 0 66456 0 66 456

82 LALONG Simon 113642713 0 193960 0 193 960

83

LALONG Simon Robert

rép par TCHOFFO

JONAS

117374171 0 460200 0 460 200

84 LAMAGO Marie 115805666 0 121160 0 121 160

85 LAMBOU Chanceline 1130463080 0 55120 0 55 120

Page 125: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

124

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

86 LELE MARTIN 117374437 0 658320 0 658 320

87 LEMOULA TSOTEZO

Nathan 116620246 0 71500 0 71 500

88 LEMOUSOC Etienne 107648637 0 17160 0 17 160

89 LEMOUSSOCK Etienne 107648637 0 3686400 3 686 400

90 LEPATOU Marcel Bruno 109177346 0 19240 0 19 240

91 LEPATOUO François 112940845 0 492024 0 492 024

92 LEPAWA Suzanne 113642763 0 5200 0 5 200

93 LONFO Bertin 116784360 0 177216 0 177 216

94 LONLA Pierre Barnabé 110392636 0 172224 0 172 224

95 LONPA Marie 117844351 0 53040 0 53 040

96 LONTOUO Thomas 109159549 0 13416 0 13 416

97 LOPEZ Jean Bosco 110808447 0 99320 0 99 320

98 LOVELINE Tuohshiri 114622294 0 332592 0 332 592

99 MADA 114367435 0 62400 0 62 400

100 MADAHA Julienne

Florence 112940886 0 92612 0 92 612

101 MADJI Colette 112943773 0 144144 0 144 144

102 MADJI Julienne 106052613 0 1190160 1 190 160

103 MADZEU MARIE NOEL 1111011703 0 52936 0 52 936

104 MAFFO Cathérine 113599385 0 39936 0 39 936

Page 126: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

125

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

105 MAFFO

Martin(110755415) 110755415 0 52208 0 52 208

106 MAFOLOCK Yemeli

honorine(116784351) 116784351 0 50960 0 50 960

107 MAGHANGUEHOUA

Ghislain Billy 118933940 0 32240 0 32 240

108 MAGNE TATSINKOU

Adéline 112865951 0 45500 0 45 500

109 MAGNI Véronique 112659098 0 228800 0 228 800

110 MAGNIGOU Catherine 113643407 0 27820 0 27 820

111 MAGNIGOUE

CATHERINE 10158377 0 7328880 7 328 880

112 MAGNILACK Esther

Brigitte 113643048 0 130000 0 130 000

113 MAGNILAK épse

NGUELEUWOU Esther 113643048 0 187824 0 187 824

114 MAGOUFO

MARGUERITE 110641878 0 699840 699 840

115 MAGOUI Delphine

Salego 108053758 0 47060 0 47 060

116 MAGUELONG

Odette(117695538) 117695538 0 328640 0 328 640

117 MAGUEPOUO Jacqueline 114018054 0 124592 0 124 592

118 MAJUKO MBOUZOU

SAHA B 110279277 0 42432 0 42 432

Page 127: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

126

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

119 MAKWATE Peitchoffo

Justine 110955837 0 2600 0 2 600

120 MANTO ROSE 112659276 0 41600 0 41 600

121 MAPOUO Suzanne 106052528 0 597480 0 597 480

122 Martin MOUKORI 116534825 0 156650 0 156 650

123 MASSAP Cathérine 1100038432 0 69680 0 69 680

124 MATSA Veronique 112659098 0 24960 0 24 960

125 MATSA Véronique 112659098 0 211744 0 211 744

126 MBASSA TCHOFFO

Alexis 108095791 0 72904 0 72 904

127 MBOUBO Thomas 113051957 0 54600 0 54 600

128 MBOUBO Thomas 113051957 0 95160 0 95 160

129 MBOUBO Thomas 113051957 0 826848 826 848

130 MBOUGNA LAMAGOK

Barbara 0 2349000 2 349 000

131 MBOUGOUE Therese 114018344 0 58448 0 58 448

132 MEGOUO Monique 116653102 0 194272 0 194 272

133 MEKONTSO Barthelemy 111156951 0 14040 0 14 040

134 MEKONTSO Charles 114018444 0 20800 0 20 800

135 MEKONTSO Dieudonné 108239026 0 212680 0 212 680

136 MELI Eric 108960016 0 42536 0 42 536

137 MELOU Georges 107200175 0 312260 0 312 260

Page 128: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

127

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

138 MEWA Flaubert 112940675 0 63440 0 63 440

139 MOFFO Josephe 118843597 0 171600 0 171 600

140 MOFFO Micheal 117286807 0 256880 0 256 880

141 MOFFO Pièrre 108240707 0 39000 0 39 000

142 MOFO Diedonné 116556328 0 582504 0 582 504

143 MOGOU Florence 110300277 0 227240 0 227 240

144 MOUMPA Martine 105917774 0 226200 0 226 200

145 NAH Debora 114307990 0 370656 0 370 656

146 NANA PIERRETTE 119329239 0 83200 0 83 200

147 NCHINDA TIZI Innocent 117152361 0 212576 0 212 576

148 NDAHO Margueret 114316591 0 1560 0 1 560

149 NDOBOU cathérine 102203203 0 46800 0 46 800

150 NDONGLA Marguerite 113600878 0 104832 0 104 832

151 NDOUONFOUK

Veronique 112308944 0 68120 0 68 120

152 NDOWO Jean 110304778 0 37544 0 37 544

153 NGAFFO Pauline 113046589 0 356928 0 356 928

154 NGHETCHEJEU

Christophe 113843110 0 55120 0 55 120

155 Ngmeuloyé Jonas 113800890 0 11752 0 11 752

156 NGOFFOCHI Sylviane 116398812 0 230672 0 230 672

157 NGOUA Joseph 107921678 0 137280 0 137 280

Page 129: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

128

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

158 NGOUAGNIA Joseph 111465206 0 542776 0 542 776

159 NGOUEGNI Béatrice

Alina 117405906 0 46800 0 46 800

160 NGOUEGNI CHARLO

TITE 113599840 0 119184 0 119 184

161 NGOUEGNI Odette 112258144 0 17940 0 17 940

162 NGOUEKAM Madeleine 108240702 0 274872 0 274 872

163 NGOUGNE Généviéve 111666306 0 15600 0 15 600

164 NGOUMETA Pauline 108377139 0 215280 0 215 280

165 NGOUODOGO 109159673 0 117520 0 117 520

166 NGOUPEQUE 110995547 0 247520 0 247 520

167 NGUEGANG RITA

Alphonsine 118335659 0 136032 0 136 032

168 NGUEKA TCHINDA

HELENE 110825904 0 3632370 3 632 370

169 NGUELEWOU Jonas 113046760 0 106080 0 106 080

170 NGUEMAZON 114307778 0 74360 0 74 360

171 NGUEMETA Jean Pierre 111074645 0 42120 0 42 120

172 NGUEPEGHEU

Philomène 111465558 0 43680 0 43 680

173 NGUETSA née

NGUENANG Emiliènne 116401924 0 185120 0 185 120

174 NGUEULEWU

LEMOUPACK Polycape 113600684 0 159120 0 159 120

Page 130: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

129

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

175 NGULADJIO Jenest 107528093 0 86736 86 736

176 NGWEYI MARTINA 111492503 0 86060 0 86 060

177 NIMPA FOKOU Jose

Armel 0 262080 0 262 080

178 NJOUE Joseph 111301196 0 28080 0 28 080

179 NJOUMESSI Matchieu 110937783 0 45136 0 45 136

180 NKONLACK Josué 114367748 0 11440 0 11 440

181 NKONLACK Samiel 107879788 0 157300 0 157 300

182 NKOUETE KAPLAK

Odette 117323300 0 360256 0 360 256

183 NOBOU DIEUDONNE 110271118 0 650520 0 650 520

184 NOLAK Emmanuel 110323384 0 254800 0 254 800

185 NOUCHI Felix 114018234 0 124280 0 124 280

186 NOULAYE Berthe 117286702 0 77168 0 77 168

187 NOUTSAMO Boniface 106469105 0 26520 0 26 520

188 NOUZA JEAN PIERRE 116044895 0 223366 0 223 366

189 NZOUDA Joseph 111488793 0 154284 0 154 284

190 NZOUSSE Apalinaire 109512790 0 22880 0 22 880

191 NZOYEM Jean 117071289 0 72800 0 72 800

192 PEDJIZAM Martin 111080763 0 788320 0 788 320

193 PEFOUHO Marguerite 110300205 0 56940 0 56 940

194 PEGANOU 111079941 0 2882250 2 882 250

Page 131: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

130

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

195 PEHOUTSUE Pauline 117695734 0 141544 0 141 544

196 PEKET

Léonie(117695526) 117695526 0 273650 0 273 650

197 PENABOU Christine 106052764 0 357552 0 357 552

198 PENAYE ROSALINE 115585563 0 1621620 1 621 620

199 PEPA Michel 119486669 0 1128960 1 128 960

200 PEPA Bertrand 116044896 0 659360 0 659 360

201 PEPA MICHEL 119486669 0 101296 0 101 296

202 PEPA Michiel 119486669 0 326560 0 326 560

203 PEZONHO Joseph 115805601 0 182000 0 182 000

204 PEZONHO Madeleine 111488901 0 818480 0 818 480

205 PONGNE ROBERT 110279378 0 3284820 3 284 820

206 ROGWZANLOUG

Brigitte 117690328 0 64480 0 64 480

207 SAAH LONGLACK

Mathilde 111462618 0 102960 0 102 960

208 SAAH LONGLACK

Mathilde 111462618 0 20384 0 20 384

209 SABANKENG

BONIFACE 109685776 0 84656 0 84 656

210 SAHA FERDINAND 104924837 0 163072 0 163 072

211 SATSAP Marie 111301204 0 16744 0 16 744

212 SILABI Anne 111080601 0 42848 0 42 848

Page 132: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

131

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

213 SOCNING Victoir 113046206 0 277368 0 277 368

214 SOCNING Victoir 113046206 0 15496 0 15 496

215 SONHAFOUO Ugobert 119073082 0 237952 0 237 952

216 SONKOUAT Robert 108518669 0 115960 0 115 960

217 SOUFO Augustin 113051890 0 7800 0 7 800

218 TABOU Charles 112813637 0 4373460 4 373 460

219 TABOU Charles 112813637 0 2722500 2 722 500

220 TADAH Martin 117271617 0 118040 0 118 040

221 TADJITID Benjamin 113600971 0 1764000 1 764 000

222 TAFOKO Etienne 111301135 0 128440 0 128 440

223 TAFOTOUO Daniel 110169258 0 114920 0 114 920

224 TAIM CORTES Ocariz 114316700 0 44304 0 44 304

225 TAKUETE Jacque 115805656 0 160056 0 160 056

226 TALELEMOLA Gaspard 107765749 0 54080 0 54 080

227 TANDAA Michel 113046628 0 192400 0 192 400

228 TANKEU Gabriel 119299169 0 40560 0 40 560

229 TATCHINDA Donat 108240960 0 62816 0 62 816

230 TATUFRU Charles 112016994 0 60528 0 60 528

231 TCHAYEMESAP

Appauline Cabine 111201694 0 41288 0 41 288

232 TCHEUPEUZE Monique 117690007 0 19760 0 19 760

233 TCHI Thomas 107653525 0 376168 0 376 168

Page 133: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

132

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

234 TCHINDA Jean 109512972 0 932360 0 932 360

235 TCHOFFO Charles 114018152 0 252720 0 252 720

236 TCHOFFO Fidèle 114307613 0 61100 0 61 100

237 TCHOFFO James 109811434 0 487500 0 487 500

238 TCHOFFO JEAN 109683390 132600 1 632 960 1 765 560

239 TCHOFFO Jean Bernard 113642636 0 51480 0 51 480

240 TCHOFFO Jean Jacques 108557775 0 101504 0 101 504

241 TCHOFFO Jonas 117741712 0 233350 0 233 350

242 TCHOFFO Michel 114316622 0 488072 0 488 072

243 TCHOUALA Théophile 114550514 0 3515400 3 515 400

244 TCHOUMO Pierre Marie 10768543 0 340288 0 340 288

245 TCHOUPEA Narcisse

Laurent 109178637 0 364000 0 364 000

246 TEGOU Emmanuel 113769985 0 764920 0 764 920

247 TEJIBOU Cathérine 114367609 0 162448 0 162 448

248 TEJILEKOUE Jean Marie 113642843 0 282880 0 282 880

249 TENING MOFFO 113046914 0 29848 0 29 848

250 TETOUO PEFETEHO

Louicien 109195827 0 5720 0 5 720

251 TIOTSOP Pièrre 118943770 0 351728 0 351 728

252 TIOYEM 104001643 0 78312 0 78 312

253 TIWA 1186394115 0 46280 0 46 280

Page 134: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

133

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

254 TIWO Thomas 114623742 0 245960 0 245 960

255 TOUOKOUONG Aloys 114623963 0 176800 0 176 800

256 TOUOLA Christophe 113942012 0 7800 0 7 800

257 TOUOWO 114316874 0 943072 0 943 072

258 TOUYEM Elise 112940890 0 372528 0 372 528

259 TOUYEM Jean Bosco 0 54600 0 54 600

260 TOUOYEM Charles 114018143 2964000 0 0 2 964 000

261 TOYEM Elise 112940890 0 201760 0 201 760

262 TOYEM Joseph 110301825 0 237640 0 237 640

263 TSAFFO Nguelewou

Barnabé 106933740 0 29744 0 29 744

264 TSAGA Regine 114307711 0 107120 0 107 120

265 TSAGUE GISELE Rep.

par LEKOBOU Robert 111301176 0 3456000 3 456 000

266 TSAN Jonas 110300354 0 179400 0 179 400

267 TSAPI Blandine Epse

Konzeu 109178972 0 141024 0 141 024

268 TSAPNDOUNG

CHÂTEAU Brillant 109196128 0 185120 0 185 120

269 TSAYEM Marceline 11107520 0 232440 0 232 440

270 TSOTEZO Monique 113599387 0 109408 0 109 408

271 TSUALLA Jean

SAPLONGMO 107652508 0 28860 0 28 860

Page 135: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

134

N° NOM ET PRENOMS N° CNI Terrains Cultures et

arbres cultivés

Constructions

ou autres

mises en

valeur

Indemnisation

total

272 Voisine de Ngoffo

jacqueline 0 2600 0 2 600

273 WALAZOU FLAUBINE 111462620 0 12480 0 12 480

274 WAPONGWO SUSANA

Fotang 1136410569 0 470392 0 470 392

275 WIRBA SAFIATU

JUMAI 112105101 0 15600 0 15 600

276 WOPONGWO Suzana

fotang 113641056 0 69732 0 69 732

277 WOZANG Victorine 111075289 0 111514 0 111 514

278 YABA PETSAHO

Angeline 112016832 0 365560 0 365 560

279 YANGOUE Moïse 111462580 0 407888 0 407 888

280 YEMELI Suzane 114367960 0 278304 0 278 304

281 ZANGUE Suzanne 1196478333 0 287456 0 287 456

282 ZENHO TADAHA

Boniface 113046759 0 242632 0 242 632

283 ZOUDA Denise 111074606 0 43160 0 43 160

TOTAL 3096600 46185802 77595635 126 878 037

Page 136: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

135

ETAT D’EXPERTISE DES CULTURES MISES EN CAUSE DANS LE CADRE DU PROJET DE RECONSTRUCTION DE LA ROUTE BABADJOU –

BAMENDA (MBAMBOUTOS) BANQUE MONDIALE

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

ASSOCIATION des témoins de

Jeovah rép par LONTIO

50 000 2 000 52 000

BECHELE 107920684 392 400 15 696 408 096

BEKWANG Régine 110304597 194 000 7 760 201 760

BOUGNIA Cathérine 111488956 2 500 100 2 600

BUSCHY Gérome LANOE 110323370 265 400 10 616 276 016

CHIA MARY NAMBU 117645971 10 500 420 10 920

CHOLONG Martin 114558079 50 000 2 000 52 000

DAGUEHO Helen 118412984 135 000 5 400 140 400

DAKO josephine 109196316 288 250 11 530 299 780

DEMBENG Anatole 106018026 220 400 8 816 229 216

DESAP DZINTA Chrispose 111301018 142 500 5 700 148 200

DIFFO Célestin 110601459 51 100 2 044 53 144

DJEUDJI Félicité 114030155 360 100 14 404 374 504

DJOWE Joseph 111301196 5 500 220 5 720

DOUANLA Richard 112308757 318 200 12 728 330 928

DOUNLA SYLVIE 113046917 129 800 5 192 134 992

DZE Pascal (117662527) 117662527 358 100 14 324 372 424

Page 137: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

136

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

DZEULA Félicien 116381197 191 400 7 656 199 056

DZEUTA Gaelle Prudence 111462742 12 000 480 12 480

DZEUTOUO Eric 109159801 422 900 16 916 439 816

DZOUMABOU 1136428526 100 000 4 000 104 000

FOBAH Jean 117844138 32 200 1 288 33 488

FOBASSO Boniface 115380795 15 750 630 16 380

FOKOU VINCENT 110304907 320 950 12 838 333 788

FOLAK 110641939 24 000 960 24 960

FOMA Victor 117374050 16 600 664 17 264

FOMANO Bernard 108240902 1 237 500 49 500 1 287 000

FOMEA Daniel 107921614 479 250 19 170 498 420

FOMENA DANIEL 107921614 177 000 7 080 184 080

FONTSA Etienne 118933969 85 000 3 400 88 400

FOPA Jeannette 1185660296 437 000 17 480 454 480

FOPPA Marguérite 113643839 79 200 3 168 82 368

FOTOUO KAMTA Romuald 110643297 663 500 26 540 690 040

FOTSA Donatienne 110579222 93 250 3 730 96 980

FOUGANG Barnabé 108021001 140 500 5 620 146 120

FOUGANG Etienne 105918160 39 000 1 560 40 560

FOUKOU Barnabé 110641540 499 600 19 984 519 584

Page 138: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

137

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

FUYEM LOZE 119329411 25 500 1 020 26 520

GOUEMAZON Sylvie 118239473 141 000 5 640 146 640

GOUEPEGUEU Henriette 113051810 169 450 6 778 176 228

HAWE IBRAHIM 110323385 92 500 3 700 96 200

KAFFO Boniface 110995970 57 400 2 296 59 696

KAÏPA LACMAGO Guy Roger 1076148943 378 800 15 152 393 952

KALEWOU Roger Ledoux 117374410 248 000 9 920 257 920

KAMLONG Richard 111301138 60 000 2 400 62 400

KAMTA Zavier 118132187 229 000 9 160 238 160

KEMTSOP KENGNE Judith 117271702 102 000 4 080 106 080

KENE Véronique 116784348 57 550 2 302 59 852

KENMTA Fidèle rép par

NGUENLEWOU MICHAEL

FLOUBERT 1194868954 55 000 2 200 57 200

KITIO TENGWE Appoline D 119074114 368 000 14 720 382 720

KOGNODJUI Jeanne 117662510 39 000 1 560 40 560

KONGMOGNIE Florence 112659388 53 600 2 144 55 744

KONLAC Jean 111666403 70 000 2 800 72 800

KOULE Pierre 106832413 536 600 21 464 558 064

KOUMATOUO Marceline 113599693 187 250 7 490 194 740

KOUONLAK Therese 110304935 135 600 5 424 141 024

Page 139: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

138

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

KOUTI Alexis Blaise 108566885 647 900 25 916 673 816

KUETE Claude 115585636 97 100 3 884 100 984

KUETE Raymond 109159984 8 800 352 9 152

KUITSOUH Jean Baptiste 116653298 11 500 460 11 960

KUO Renette Celine 108663402 103 250 4 130 107 380

LACMANGO Norbert 114014018 56 000 2 240 58 240

LACTOUO Johanne 105915390 71 000 2 840 73 840

LAFOUE Modestine 112414443 32 250 1 290 33 540

LAKLONG Thomas 113642723 412 100 16 484 428 584

LAKMAGO Bernard 109506308 603 700 24 148 627 848

LAKMAGO Bernard 109506308 379 600 15 184 394 784

LALOCK Antoinnette 110300202 154 850 6 194 161 044

LALONG Simo 113642713 63 900 2 556 66 456

LALONG Simon 113642713 186 500 7 460 193 960

LALONG Simon Robert rép par

TCHOFFO JONAS 117374171 442 500 17 700 460 200

LAMAGO Marie 115805666 116 500 4 660 121 160

LAMBOU Chanceline 1130463080 53 000 2 120 55 120

LELE MARTIN 117374437 633 000 25 320 658 320

LEMOULA TSOTEZO Nathan 116620246 68 750 2 750 71 500

Page 140: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

139

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

LEMOUSOC Etienne 107648637 16 500 660 17 160

LEPATOU Marcel Bruno 109177346 18 500 740 19 240

LEPATOUO François 112940845 473 100 18 924 492 024

LEPAWA Suzanne 113642763 5 000 200 5 200

LONFO Bertin 116784360 170 400 6 816 177 216

LONLA Pierre Barnabé 110392636 165 600 6 624 172 224

LONPA Marie 117844351 51 000 2 040 53 040

LONTOUO Thomas 109159549 12 900 516 13 416

LOPEZ Jean Bosco 110808447 95 500 3 820 99 320

LOVELINE Tuohshiri 114622294 319 800 12 792 332 592

MADA 114367435 60 000 2 400 62 400

MADAHA Julienne Florence 112940886 89 050 3 562 92 612

MADJI Colette 112943773 138 600 5 544 144 144

MADZEU MARIE NOEL 1111011703 50 900 2 036 52 936

MAFFO Cathérine 113599385 38 400 1 536 39 936

MAFFO Martin 110755415 50 200 2 008 52 208

MAFOLOCK Yemeli honorine 116784351 49 000 1 960 50 960

MAGHANGUEHOUA Ghislain Billy 118933940 31 000 1 240 32 240

MAGNE TATSINKOU Adéline 112865951 43 750 1 750 45 500

MAGNI Véronique 112659098 220 000 8 800 228 800

Page 141: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

140

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

MAGNIGOU Catherine 113643407 26 750 1 070 27 820

MAGNILACK Esther Brigitte 113643048 125 000 5 000 130 000

MAGNILAK épse NGUELEUWOU

Esther 113643048 180 600 7 224 187 824

MAGOUI Delphine Salego 108053758 45 250 1 810 47 060

MAGUELONG Odette 117695538 316 000 12 640 328 640

MAGUEPOUO Jacqueline 114018054 119 800 4 792 124 592

MAJUKO MBOUZOU SAHA B 110279277 40 800 1 632 42 432

MAKWATE Peitchoffo Justine 110955837 2 500 100 2 600

MANTO ROSE 112659276 40 000 1 600 41 600

MAPOUO Suzanne 106052528 574 500 22 980 597 480

Martin MOUKORI 116534825 150 625 6 025 156 650

MASSAP Cathérine 1100038432 67 000 2 680 69 680

MATSA Veronique 112659098 24 000 960 24 960

MATSA Véronique 112659098 203 600 8 144 211 744

MBASSA TCHOFFO Alexis 108095791 70 100 2 804 72 904

MBOUBO Thomas 113051957 52 500 2 100 54 600

MBOUBO Thomas 113051957 91 500 3 660 95 160

MBOUGOUE Therese 114018344 56 200 2 248 58 448

MEGOUO Monique 116653102 186 800 7 472 194 272

Page 142: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

141

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

MEKONTSO Barthelemy 111156951 13 500 540 14 040

MEKONTSO Charles 114018444 20 000 800 20 800

MEKONTSO Dieudonné 108239026 204 500 8 180 212 680

MELI Eric 108960016 40 900 1 636 42 536

MELOU Georges 107200175 300 250 12 010 312 260

MEWA Flaubert 112940675 61 000 2 440 63 440

MOFFO Josephe 118843597 165 000 6 600 171 600

MOFFO Micheal 117286807 247 000 9 880 256 880

MOFFO Pièrre 108240707 37 500 1 500 39 000

MOFO Diedonné 116556328 560 100 22 404 582 504

MOGOU Florence 110300277 218 500 8 740 227 240

MOUMPA Martine 105917774 217 500 8 700 226 200

NAH Debora 114307990 356 400 14 256 370 656

NANA PIERRETTE 119329239 80 000 3 200 83 200

NCHINDA TIZI Innocent 117152361 204 400 8 176 212 576

NDAHO Margueret 114316591 1 500 60 1 560

NDOBOU cathérine 102203203 45 000 1 800 46 800

NDONGLA Marguerite 113600878 100 800 4 032 104 832

NDOUONFOUK Veronique 112308944 65 500 2 620 68 120

NDOWO Jean 110304778 36 100 1 444 37 544

Page 143: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

142

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

NGAFFO Pauline 113046589 343 200 13 728 356 928

NGHETCHEJEU Christophe 113843110 53 000 2 120 55 120

Ngmeuloyé Jonas 113800890 11 300 452 11 752

NGOFFOCHI Sylviane 116398812 221 800 8 872 230 672

NGOUA Joseph 107921678 132 000 5 280 137 280

NGOUAGNIA Joseph 111465206 521 900 20 876 542 776

NGOUEGNI Béatrice Alina 117405906 45 000 1 800 46 800

NGOUEGNI CHARLO TITE 113599840 114 600 4 584 119 184

NGOUEGNI Odette 112258144 17 250 690 17 940

NGOUEKAM Madeleine 108240702 264 300 10 572 274 872

NGOUGNE Généviéve 111666306 15 000 600 15 600

NGOUMETA Pauline 108377139 207 000 8 280 215 280

NGOUODOGO 109159673 113 000 4 520 117 520

NGOUPEQUE 110995547 238 000 9 520 247 520

NGUEGANG RITA Alphonsine 118335659 130 800 5 232 136 032

NGUELEWOU Jonas 113046760 102 000 4 080 106 080

NGUEMAZON 114307778 71 500 2 860 74 360

NGUEMETA Jean Pierre 111074645 40 500 1 620 42 120

NGUEPEGHEU Philomène 111465558 42 000 1 680 43 680

NGUETSA née NGUENANG 116401924 178 000 7 120 185 120

Page 144: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

143

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

Emiliènne

NGUEULEWU LEMOUPACK

Polycape 113600684 153 000 6 120 159 120

NGULADJIO Jenest 107528093 83 400 3 336 86 736

NGWEYI MARTINA 111492503 82 750 3 310 86 060

NIMPA FOKOU Jose Armel

252 000 10 080 262 080

NJOUE Joseph 111301196 27 000 1 080 28 080

NJOUMESSI Matchieu 110937783 43 400 1 736 45 136

NKONLACK Josué 114367748 11 000 440 11 440

NKONLACK Samiel 107879788 151 250 6 050 157 300

NKOUETE KAPLAK Odette 117323300 346 400 13 856 360 256

NOBOU DIEUDONNE 110271118 625 500 25 020 650 520

NOLAK Emmanuel 110323384 245 000 9 800 254 800

NOUCHI Felix 114018234 119 500 4 780 124 280

NOULAYE Berthe 117286702 74 200 2 968 77 168

NOUTSAMO Boniface 106469105 25 500 1 020 26 520

NOUZA JEAN PIERRE 116044895 214 775 8 591 223 366

NZOUDA Joseph 111488793 148 350 5 934 154 284

NZOUSSE Apalinaire 109512790 22 000 880 22 880

NZOYEM Jean 117071289 70 000 2 800 72 800

Page 145: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

144

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

PEDJIZAM Martin 111080763 758 000 30 320 788 320

PEFOUHO Marguerite 110300205 54 750 2 190 56 940

PEHOUTSUE Pauline 117695734 136 100 5 444 141 544

PEKET Léonie 117695526 263 125 10 525 273 650

PENABOU Christine 106052764 343 800 13 752 357 552

PEPA Bertrand 116044896 634 000 25 360 659 360

PEPA MICHEL 119486669 97 400 3 896 101 296

PEPA Michiel 119486669 314 000 12 560 326 560

PEZONHO Joseph 115805601 175 000 7 000 182 000

PEZONHO Madeleine 111488901 787 000 31 480 818 480

ROGWZANLOUG Brigitte 117690328 62 000 2 480 64 480

SAAH LONGLACK Mathilde 111462618 99 000 3 960 102 960

SAAH LONGLACK Mathilde 111462618 19 600 784 20 384

SABANKENG BONIFACE 109685776 81 400 3 256 84 656

SAHA FERDINAND 104924837 156 800 6 272 163 072

SATSAP Marie 111301204 16 100 644 16 744

SILABI Anne 111080601 41 200 1 648 42 848

SOCNING Victoir 113046206 266 700 10 668 277 368

SOCNING Victoir 113046206 14 900 596 15 496

SONHAFOUO Ugobert 119073082 228 800 9 152 237 952

Page 146: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

145

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

SONKOUAT Robert 108518669 111 500 4 460 115 960

SOUFO Augustin 113051890 7 500 300 7 800

TADAH Martin 117271617 113 500 4 540 118 040

TAFOKO Etienne 111301135 123 500 4 940 128 440

TAFOTOUO Daniel 110169258 110 500 4 420 114 920

TAIM CORTES Ocariz 114316700 42 600 1 704 44 304

TAKUETE Jacque 115805656 153 900 6 156 160 056

TALELEMOLA Gaspard 107765749 52 000 2 080 54 080

TANDAA Michel 113046628 185 000 7 400 192 400

TANKEU Gabriel 119299169 39 000 1 560 40 560

TATCHINDA Donat 108240960 60 400 2 416 62 816

TATUFRU Charles 112016994 58 200 2 328 60 528

TCHAYEMESAP Appauline Cabine 111201694 39 700 1 588 41 288

TCHEUPEUZE Monique 117690007 19 000 760 19 760

TCHI Thomas 107653525 361 700 14 468 376 168

TCHINDA Jean 109512972 896 500 35 860 932 360

TCHOFFO Charles 114018152 243 000 9 720 252 720

TCHOFFO Fidèle 114307613 58 750 2 350 61 100

TCHOFFO James 109811434 468 750 18 750 487 500

TCHOFFO Jean Bernard 113642636 49 500 1 980 51 480

Page 147: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

146

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

TCHOFFO Jean Jacques 108557775 97 600 3 904 101 504

TCHOFFO Jonas 117741712 224 375 8 975 233 350

TCHOFFO Michel 114316622 469 300 18 772 488 072

TCHOUMO Pierre Marie 10768543 327 200 13 088 340 288

TCHOUPEA Narcisse Laurent 109178637 350 000 14 000 364 000

TEGOU Emmanuel 113769985 735 500 29 420 764 920

TEJIBOU Cathérine 114367609 156 200 6 248 162 448

TEJILEKOUE Jean Marie 113642843 272 000 10 880 282 880

TENING MOFFO 113046914 28 700 1 148 29 848

TETOUO PEFETEHO Louicien 109195827 5 500 220 5 720

TIOTSOP Pièrre 118943770 338 200 13 528 351 728

TIOYEM 104001643 75 300 3 012 78 312

TIWA 1186394115 44 500 1 780 46 280

TIWO Thomas 114623742 236 500 9 460 245 960

TOUOKOUONG Aloys 114623963 170 000 6 800 176 800

TOUOLA Christophe 113942012 7 500 300 7 800

TOUOWO 114316874 906 800 36 272 943 072

TOUYEM Elise 112940890 358 200 14 328 372 528

TOUYEM Jean Bosco

52 500 2 100 54 600

TOYEM Elise 112940890 194 000 7 760 201 760

Page 148: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

147

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

TOYEM Joseph 110301825 228 500 9 140 237 640

TSAFFO Nguelewou Barnabé 106933740 28 600 1 144 29 744

TSAGA Regine 114307711 103 000 4 120 107 120

TSAN Jonas 110300354 172 500 6 900 179 400

TSAPI Blandine Epse Konzeu 109178972 135 600 5 424 141 024

TSAPNDOUNG CHÂTEAU Brillant 109196128 178 000 7 120 185 120

TSAYEM Marceline 11107520 223 500 8 940 232 440

TSOTEZO Monique 113599387 105 200 4 208 109 408

TSUALLA Jean SAPLONGMO 107652508 27 750 1 110 28 860

Voisine de Ngoffo jacqueline

2 500 100 2 600

WALAZOU FLAUBINE 111462620 12 000 480 12 480

WAPONGWO SUSANA Fotang 1136410569 452 300 18 092 470 392

WIRBA SAFIATU JUMAI 112105101 15 000 600 15 600

WOPONGWO Suzana fotang 113641056 67 050 2 682 69 732

WOZANG Victorine 111075289 107 225 4 289 111 514

YABA PETSAHO Angeline 112016832 351 500 14 060 365 560

YANGOUE Moïse 111462580 392 200 15 688 407 888

YEMELI Suzane 114367960 267 600 10 704 278 304

ZANGUE Suzanne 1196478333 276 400 11 056 287 456

ZENHO TADAHA Boniface 113046759 233 300 9 332 242 632

Page 149: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

148

NOM ET PRENOMS N° CNI Cout de la

spéculation

4% de coût

de

spéculation

Cout total

des

spéculations

majoré de

4%

ZOUDA Denise 111074606 41 500 1 660 43 160

TOTAL

44 409

425 46 185 802

Page 150: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

149

Annexe 4: Etat des constructions dans la Mezam

ÉVALUATION FINANCIERE, DES CONSTRUCTIONS ET BIENS MISES EN CAUSE DANS LE PROJET RELATIF

AUX TRAVAUX DE REHABILITATION DE LA VOIE D’ACCES BABADJOU-BAMENDA, CONTOURNEMENT DE

L’ESCARPEMENT DE BAMENDA ET DE LA VOIRIE URBAINE

RECAPITULATIF

A) ARRONDISSEMENT DE SANTA

n° Nom N° CNI N° TEL. Montant

1 KAN PAYNE ELROY MOSES 115851015 696 183 200/ 674 702 025 7 850 900

TOTAL (A) 7 850 900

B) ARRONDISSEMENT DE BAMENDA I

2 SUH ASSAH NUMFOR JOHN 111336109 694 247 183 7 794 690

3 MANTHO FLORENTINE MIMI 115049004 ……….. 3 107 950

4 CHUBON ABEL 110641134 677 587 840 7 945 000

5 TCHOKOMENI BILLY

CARTER 116167416 679 883 126/ 696 970 800/ 679 369 536 705 700

6 EMMANUEL NDUMU 114804670 677 191 720 2 594 000

7 TATSAH DIVINE ……….. ……….. 782 500

8 AKEMCHE AHMADOU ABIH 117806801 677 896 599 2 594 100

9 JUSTINE Epse. TITA

BUOWUTIELU 111484127 675 265 632 4 972 100

Page 151: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

150

10 ENOH JOHN CHU 117379900 670 555 233/ 678 924 592 2 253 500

11 TAKWE TAMANJONG

AUGUSTIN 1176918597 679 133 900 705 900

12

JOSEPH FORBITEM NDUMU

C/O NGWENUI MAGDALENE

NDIFOR

110860096 676 234 001 4 358 200

13 PETER AMBE 111491349 699 877 780/676 320 398 544 800

14 ABONGWA CHRISTOPHER

C/O ODETTE TANUE NGENUE 1146572533 677 485 970 1 446 500

15 AYOUNG TIMOTHY NGU 108627523 675 726 743 2 822 000

16 PATIENCE EPS ABONGWA

MESHY NGWA 113858838 677 644 228 6 240 700

17 FRANCISCA MUMA C/O

MUMA PROTUS MUMA 107984186 673 392 990/679 200 063 2 634 600

18 WANKI DAVID TAKWI 116167041 673 945 046 790 100

19 PATIENCE EPS ABONGWA

MESHY NGWA 113858838 677 644 228 2 042 271

20

MUSONGONG JOSEPH

TABIFOR C/O MUSONGONG

JOSEPHINE SINNEWE

117778199 677 148 969 333 600

21 MBA MAURICE C/O MBA

KADJO 117315008 675 953 879, 697 289 328/691 191 385 1 617 400

22 FOKOU PASCAL 107608668 677 578 632 102 000

23 ASANGBE CHARLES TAKWI 107567553 675 729 401 3 278 100

Page 152: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

151

24 TAKU MOSES TABE C/O

OLENDOH BEATRICE 113392277 ……….. 224 400

25 ABONO HUMFRED MBAH

AWANK 113650244 677 520 733, 677 485 512 1 984 800

26 THOMAS ASANJI NGWA 116160172 683 449 567 1 309 364

27 AZIWO TATANJA NIBA 109487373 679 498 574 443 500

28 KAMDEM ANDRE 1148045062 677 764 787 1 230 000

29 ECOLE DES CHAMPIONS …………. ………….. 392 080

30 NGOUONGO CELESTIN 110091188 696 248 972 2 463 920

31 GAMNJE EMMANUEL NGALA 110752194 677601215 4 958 800

TOTAL (B) 72 672 575

C) ARRONDISSEMENT DE BAMENDA III

32 NGANTEH LOUIS NDIFOR 108600470 678 170 379 803 100

33 NGELAH VERONICA NGANTE 113972865 673 476 845 949 320

34

TOTAL CAMEROON (TOTAL

NKWEN 1) (DIRECTION

GENERAL )

……….. 696 020 482 961 700

35

TOTAL CAMEROON (TOTAL

NKWEN 2) (DIRECTION

GENERAL )

……….. 696 020 482 600 000

36

DIRECTION GENERAL

OILIBYA DOUALA C/O

DIRECTION GENERAL

……….. ……….. 600 000

37 SOCIETE S.Q.C HOLDING S.A ……….. 696 921 949 70 200

38 MATIGA Epse. MONJU

CHRISTINA 110958583 676 832 003 833 000

Page 153: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

152

39 NKWEN BAPTIST HEALTH

(MBINGO ANNEX) ……….. ……….. 2 278 500

40 TAFOR ANNA MANKA C/O

ERICK TAFOR 113987402 677 941 463 3 144 300

41 KANGLE PLAZA HOTEL C/O

DUNA BINKEH CECILIA 114797341 677 423 345 479 100

42 NODEM Epse. FOBAH ESTHER 108000210 677 789 438 52 401 500

43 NGENG FAI VALENTINE 106314485 677 578 707 4 070 782

TOTAL (C) 67 191 502

D) ARRONDISSEMENT DE BAMENDA II

44 BONIFACE ACHIRI MANCHO 111280037 677 677 050 365 240

45 MANCHO MBANWEI MARTIN 115601994 677 603 260 240 360

46 AWAH DAVID C/O AWA

CONSULA 114320219 670 011 605 2 456 000

47 MBA CLEMENT ACHU

BERNARD 108577509 677 754 044 1 071 200

48 MADAME GRACE MANDOFI

Epse. FUSI 110328089 670 349 681 418 480

49 MIDENO BAMENDA ………….. …………….. 4 407 200

50 GARAGE ADMINISTRATIVE ………….. …………….. 1 889 200

51

IMMEUBLE N° 75

(PROPRIETAIRE NON

IDENTIFIE)

……………. 672 624 787 3 419 600

52 AGNES MABOH ATANG 115761906 699 911 872 2 204 210

Page 154: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

153

53

IMMEUBLE N° 77

(PROPRIETAIRE NON

IDENTIFIE)

……… ………. 567 000

54 NEW LOOK DONGA PALACE

HOTEL C/O TALA NDI DAVID 1148739292 677 852 438 2 918 200

55

FORBI JOSEPH CHE C/O

MANKA Epse. NDENG

BIBIANA FORBI

117193708/110431663 677 262 238 1 910 800

56 MICHEAL ASABOWA

MUBANG 111511662 677 024 379 1 443 300

57 NJI CHITABANG LINUS 107813960 677 780892, 693 178 783 827 050

58 TATSA FOKWANG NORBERT 113977530 677492386/662310012/670385272 46 466 500

59 SAMBA VIP C/O AZA STELLA 110748891 696 693 257 / 678 575 512 10 329 760

60 HOLIDAY HOTEL NEW LOOK

C/O NGAM CLETUS 111733418 679 882 458 11 399 280

61 SUSANA AFOR 110012324 676 534 651 302 720

62 NANKOBE RICHARD YEMBE 113156737 678 614 561 296 200

63

IMAGIN BAKERY C/O

NJANKENJI NWANYAMA

BONIFACE

107640273 670 499 477/699 875 588 1 504 000

64 BIH SUSANA C/O BIKITI

SAMUEL FRU 113861483 653 472 587/677 560 299 215 937

65 NANGAH BAKERY C/O NGWA

TAMU NANGAH 107840059 695 308 483 4 273 800

Page 155: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

154

66 SAINT SYLVESTER GARDEN

C/O KILO CHARLES BAYUA 108516994 675 407 719 5 242 390

67

IMMEUBLE N° 92

(PROPRIETAIRE NON

IDENTIFIE)

……….. 676 276 111 2 421 100

68 IMMEUBLE N° 93 (ELECAM

BAMENDA SONACK STREET) ……….. …………… 2 142 300

69 NYA GUY FELICIEN 110995961 675 456 966 1 025 300

70

MITANYEN COOPERATIVE

CREDIT UNION LIMITED

(MITACCUL) C/O ACHU

CELESTINE AWA, MULUH

STANLEY

113337264 /116782899 677 492 067/679 471 859 1 430 800

71 MANKAH MARTHA C/O

GABRIEL FUH NGWAMBE 102242069 675 209 884 676 800

72

SOREPCO S.A SONACK

STREET BAMENDA C/O

MATOPE KAPTUE

THEOPHILE

112809990 699 503 311 52 000

73 ANEMBONG BEATRICE

MUNJO 1176499025 677 846 262 1 060 900

74 TAMASANG JOSEPH

AWUNDAGA 113112821 …………… 241 000

TOTAL (C) 113 218 627

TOTAL (A+B+C+D) 260 933 604

Page 156: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

155

Arreté le present devis à la somme de: DEUX CENTS SOIXANTE MILLIONS NEUF CENTS TRENTE TROIS

MILLE SIX CENTS QUATRE FRANCS CFA

Annexe 5 : Termes de référence

TERMES DE REFERENCE D’ELABORATION DU PLAN D’ACTION DE RECASEMENT (PAR) DU PROJET DE

REHABILITATION DE LA ROUTE BABADJOU-BAMENDA Y COMPRIS LES VOIRIES URBAINES (51,970 KM)

I. PRESENTATION DU PROJET

Le nouveau projet de développement et de sécurisation du Transport sur financement BIRD (P150999), en cours de préparation a pour objectif général de contribuer

au renforcement de la planification intégrée du transport multimodal et à l’amélioration de l’efficacité et de la sécurité du transport routier et aérien.

Le projet envisagé sera structuré autour de trois principales composantes, avec une quatrième composante qui consistera à soutenir la mise en œuvre du projet. Elles

se présentent de la manière suivante :

Composante 1 : Renforcement de la planification du transport multimodal ;

Composante 2 : Amélioration de l’efficacité du transport routier ;

Composante 3 : Amélioration de la sureté et de la sécurité du transport aérien ;

Composante 4 : Appui à la gestion et au suivi du projet.

Les activités de la composante 2 se déclinent ainsi qu’il suit :

Sous-composante 2.1 : Réhabilitation et mise à niveau du corridor Yaoundé-Bamenda, y compris amélioration des infrastructures socio-économiques locales de

base :

a) Cette sous-composante contribuera à l’amélioration du niveau de service et de sécurité sur la section routière Babadjou-Bamenda par : l’élargissement et la

reconstruction de la section de route de 45 km située entre Babadjou dans la Région de l’Ouest et Bamenda dans la Région du Nord-Ouest, y compris le

traitement des points accidentogènes identifiés et la surveillance des travaux y relatifs ;

b) La mise à niveau de 12 km de routes de traversée urbaine dans la ville de Bamenda pour relier les tronçons du corridor régional Yaoundé-Bamenda et

Bamenda-Enugu ;

Page 157: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

156

c) La mise en œuvre des mesures d’atténuation des impacts environnementaux et sociaux provoqués par les travaux de génie civil prévus par le projet, à

l’exception des dépenses liées aux indemnisations des populations qui seront affectées ;

d) L’amélioration des routes connexes et des marchés le long du corridor entre Babadjou et Bamenda. Cette approche est en cohérence avec la demande du

gouvernement et l’approche similaire adoptée par le financement parallèle de la BAD sur la section Yaoundé-Bafoussam du même corridor.

Sous-composante 2.2 : Amélioration de la sécurité routière :

Cette sous-composante vise principalement à renforcer la capacité des autorités camerounaises sur l’amélioration et la surveillance de la sureté et de la sécurité. Un

système de base de données de la sécurité routière est prévu dans le cadre du projet de facilitation du transport et de transit en zone CEMAC actuellement en cours.

Le présent projet appuiera son opérationnalisation, aidera à évaluer le nouveau système et procèdera à la correction des défaillances éventuelles qui seront observées.

Cette sous-composante effectuera également l’identification des « points accidentogènes » et financera les mesures d’atténuation des points critiques le long du

corridor Babadjou-Bafoussam. Il sera également pris en charge la conception et la mise en œuvre d’un projet pilote de sécurité routière comme appui aux objectifs

définis dans le plan d’action de la Stratégie nationale de sécurité routière.

Sous-composante 2.3 : Gestion du patrimoine routier :

Cette sous-composante va compléter les activités prévues dans le cadre du financement parallèle de la BAD consistant à renforcer le Fonds d’Entretien Routier du

Cameroun et à améliorer la protection du patrimoine routier.

Les activités de la composante 3 se déclinent ainsi qu’il suit :

Cette composante appuiera la CCAA dans l’amélioration de la sureté et de la sécurité au niveau des quatre aéroports internationaux du Cameroun et de la

surveillance globale de la sécurité et de la sureté de l’industrie de l’aviation civile. Il comprendra les sous-composantes ci-après :

Sous-composante 3.1 : Renforcement de la sécurité dans les quatre aéroports internationaux :

Cette sous-composante financera les travaux de génie civil et les services des consultants pour :

a) La construction d’un Centre de gestion des crises (CDOU) dans chacun des aéroports internationaux de Yaoundé, Garoua et Maroua ;

b) La reconstruction et la réhabilitation d’une clôture autour du périmètre des aéroports de Yaoundé, Douala, Garoua et Maroua ;

c) L’amélioration des routes de patrouille et de services autour des aéroports de Douala, de Yaoundé et de Maroua ;

d) La construction d’une station météorologique classique à Maroua.

Elle financera également les services des consultants pour :

a) Le contrôle et la surveillance des travaux de génie civil dans les quatre aéroports internationaux ;

b) La validation des équipements, le contrôle et la surveillance de l’installation des équipements de surveillance électronique ;

Page 158: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

157

c) Les études de faisabilité de mise en œuvre d’un système de surveillance aérienne par multilatération ;

d) Les études d’aménagement du poste de stationnement isolé de l’aéroport de Yaoundé-Nsimalen ;

e) Les études d’identification des besoins d’infrastructures de base pour les quartiers pauvres situés aux environs des quatre aéroports ; et

f) La préparation des dossiers d’appels à candidatures et des contrats basés sur la performance pour la maintenance, l’entretien et la gestion durables des

infrastructures et des équipements de sureté prévus pour les quatre aéroports.

La sous-composante financera aussi la fourniture et l’installation des équipements pour :

a) Les centres de gestion des crises (CDOU) des aéroports de Yaoundé, Garoua et Maroua ;

b) La surveillance électronique et le contrôle du mouvement des passagers et des bagages dans les quatre aéroports ;

c) La station météorologique classique de Maroua ;

d) L’intégration des rayons X au circuit de convoyage des bagages de soute aux aéroports de Douala et de Yaoundé.

Sous-composante 3.2 : Renforcement de la supervision de la sureté et de la sécurité du transport aérien :

Cette sous-composante fournira une assistance technique, des équipements et un soutien :

a) A la formation en vue d’améliorer la conformité avec les normes et pratiques recommandées de l’Organisation de l’Aviation Civile Internationale (OACI) en

matière de sureté et de sécurité aériennes ;

b) Aux audits de conformité, à la collecte des données ainsi qu’à la préparation et à la mise en œuvre des plans d’actions correctives y relatives.

Sous-composante 3.3 : Amélioration de l’efficacité du transport aérien :

Cette sous-composante financera les services des consultants, les ateliers et les voyages d’études en appui à la mise en œuvre d’une stratégie inclusive de

développement du secteur de l’aviation civile au Cameroun, y compris des études d’opportunités des partenariats publics privés (PPP), le renforcement de la

supervision économique, l’amélioration du cadre réglementaire dans la perspective d’une amélioration de la desserte régionale et domestique.

II. ETAT DE PREPARATION DES DOCUMENTS ENVIRONNEMENTAUX ET SOCIAUX

Le Gouvernement du Cameroun à travers la Cellule BAD/BM a recruté depuis plusieurs mois un consultant Environnementaliste afin de l’appuyer dans le processus

de préparation d’une part du Cadre de Gestion Environnementale et Sociale (CGES) et du Cadre de Politique de Réinstallation (CPR) qui couvrent l’ensemble du

projet et d’autre part conduire une Etude d’Impact Environnemental et Social (EIES) assortie d’un Plan de Gestion Environnementale et Sociale (PGES) ainsi que

d’une Notice de Clauses Environnementales et Sociales (NCES) à insérer dans le Dossier de Consultation des Entreprises (DCE) de la section de route Babadjou-

Bamenda ainsi que d’un Plan d’Actions de Réinstallation (PAR).

Page 159: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

158

Le Consultant a produit en décembre 2015 une première version du CGES et du CPR qui ont été soumises à la revue de la Banque Mondiale en janvier 2016. Les

observations écrites de la Banque ont été reçues le 23 janvier 2016. Une nouvelle version desdits documents a été soumise le 23 mars 2016 et a fait l’objet d’une

nouvelle revue avec pour constat que toutes les observations de la Banque Mondiale n’ont pas été prises en compte.

Ces documents ont été finalisés par une équipe de consultants individuels recrutés à cet effet sur la base des termes de référence spécifiques. En effet, s’agissant du

Cadre de Politique de Réinstallation (CPR), la Banque Mondiale voulait avoir un document assez détaillé afin que celui-ci puisse servir de base de négociation à la

mission d’évaluation ; ce qui ne correspondait aux termes de référence du consultant initial.

De même, le Plan d’Action de Réinstallation (PAR) produit par le consultant initial ne prenait pas en compte les résultats d’évaluation des commissions de constat et

d’évaluation des biens, ce qui risquait d’entrainer la production de deux rapports différents d’évaluation des biens affectés par le projet (l’un par les commissions

d’évaluation et l’autre par le consultant). En vue d’annuler ce risque de divergence, il a été recommandé d’élaborer le PAR après production des rapports de constat

par les commissions d’évaluation. C’est à cet effet qu’un consultant est sollicité pour la réalisation de ladite étude.

III. OBJECTIF DE LA MISSION

L’objectif de la mission est d’élaborer le Plan d’Action de Réinstallation (PAR) suivant les recommandations de la Banque Mondiale en accord avec le Maître

d’Ouvrage.

IV. MANDAT DU CONSULTANT

Il sera chargé de :

La collecte des données complémentaires et de la revue documentaire (Ancien PAR, CGES et CPR, EIES et PGES de la route Babadjou-Bamenda et Rapports des

Commissions de constat et d’évaluation des biens) ;

L’analyse des données disponibles ;

La consolidation des données sur le terrain à travers la tenue des réunions avec les commissions et la consultation des PAP sur la base des rapports des commissions de

constat et d’évaluation des biens ;

La rédaction du rapport du PAR avec intégration des données des commissions de constat et d’évaluation des biens.

V. OBLIGATIONS DU CONSULTANT

Généralités

La responsabilité du Consultant est engagée vis-à-vis de l’Administration de la totalité des tâches exécutées par ses agents et des résultats fournis.

Par ailleurs, il reste soumis aux obligations rappelées ci-après :

Page 160: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

159

Le Consultant devra faire un usage confidentiel des informations reçues de l’Administration. Il restera seul responsable des orientations qu’il propose, l’approbation de

l’Administration étant la seule à pouvoir constater définitivement la bonne exécution de sa mission ;

Il gardera une indépendance d’action absolue vis-à-vis de quelques avantages que ce soit dans le cadre de ses attributions, et s’abstiendra de toutes relations avec ceux

qui seraient de nature à compromettre son objectivité ;

Documents

Le Consultant fera un inventaire de tous les documents mis à sa disposition par le Maître d’Ouvrage et ceux produits au cours de la mission pour les besoins de

contrôle. Ces documents dont il aura la garde, devront être restitués à la fin de la mission. Ils doivent être considérés comme confidentiels et utilisés comme tels.

Ressources matérielles

Le Consultant devra disposer du matériel nécessaire et de ressources satisfaisantes, notamment de secrétariat, d'interprétation et de déplacements, pour pouvoir se

consacrer pleinement à sa mission.

Aucun bien d'équipement ne sera acheté pour le compte du Client au titre des présentes prestations ni transféré au Client à la fin du contrat. Tout bien d'équipement

qui devra être acheté dans le cadre de ses prestations respectera les dispositions de l’accord de financement.

Le coût de location d’équipement ou de matériel, selon les besoins, est considéré comme étant inclus dans la proposition financière du consultant.

VI. PRESENTATION DES RAPPORTS.

Le consultant produira un jeu du rapport final du PAR après la prise en compte des observations du Maître d’Ouvrage et de la Banque Mondiale.

VII. PROFIL DU CONSULTANT.

Le Consultant doit disposer d’une équipe pluridisciplinaire constituée de personnels qualifiés ayant une bonne connaissance des problématiques liées au déplacement

des populations pour cause de projets. L’équipe du consultant doit être constituée de :

Un (01) Expert sociologue diplômé de l’enseignement supérieur (Bac+3 ans ou équivalent) et justifié d’au moins cinq (05) ans d’expérience d’élaboration des

plans d’action de réinstallation ;

Un (01) Ingénieur de génie civil diplômé de l’enseignement supérieur (Bac+3 ans ou équivalent) et justifié d’au moins cinq (05) ans d’expérience en

aménagement routier;

Un (01) Expert Environnementaliste diplômé de l’enseignement supérieur (Bac+3 ans ou équivalent) et justifié d’au moins cinq (05) ans d’expérience;

Page 161: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

160

Un (01) Ingénieur de génie civil diplômé de l’enseignement supérieur (Bac+3 ans ou équivalent) et justifié d’au moins cinq (05) ans d’expérience en gestion

environnementale et sociale des projets.

VIII. DUREE DU RECRUTEMENT.

Le Consultant sera recruté pour une durée de (01) mois

IX. LIEU DE TRAVAIL : YAOUNDE

Page 162: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

161

Annexe 6 : Note méthodologique

REPUBLIQUE DU CAMEROUN

Paix - Travail - Patrie

---------

REPUBLIC OF CAMEROON

Peace - Work - Fatherland

---------

NOTE

Précisant la méthodologie à suivre par les Commissions de Constat et d’Evaluation instituées pour les enquêtes d’expropriation du projet

d’aménagement de la route Babadjou -Bamenda.

Sous la très haute autorité du Président de la République, et sous la coordination effective du Premier Ministre, Chef du

Gouvernement, l’Etat du Cameroun représenté par le Ministère des Travaux Publics (MINTP) et le Ministère de l'Economie, de la Planification

et de l'Aménagement du Territoire (MINEPAT), a engagé des négociations avec la Banque Mondiale pour le financement des travaux de

réhabilitation et de reconstruction de la section routière Babadjou – Bamenda .

Selon les politiques de sauvegardes environnementales et sociales de la Banque Mondiale, l’éligibilité au financement d’un programme

de développement est soutendue par la production des documents garantissant notamment qu’en cas de réinstallation involontaire des

populations impactées, la planification des sauvegardes appropriées par l’emprunteur est soumise à la Banque pour approbation avant l’examen

de la requête de financement. L’élaboration de ces documents requiert en l’occurrence la conduite d’une étude socio-économique dans la zone

d’impact du projet, laquelle doit notamment fournir des informations précises sur les personnes affectées ainsi que les actifs dont l’expropriation

est envisagée.

Aussi, le Gouvernement du Cameroun, en déclarant d’utilité publique les travaux projetés, a mis en place des commissions de constat et

d’évaluation au niveau des départements des Bamboutos et de la Mezam, pour procéder à une évaluation des biens et au recensement exhaustif

des personnes affectées. L’aboutissement heureux de ce processus, complémentaire à la réalisation d’une étude d’impact environnementale et

Page 163: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

162

sociale du projet en cours d’instruction, est consacré par la publication du décret prescrivant notamment une compensation juste et préalable des

personnes affectées, qui serait également convenable au partenaire financier de ce projet.

La présente note précise la méthodologie à suivre par les commissions de constat et d’évaluation chargées des enquêtes d’expropriation

des terrains d’assiette destinés au projet d’aménagement de la route Babadjou -Bamenda dont le financement est activement recherché auprès du

Groupe de la Banque Mondiale.

La réalisation de ce projet étant projeté dans le cadre d’un accord de crédit spécifique dont les politiques de sauvegardes

environnementales et sociales de la Banque Mondiale en feront partie intégrante, le Gouvernement du Cameroun s’est engagé conformément

aux dispositions législatives et réglementaires en vigueur à diligenter les procédures concourant à la compensation effective et préalable des

personnes affectées suivant les principes ci-après :

1. La date butoir d’éligibilité à la compensation y compris les aides à la réinstallation est celle du 4 avril 2016, date de publication des

arrêtés portant déclaration d’utilité publique dudit projet ;

2. Les actifs mis en cause seront classés dans les trois catégories suivantes :

a) les terrains objet d’un droit de propriété privée ou en cours d’immatriculation à la date précitée;

b) les terrains du domaine national de 1ère catégorie sur lesquelles la possession coutumière est reconnue aux populations qui en

poursuivent l’occupation ou l’exploitation paisible;

c) les terrains domaniaux (Domaine public, domaine privé de l’Etat et domaine national de 2ème catégorie), sur lesquels toute

occupation de bonne foi est subordonnée à une autorisation préalable de l’autorité compétente ;

3. Les personnes affectées détentrices d’un droit de propriété de jure ou de facto (possession légalement reconnue par la loi foncière) sont

éligibles à la compensation des terres expropriées, des mises en valeur frappées d’expropriation ainsi qu’à toute forme d’aide à la

réinstallation ;

4. Les personnes affectées et sans droit ni titre sur les terres expropriées ne sont pas éligibles à la compensation pour les terres qu’elles

occupent. En lieu et place de la compensation attendue pour le foncier, elles recevront toute forme d’aide à la réinstallation ainsi que la

compensation intégrale de toutes les impenses réalisées par leurs soins sur les fonds mis en cause ;

Page 164: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

163

5. En cas d’expropriation partielle d’un actif, si la partie restante n’est pas économiquement viable, la victime recevra une compensation et

toute autre forme d’aide à réinstallation comme si la totalité de l’actif avait été perdue ;

6. La méthode d’estimation des actifs est celle par sol (nue-propriété) et mises en valeurs, lesquelles regroupent en l’occurrence, les

cultures et les constructions ;

7. La nue-propriété sera évaluée selon le taux fixé par la mercuriale fiscale en vigueur actualisée au taux d’inflation et majorée des coûts de

transactions ;

8. Les cultures pérennes seront expertisées selon les barèmes fixés par le Décret régissant l’évaluation des cultures expropriées pour cause

d’utilité publique préalablement actualisés au taux de 4% ;

9. Les constructions et autres mises en valeur seront estimées à leur valeur de reconstruction à neuf établie par l’expert membre de la

commission d’enquête d’expropriation, majorée des frais divers de transactions ;

10. La procédure de recours est celle définie par la loi sur l’expropriation et l’indemnisation, et suivant laquelle toutes les requêtes sont

préalablement examinées par la Commission en charge des enquêtes d’expropriation.

Afin de raffermir l’efficacité des commissions d’enquête administrative et favoriser leur fonctionnement rationnel suivant les principes

sus rappelés, les mesures ci-après relatives à l’accomplissement des formalités préalables, concomitantes et postérieures aux travaux des

commissions de constat et d’évaluation doivent faire l’objet d’une observation scrupuleuse et sans réserves.

I. DES FORMALITES PREALABLES AUX ENQUETES D’EXPROPRIATION

Outre les formalités requises par les dispositions pertinentes du Décret n°87/1872 du 16 décembre 1987 portant application de la Loi

n°85/09 du 04 juillet 1985 relative à l’expropriation pour cause d’utilité publique et aux modalités d’indemnisation, les travaux de la

commission chargée de l’enquête d’expropriation doivent impérativement être précédés :

3. d’une publicité adéquate, à la diligence du Préfet compétent, par voie d’affichage à la Préfecture, au Service Départemental des

Domaines, à la Mairie, à la Sous-préfecture et à la Chefferie du lieu de situation du terrain ainsi que par tous autres moyens jugés

nécessaires en raison de l’importance de l’opération ;

Page 165: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

164

4. de la communication aux personnes affectées, par tous moyens pertinents laissant trace, du dossier soumis à enquête publique, des

principes devant régir le processus d’expropriation et d’indemnisation, des options qui leur sont offertes et des droits se rattachant à la

réinstallation involontaire le cas échéant.

Le président de la commission doit en outre s’assurer auprès du Ministre des Travaux Publics de la disponibilité à bonne date de toute la

logistique et des documents techniques nécessaires pour l’accomplissement des enquêtes d’expropriation et en l’occurrence :

i. Le rapport de l’étude d’avant-projet détaillé des travaux envisagés et notamment du tracé en plan de la route en cause, lequel doit

notamment préciser l’emprise sollicitée pour la mise en œuvre adéquate de ce projet ;

ii. Les fiches de collecte des données dégageant toutes les informations permettant de faciliter la catégorisation des personnes et des

biens ainsi que leur évaluation.

II. DES FORMALITES CONCOMITTANTES AUX TRAVAUX D’ENQUETE D’EXPROPRIATION

Les travaux d’enquête d’expropriation conduits par la commission de constat et d’évaluation vont connaitre trois principales

articulations à savoir : les travaux de terrain, les sessions délibératives et celle consacrée à la restitution des travaux de la commission.

Conformément aux dispositions des articles 4 et 7 et 12 du Décret n°87/1872 du 16 décembre 1987, les travaux de terrain, qui

s’effectuent en présence des propriétaires des fonds de terre et des biens mis en cause ainsi que des notabilités et des populations dûment

convoquées, visent d’une part le choix du terrain à exproprier et l’identification exhaustive des propriétaires des biens à détruire et

d’autre part, la consultation des populations affectées en vue de recueillir leurs observations éventuelles sur le projet pour lequel

l’expropriation est poursuivie.

Le Président de la Commission d’enquête d’expropriation veillera à l’approbation expresse du choix du terrain d’assiette du projet et de

la liste exhaustive des personnes affectées, laquelle devra notamment ressortir, outre les détenteurs d’un droit de propriété de jure ou de facto,

toutes les personnes sans droit ni titre dont les mises en valeur probantes sont réalisées sur le site choisi.

A cet égard, au cours de la session consacrée à l’accomplissement de cette diligence, les participants sont appelés à délibérer au vu des

documents ci-après:

1. Le plan du site dont l’expropriation est poursuivie, établi conformément aux normes cadastrales en vigueur et dûment visé par le géomètre

membre de la commission ;

2. Le sommier des personnes affectées, assorti des fiches individuelles de recensement et des copies des cartes nationales d’identité des

personnes recensées.

Page 166: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

165

L’approbation expresse visée est matérialisée par la signature séance tenante par tous les membres de la commission, sous réserves des

règles de quorum établies, des documents énumérés ci-dessus à savoir le plan du site et la liste exhaustive des personnes affectées.

Une fois cette étape franchie, le président de la commission doit prescrire aux autorités compétentes :

1. la suspension de toute transaction, de toute mise en valeur et de toute délivrance de permis de construire sur les terrains choisis ;

2. le recensement des requêtes d’immatriculation directes introduites avant la date de publication de l’acte de déclaration d’utilité publique

des travaux projetés.

La commission peut en outre instituer en son sein, une sous-commission technique comprenant au moins les cellules opérationnelles ci-

après :

- la cellule chargée de l’expertise des nues propriétés des terrains, y compris les dépendances du domaine national de 1ère catégorie

dont les impenses sont mises en cause;

- la cellule chargée des travaux cadastraux ;

- la cellule chargée de l’expertise des cultures ;

- la cellule chargée de l’expertise des constructions et autres mises en valeur.

Ensuite, les travaux des terrains portent notamment sur :

1. la pose des panneaux indiquant le périmètre des terrains à exproprier ;

2. le constat des droits et l’identification de leurs titulaires ;

3. l’évaluation des biens mis en cause et l’identification de leurs propriétaires dans le strict respect des principes rappelés supra.

Ces travaux sont sanctionnés par l’établissement et l’approbation expresse par l’ensemble de la Commission, des documents principaux

suivants:

1. les états d’expertise des nues propriétés des terrains y compris les dépendances du domaine national de 1ère catégorie dont les

impenses sont mises en cause;

2. les états d’expertise des cultures ;

3. les états d’expertise des constructions et autres mises en valeur ;

4. les procès-verbaux de bornage et d’enquête d’expropriation.

Page 167: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

166

La consultation des populations affectées par le projet constitue la dernière articulation des travaux de terrain. Elle vise d’une part à recueillir

leurs observations éventuelles sur le projet pour lequel l’expropriation est poursuivie et d’autre part à faire la publicité du rapport de la

Commission afin d’enregistrer les avis des victimes potentielles sur les conclusions de l’étude et prévenir le contentieux résultant.

Ces consultations font l’objet d’un rapport spécial qui sera annexé au dossier soutenant la préparation du décret consacrant

l’expropriation des terrains d’assiette du projet sous rubrique ainsi que la compensation des populations concernées.

Le projet facilitera la participation continue des PAP pendant la mise en marche du programme, il privilégiera un processus consensuel de résolution des plaintes et

engagera une ONG ou bureau d’étude pour assurer le suivi et l’évaluation du programme en proche collaboration avec les PAP.

Des rencontres d’information seront tenues pendant toute l’opération de réinstallation avec les différents PAP.

Ces rencontres seront tenues, soit collectivement, soit individuellement, selon la nécessité.

La diffusion des informations et la consultation du public se feront pendant ces réunions.

Les objectifs de cette campagne d’information sont les suivants :

Susciter l’adhésion, la coopération et la participation des personnes affectées et des communautés aux activités prévues dans le plan de réinstallation;

assurer la transparence dans toutes les étapes de la mise en œuvre du plan de réinstallation ;

faciliter tout autre aspect du programme.

Pour mettre en marche ces programmes, le Maître d’Ouvrage instituera un programme social sous la responsabilité de l’unité socio-environnementale de la Cellule

BAD/BM et avec l’assistance de l’ONG qui collabore dans le cadre du programme de relocalisation.

Le but de ce programme est d’assurer les actions suivantes (qui ne sont pas limitées) :

s’assurer que les autorités locales sont bien informées de tous les aspects de l’opération et y collaborent;

Organiser avec les PAP leur déménagement /réinstallation sur les nouveaux sites;

Fournir toute assistance nécessaire aux PAP pendant la période de déménagement et réinstallation;

Assurer que toutes les familles rétablissent leur situation sociale et leur revenu antérieur au déplacement dans des délais raisonnables.

III. DES FORMALITES POSTERIEURES AUX TRAVAUX DE LA COMMISSION

Le président et les membres de la commission doivent veiller à ce que :

- les procès-verbaux des travaux soient rédigés conformément aux résolutions de la commission ;

- les procès-verbaux et les états d’expertise soient signés de tous les membres, sous réserve de l’atteinte du quorum requis ;

Page 168: REHABILITATION DE LA ROUTE BABADJOU BAMENDA Y … · SFG2312 V2. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

167

- le procès-verbal de bornage et le plan parcellaire du site retenu soient signés du Géomètre, membre de la commission et reflètent l’état

des lieux tout en précisant les coordonnées topographiques du terrain ;

- le dossier complet des travaux de la commission établi en trois (03) exemplaires (procès-verbal d’enquête, procès-verbal de bornage et

plan parcellaire, état d’expertise des nues propriétés des terrains immatriculés ou en cours d’immatriculation, état d’expertise des

cultures, état d’expertise des constructions et autres mises en valeur, arrêté désignant nommément les membres de la commission) soit

transmis au Ministre chargé des Domaines, huit (08) jours au plus tard, après la date de la session de clôture des travaux. Il est assorti

du rapport spécial sanctionnant la consultation des populations affectées et signé de toutes les parties prenantes.

Une copie électronique de l’état consolidé des différents états d’expertise dressé selon le canevas ci-joint doit être transmise,

concomitamment, au Ministre en charge des Domaines. /-