©GEOVIL KFT.
GEOVIL Kft. GEOTECHNIKAI IRODA
2000 Szentendre, Ady E. u. 44/b.
www.geovil.hu; [email protected]
Geotechnical monitoring of tunnell worksDr. Tibor Horváth
GEOVIL Kft. – Canterbury Engineering Association LTD.
2015.04.17.
Tunnel collapses
Köln, 2009.03.03 Budapest 4 metró,Rákóczi tér
Geotechnical monitoring of NATM ( SCL) tunnelling
works
Geotechnical monitoring at deep Excavation
Inklinométer hiánya!
©GEOVIL KFT.
I. Goal of geotechnical monitoring:
Why we need monitoring ?
- Primery: monitoring of natural enviroment and constructed surroundings, before – under and after the
construction works
- Secondary: Changeing and modification of geotechnical parameters, interaction among soil/ rock
and stucture in time ( short term – long term design)
- Tertiary: back analysis, redising of data and design control
What can we measure and what does it worth to measure ?-- strain in the structure and layers;
-- stresess in the structure and layers;
-- pore pressure – total stress – effective stress
©GEOVIL KFT.
Monitoring inside the tunnel
• convergence measurement
• movement around the tunnel
• stress and strain in the lining and arround
the tunnel
In - outside monitoring of tunnells
Part 1. Monitoring in side the
tunnel
• - convergence measurement
• - movement around the tunnel
• - stress and strain in the lining and around
the tunnel
Convergence measurement by geodetical survey
©GEOVIL KFT.
©GEOVIL KFT.
Equipments of geodetical survey
Convergement measuring by Total Station
©GEOVIL KFT.
Convergence measurements- readings and
data development
Convergence measurement curve
Crack measurement on tunnel lining
Part 2. Monitoring inside the
tunnel
• convergence measurement
• movement outside- around the
tunnel
• stress and strain in the lining and around
the tunnel
Extensometer
©GEOVIL KFT.
Application of revers head extensometer
Tunnel face
Cable outgoing and tube
Injected anchor
Head of extensometer -data colector
©GEOVIL KFT.
Borehole
Reverse head extensometer arrangement
Direction of tunnel construction
©GEOVIL KFT.
Reverse head extensometer under Danube river
©GEOVIL KFT.
Part 3. Monitoring in side the
tunnel
• convergence measurement
• movement outside the tunnel
• stress and strain in the lining and
around the tunnel
©GEOVIL KFT.
Pressure cells ( radial and tangential ) installation
Monitoring outside the tunnell
• Surface settlement
• Displacement around the tunnel
• Stress distribution around the tunnel
Part 4. Monitoring outside the tunnell
• Surface settlement• Displacement around the tunnel
• Stress distribution around there tunnel
©GEOVIL KFT.
Settlement readings
Part 5. Monitoring outside the tunnell
• Surface settlement
• Displacement around the tunnel
• Stress distribution around the tunnel
Inclimométer for
horizontal
displacement
Extensometer
for vertical
displacement
Piezometers,
pore pressure
measurement
©GEOVIL KFT.
Inclinometer
©GEOVIL KFT.
Inclinometer installation at slurry trench
excavation. Inclinometers are installed in the
structure.
©GEOVIL KFT.
Piezometer ( pore pressure and water level
measurement)
Part 6. Monitoring outside the tunnel
• Surface settlement
• Displacement around the tunnel
• Stress distribution around the tunnel
©GEOVIL KFT.
Borehole pressure cells)
SMS- Stress Monitoring Station’s readings
Budapest 4. metroline, Bocskai station
Bohehole cells
0
0,5
1
1,5
2
2,5
3
3,5
4
4,5
2008. 5. 19. 23:2
9
2008. 5. 26. 15:5
8
2008. 6. 2. 8:2
8
2008. 6. 9. 0:5
8
2008. 6. 15. 17:2
8
2008. 6. 22. 9:5
8
2008. 6. 29. 2:2
8
2008. 7. 5. 18:5
8
2008. 7. 12. 11:2
8
2008. 7. 19. 3:5
8
2008. 7. 25. 20:2
8
kő
zetn
yo
más -
cell
ák [
bar]
1-cella 2-cella 3-cella 4-cella 5-cella
©GEOVIL KFT.
©GEOVIL KFT.
GEOVIL Kft. GEOTECHNIKAI IRODA
2000 Szentendre, Ady E. u. 44/b
www.geovil.hu; [email protected]
Thank you for your kind attention.
Dr. Horváth Tibor